BLD-Final | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 09:21:41. Contact: ###-####. c/n ok ,ok for c/o 3/26/2002 2:52:54 PM
|
Permanent Occupancy | | 3/26/2002 | 3/26/2002 | | DONE |
|
|
|
|
BLD-Final | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Carl Dependahl
|
|
|
fn occ- ###-####- allan ;elec finalled on card 3/22/2002 1:36:51 PM c/n; door closer, ok for t/o 3/22/2002 2:26:27 PM
|
FIRE-Final Inspection | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### ALAN corridor pents ok, landing still in complete 3/4/2002 2:02:48 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 2/28/2002 5:26:13 PM c/n: seal corridor penetrations, landing at storage 3/1/2002 12:16:24 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | NR |
Carl Dependahl
|
|
|
###-####; unable to contact left msg. 2/28/2002 6:14:46 PM
|
FIRE-Sprinkler Rough-in | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/22/2002 12:38:07 PM okay to cover; r/i okay
|
BLD-Framing/Rough-in | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | PART |
Russ Owen
|
|
|
###-####. 18 in clearance at lower east door would be acccepable. 1/10/2002 3:19:18 PM
|
BLD-Framing/Rough-in | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### walls ok pend elec 12/21/2001 6:43:52 PM
|
BLD-Framing/Rough-in | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | NR |
Carl Dependahl
|
|
|
###-####, nh, recall 12/20/2001 4:01:14 PM
|