Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02771
StatusFinaled
Name DEBRHA J CARNAHAN LAW OFFICE
Site Address 101 S CAPITOL BLVD
Project NameUS BANK-4TH FLR
Customer Number 
ePlanReviewNo
Description
(DEBRHA J CARNAHAN LAW OFFICE)(US BANK-SUITE 400) To remodel a 1,687 sq.ft. office space for new tenant per approved plans on file. Work to include construction of new rated doors into rated main corridor, new rated wall surrounding entry doors, new interior office partitions and miscellaneous finish. NOTE: This building is fully fire sprinklered. (P.C.#0806-01) mys
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/26/200112/26/200112/26/2001PPASS
DetailsCarl Dependahl
###-####, firesafing installed 12/26/2001 1:49:27 PM
Permanent Occupancy 12/26/200112/26/2001 DONE
Details
FIRE-Final Inspection12/24/200112/24/200112/24/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 12/24/2001 12:22:41 PM Fire life/safety finaled
BLD-Framing/Rough-in12/20/200112/21/200112/21/2001APART
DetailsCarl Dependahl
above ceiling insp dave ###-####...add firesafing at window areasper plan note 14.
chk at final 12/21/2001 2:39:52 PM
FIRE-Final Inspection12/21/200112/21/200112/21/2001PFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 12/21/2001 2:03:31 PM need lobby door hardware and closure; alarms tested okay; 12/21/2001 2:08:01 PM
FIRE-Sprinkler Rough-in12/5/200112/5/200112/5/2001AFAIL
DetailsRick Jackson
Added by Inspector: 409 On 12/5/2001 9:50:52 AM not approved for cover; more than one head per drop in same fire area
BLD-Framing/Rough-in12/3/200112/3/200112/3/2001PPART
DetailsJim Storey
###-#### CHRIS wall framing covered with out insp. corridor west wing wall and ceilling not complet gyp. need reinsp/ primary steel protection needs repaced. 12/3/2001 3:41:49 PM