BLD-Aging Inspection | 12/12/2003 | 12/12/2003 | 12/12/2003 | | DONE |
Russ Owen
|
|
|
i called richard and he will look into why no co.12/12/2003 9:44:49 AM 12/12/2003 9:47:05 AM
|
BLD-Final | 5/31/2002 | 5/31/2002 | 5/31/2002 | P | PASS |
Russ Owen
|
|
|
###-#### RICHARD ok perm oc. 5/31/2002 4:06:29 PM
|
Permanent Occupancy | | 5/31/2002 | 5/31/2002 | | DONE |
|
|
|
|
BLD-Final | 5/16/2002 | 5/17/2002 | 5/17/2002 | P | FAIL |
Russ Owen
|
|
|
###-####c/n posted temp oc only. 5/17/2002 4:10:42 PM
|
FIRE-Final Inspection | 5/17/2002 | 5/17/2002 | 5/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Fire life/safety, fire alarm and fire sprinklers finaled
|
FIRE-Final Inspection | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | CANC |
Troy Cobbley
|
|
|
duplicate inspection 5/17/2002 1:14:17 PM
|
FIRE-Final Inspection | 5/14/2002 | 5/16/2002 | 5/16/2002 | A | NR |
Troy Cobbley
|
|
|
###-#### richard
|
BLD-Conference | 5/14/2002 | 5/15/2002 | 5/15/2002 | A | PART |
Russ Owen
|
|
|
conference only ###-#### richard went over final req. 5/16/2002 10:23:05 AM
|
BLD-Conference | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/3/2002 2:49:18 PM went over with plan review. 5/3/2002 4:16:05 PM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/3/2002 4:52:25 PM
|
BLD-Framing/Rough-in | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/1/2002 1:45:08 PM ok to cover lid in exterior canopy ok . 5/2/2002 12:08:27 PM
|
BLD-Framing/Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 4/30/2002 5:32:34 PM
|
BLD-Framing/Rough-in | 4/29/2002 | 4/30/2002 | 4/30/2002 | P | NR |
Russ Owen
|
|
|
burl- ###-#### r/i
|
BLD-Framing/Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | PART |
Russ Owen
|
|
|
PARAPET WALL - BUREL ###-####At the front of store work is near completion at the 2hr wall, need a change for ceiling over the bay portion. 4/26/2002 1:53:20 PM
|
BLD-Concrete | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | CANC |
Russ Owen
|
|
|
BURL ###-#### OR RICHARD ###-####. would like about 1:30-2:00 if possible. 4/23/2002 12:20:14 PM
|
BLD-Framing/Rough-in | 4/22/2002 | 4/23/2002 | 4/23/2002 | P | PART |
Russ Owen
|
|
|
BURL ###-#### OR RICHARD ###-####. Area at front of store, needs 2hr wall to be complete thru the soffit, At roof the 4 blocks added are ok to pour. 4/23/2002 2:30:43 PM
|
BLD-Concrete | 4/19/2002 | 4/22/2002 | 4/22/2002 | A | NR |
Russ Owen
|
|
|
concrete- richard- ###-#### or burle- ###-####
|
BLD-Concrete | 4/18/2002 | 4/19/2002 | 4/19/2002 | A | PASS |
Russ Owen
|
|
|
BUREL ###-#### OR DAVE ###-#### bond beam under door opening. 4/19/2002 12:26:34 PM
|
BLD-Framing/Rough-in | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | PART |
Russ Owen
|
|
|
###-#### larry \\groutingnew detailstamp by engineer ok. 4/12/2002 12:15:05 PM
|
BLD-Other | 4/9/2002 | 4/10/2002 | 4/10/2002 | A | PASS |
Tom Arcoraci
|
|
|
GROUTING MASONRY ###-#### LARRY needs stamped eng and specs 4/10/2002 10:12:20 AM
|
BLD-Framing/Rough-in | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 4/5/2002 4:33:27 PM ok except need bottom lateral support for draft stops. 4/8/2002 5:26:23 PM
|
BLD-Framing/Rough-in | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | CANC |
Russ Owen
|
|
|
###-#### larry
|
BLD-Conference | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | CANC |
Jim Sly
|
|
|
###-#### LARRY Contr. cancelled. 3/28/2002 8:48:21 AM
|
BLD-Conference | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PART |
Russ Owen
|
|
|
###-#### larry . . questions on the area separation wall. 3/28/2002 5:14:40 PM
|
BLD-Footing | 2/5/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Conference | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### LARRY ft insp required and comp test 1/25/2002 11:02:22 AM
|