BLD-Final | 2/20/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 17:02:52. Contact: ###-####...card to bldr, ok for c/o. 2/25/2002 2:11:36 PM
|
FIRE-Final Inspection | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 17:01:05. Contact: ###-####.
|
Permanent Occupancy | | 2/21/2002 | 2/21/2002 | | DONE |
|
|
|
|
BLD-Other | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 11:16:46. Contact: ###-####. Firestop ass'y ok at 2hr floor (sink) 2/21/2002 9:21:53 AM
|
FIRE-Final Inspection | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 12:35:44. Contact: ###-####. occupant load sign; door hardware removed and sign; 2/19/2002 9:23:48 AM
|
BLD-Other | 1/22/2002 | 1/23/2002 | 1/23/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/22/2002 at 16:55:13. Contact: ###-####...part, ok to move service counter, rec'd modified drawing; complete firestops at floor sinks per detail...lower side from floor below, ok to continue. 1/23/2002 11:24:24 AM
|
BLD-Framing/Rough-in | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/11/2002 12:53:18 PM tunnel lids by corridor ok
|
BLD-Other | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 14:43:45. Contact: ###-####. grid...c/n, support offsets, add perim wires as need, chk at final. 1/11/2002 12:52:34 PM
|
FIRE-Sprinkler Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PASS |
Rick Jackson
|
|
|
###-#### james okay to cover 1/10/2002 8:46:36 AM
|
BLD-Other | 1/7/2002 | 1/8/2002 | 1/8/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 17:13:59. Contact: ###-####. ok to use tunnel ceiling at rooms adjacent to corridor....not specified on plan 1/8/2002 5:47:15 PM
|
BLD-Wall cover | 12/26/2001 | 12/26/2001 | 12/26/2001 | P | PART |
Carl Dependahl
|
|
|
###-####...walls ok 12/26/2001 2:26:37 PM
|
BLD-Conference | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/21/2001 7:09:25 PM w/ bldr re rated walls, floor penetrations.
|
BLD-Conference | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/21/2001 7:09:25 PM w/ bldr re rated walls, floor penetrations.
|
BLD-Conference | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/20/2001 3:09:38 PM w/ bldr re insp req's
|