To construct a 3780 sq. ft. two story single family dwelling with a 859 sq. ft. unfinished basement (designated storage), a 910 sq. ft. attached three car garage, a 80 sq. ft. covered entry porch and a 96 sq. ft. 2nd level deck per approved plans, condition lists and all engineering/red-lining. (1st floor 2137 sq. ft.)(2nd floor 1035 sq. ft. with a 608 sq. ft. unfinished bonus room). Note: Basement and unfinished bonus room will require seperate permits to finish or convert to habital space. Scope of work will also include the construction of a 525 sq. ft. swimming pool at rear of structure. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be maintained. PC #796 CFH01-00030 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/25/20029/26/20029/26/2002APASS
DetailsTom Arcoraci
Tony, I have $$ on file to cover the driveway, revegetation, downspout, grading, etc.
- Cathy
BLD-Grading Inspection9/20/20029/20/20029/20/2002 BOND
DetailsRita DeYoung
Rough grading is complete. Fine grading, roof drains, revegetation are not. Engineer recommended a $2700.00 bond for completion of these items. Upon receipt of the bond the grading and drainage is conditionally approved.
BLD-Framing/Rough-in7/11/20027/15/20027/15/2002APASS
DetailsTony Young
darrell ###-####
BLD-Conference7/11/20027/12/20027/12/2002APASS
DetailsCarl Dependahl
darrell ###-#### ok to put in conf for today per carl...will fix treads. 7/12/2002 11:47:13 AM
BLD-Conference7/11/20027/11/20027/11/2002PPASS
DetailsCarl Dependahl
darrell ###-#### ok to put in conf for today per carl; need to fix stairs ...< 9", ok to cover except at fireplace & stairs 7/11/2002 5:09:18 PM
BLD-Energy code compliance7/3/20027/5/20027/5/2002APART
DetailsTony Young
###-####
ok to cover pending f/p pass 7/5/2002 11:23:20 AM
BLD-Framing/Rough-in6/28/20027/1/20027/1/2002AFAIL
DetailsJim Sly
darrell-- -cell ###-#### re-insp fr C/N posted. 7/1/2002 10:29:21 PM
BLD-Framing/Rough-in6/24/20026/24/20026/24/2002PFAIL
DetailsTony Young
darrell wilson- call 1st before insp ###-####
c/n posted,,, no insulation 6/24/2002 4:18:11 PM
BLD-Framing/Rough-in5/6/20025/6/20025/6/2002PPART
DetailsTony Young
###-#### DARRELL SHEER INSPECT
ext shear ok, verify completion of hds at frame, nailing ok on exterior 5/6/2002 3:06:19 PM
BLD-Framing/Rough-in4/25/20024/29/20024/29/2002AFAIL
DetailsTony Young
shear\\###-#### wilson
need struct. engineer to look at changes, provide letter of compliance 4/29/2002 10:27:16 AM
BLD-Foundation3/22/20023/22/20023/22/2002APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/22/2002 11:04:08 AM ok to pour garage portion; noted missed holdowns at various locations all ready poured...advised sub contractor to retro-fit equivalent hold-downs or contact engineer for alternate; no hds called for at garage front!
BLD-Footing3/19/20023/20/20023/20/2002APART
DetailsTony Young
TRAY ###-####
garage wall and ftg,, mono,, ok 3/20/2002 2:17:09 PM
BLD-Footing3/18/20023/19/20023/19/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/18/2002 at 17:51:42. Contact: ###-####. Nothing to look at no foarms. Told them to call back I had also called the number listed and no one answerd , contractor is on site. 3/19/2002 11:03:20 AM
BLD-Footing3/11/20023/11/20023/11/2002PPASS
DetailsRuss Owen
###-#### TRE
BLD-Grading Inspection3/11/20023/11/20023/11/2002 PASS
DetailsRita DeYoung
Geotechnical engineer has approved the subgrade for the main floor footings
BLD-Footing3/7/20023/8/20023/8/2002PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/07/2002 at 18:39:19. Contact: ###-####.
BLD-Footing3/6/20023/7/20023/7/2002PNR
DetailsTony Young
ft insp tre--###-####
BLD-Foundation2/18/20022/19/20022/19/2002PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/18/2002 at 18:09:32. Contact: ###-####. no time 2/19/2002 4:41:13 PM
BLD-Footing2/13/20022/14/20022/14/2002APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/13/2002 at 13:49:52. Contact: ###-####. basement footings 2/14/2002 12:33:12 PM
BLD-Grading Inspection2/14/20022/14/20022/14/2002 DONE
DetailsRita DeYoung
Geotechnical engineer has approved the footing subgrade.
BLD-Footing2/11/20022/12/20022/12/2002PNR
DetailsTony Young
BLD-Footing1/14/20021/15/20021/15/2002APASS
DetailsSteven Webb
###-#### swimming pool--ok with verbal comments to contractor. 1/15/2002 10:16:28 AM