BLD-Aging Inspection | 7/4/2005 | 7/4/2005 | 7/6/2005 | | CANC |
Jim Sly
|
|
|
Expired
|
DOC - Permit Expired | 7/6/2005 | 7/6/2005 | 7/6/2005 | P | PASS |
Jim Sly
|
|
|
As per Dave Hannah ... I assume Dave did the research when he finaled this permit. He stated that the scope of work was transferred to a 2002 permit and was part of a phased construction.
|
BLD-Final | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/13/2002 at 10:02:21. Contact: ###-####. ok for occ the work on this permit is now under a 2002 permit this was phase one of a three part remodel 3/14/2002 9:34:48 AM
|
FIRE-Final Inspection | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Troy Cobbley
|
|
|
Fire life safety finaled. FIRE ALARM SYSTEM NOT FINALED 3/13/2002 3:51:12 PM
|
BLD-Final | 3/8/2002 | 3/11/2002 | 3/11/2002 | P | CANC |
Dave Hannah
|
|
|
jim ###-#### fn occ temp
|
FIRE-Final Inspection | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | NR |
Troy Cobbley
|
|
|
exit signs and fire extinguishers need to be installed 3/11/2002 11:26:57 AM
|
BLD-Final | 3/7/2002 | 3/8/2002 | 3/8/2002 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 17:18:24. Contact: ###-####. needs other trades sing offs 3/8/2002 3:27:55 PM
|
BLD-Framing/Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 | P | PASS |
Russ Owen
|
|
|
ceiling grid\\###-#### jim
|
BLD-Framing/Rough-in | 2/8/2002 | 2/11/2002 | 2/11/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/08/2002 at 13:11:17. Contact: ###-####.west wall ok. 2/11/2002 11:12:12 AM
|
BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 16:43:50. Contact: ###-####. steel studs infill of roll up doors insulated and one layer of rock on one side ok to add next layer of rock this is a 2hr wall 1/30/2002 10:04:51 AM
|