Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-02877
StatusFinaled
Name BRIAN SMITH
Site Address 2442 W HILL RD
Project NameHILLSIDE
Customer Number 
ePlanReviewNo
Description
To construct a 2488 sq. ft. two story single family dwelling with a 676 sq. ft. attached two car garage, a 96 sq. ft. covered concrete entry porch, a 340 sq. ft. covered wood deck off 2nd level and a 196 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1040 sq. ft.) (2nd floor 1448 sq. ft.) This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area is required. Automatic sprinkler requirements waived by Sam Rogers (11-09-01) PC #762 CFH #01-00029 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/200211/4/200211/4/2002PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/01/2002 at 16:00:12. Contact: ###-####.
BLD-Final10/31/200211/1/200211/1/2002ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 10/31/2002 at 15:46:36. Contact: ###-####.
BLD-Final11/1/200211/1/200211/1/2002PNR
DetailsTony Young
BLD-Final11/1/200211/1/200211/1/2002PNR
DetailsTony Young
BLD-Final10/28/200210/28/200210/28/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/28/2002 at 10:33:01. Contact: ###-####....keep c/n, need elec, pool eng'g... 10/29/02 9:26:07 AM
BLD-Grading Inspection10/24/200210/24/200210/24/2002 BOND
DetailsRita DeYoung
Grading and drainage have been completed. Revegetation is not complete but a $400.00 bond has been submitted to ensure satisfactory completion. Therefore, the grading is conditionally approved.
BLD-Concrete6/19/20026/19/20026/19/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/19/2002 at 08:13:49. Contact: ###-####. city approved plans call for the pool tobe 8" cast in place concrete/shot crete with #4s at 12" oc ew contracter has a cast in place bottom with cmu walls need engineering for walls 6/19/2002 3:03:57 PM
BLD-Footing5/16/20025/16/20025/16/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/16/2002 at 10:09:04. Contact: ###-####. bottom of pool needs engineering for sides of pool 5/16/2002 3:56:43 PM
BLD-Wall cover5/15/20025/15/20025/15/2002PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 05/15/2002 at 09:32:50. Contact: ###-####.
BLD-Framing/Rough-in5/10/20025/10/20025/10/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/10/2002 at 08:50:34. Contact: ###-####.
ok to insulate, unaffected areas only, c/n still posted 5/10/2002 3:57:33 PM
BLD-Framing/Rough-in5/8/20025/9/20025/9/2002AFAIL
DetailsJim Storey
1. (Fire blocks and draft stops) In combustible construction, fireblocking and draftstopping shall be installed to cut off all concealed draft openings (both vertical and horizontal) and shall form an effective barrier between floors, between a top story and a roof or attic space, and shall subdivide attic spaces, concealed roof spaces and floor-ceiling assemblies. The integrity of all fire blocks and draft stops shall be maintanined. (1997 UBC 708.1)

2. need fire place permit and insp./ return air in exterior wall cavity must meet engery code report/ 4 " dryer duct must be in 4" wall space.
BLD-Conference4/25/20024/26/20024/26/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 04/25/2002 at 14:58:15. Contact: ###-####.
conf. on framing 4/26/2002 10:51:59 AM
BLD-Framing/Rough-in2/11/20022/11/20022/11/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/11/2002 at 08:26:41. Contact: ###-####.ext shear nailing ok 2/12/2002 7:37:45 AM
BLD-Framing/Rough-in2/6/20022/7/20022/7/2002AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 02/06/2002 at 11:35:24. Contact: ###-####.
not complete 2/7/2002 11:17:38 AM
BLD-Foundation1/29/20021/29/20021/29/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 01/29/2002 at 11:23:33. Contact: ###-####.
rear/west retaining wall 1/29/2002 2:57:37 PM
BLD-Footing1/14/20021/15/20021/15/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/14/2002 at 15:00:46. Contact: ###-####. owner bldr has photos...soi 1/15/2002 12:28:22 PM ls report not onsite; east portion previously poured & insp'd 1/15/2002 12:30:33 PM
BLD-Footing1/11/20021/11/20021/11/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 01/11/2002 at 09:55:48. Contact: ###-####.
int. ftgs ok 1/11/2002 3:28:20 PM
BLD-Grading Inspection12/20/200112/20/200112/20/2001 PASS
DetailsRita DeYoung
The geotechnical engineer has approved the subgrade for all of the house footings and the retaining wall on the east side of the house.
BLD-Footing12/19/200112/19/200112/19/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/19/2001 at 11:18:18. Contact: ###-####.wip 12/19/2001 4:08:36 PM
BLD-Footing12/12/200112/13/200112/13/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/12/2001 at 16:44:27. Contact: ###-####. northeast retaining wall footing 12/13/2001 11:04:26 AM
BLD-Footing12/13/200112/13/200112/13/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/13/2001 at 11:01:01. Contact: ###-####.done by 408 already 12/13/2001 3:45:36 PM
BLD-Foundation12/10/200112/10/200112/10/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/10/2001 at 08:23:12. Contact: ###-####.
8' wall, wip, ok when ready for wall only, no ftgs yet 12/10/2001 2:18:47 PM
BLD-Footing12/3/200112/3/200112/3/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/03/2001 at 08:50:46. Contact: ###-####.ok for part of rear retaining wall ftg pending soil report, pass 12/4/2001 10:12:09 AM