BLD-Final | 8/6/2002 | 8/8/2002 | 8/8/2002 | A | PASS |
Tony Young
|
|
|
terry; Phone #: ###-####
NOTE: THE DOWNSTAIRS IS NOT FINISHED AND SHOULD BE INSPECTED BEFORE COVER TO ENSURE DRAFT/FIREBLOCKS ARE IN 8/8/2002 11:29:16 AM
|
BLD-Grading Inspection | 8/2/2002 | 8/2/2002 | 8/2/2002 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete. Fine grading and revegetation have not been completed. For this the engineer recommended a $1300.00 bond. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Framing/Rough-in | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | PASS |
Tony Young
|
|
|
re-insp for f/p- terry- ###-####-also shear
|
BLD-Conference | 5/17/2002 | 5/20/2002 | 5/20/2002 | A | CANC |
Tony Young
|
|
|
|
BLD-Energy code compliance | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Tony Young
|
|
|
terry -###-####
|
BLD-Framing/Rough-in | 5/16/2002 | 5/17/2002 | 5/17/2002 | P | PASS |
Tony Young
|
|
|
terry ###-#### fr -re-insp
|
BLD-Framing/Rough-in | 5/14/2002 | 5/15/2002 | 5/15/2002 | P | FAIL |
Jim Sly
|
|
|
###-#### TERRY C/N on site 5/15/2002 4:38:15 PM
|
BLD-Conference | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | PART |
Tony Young
|
|
|
conference on winder stairs 4/23/2002 11:30:15 AM
w/ G.SLANE, stairs as they are do not meet code now, need to at frame inspection 4/23/2002 4:42:19 PM
|
BLD-Framing/Rough-in | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 16:37:11. Contact: ###-####.
ext. shear nailing ok except need fix from sruct. engineer on hd by front door and 4x material on shearwall #4 4/23/2002 3:57:33 PM
|
BLD-Foundation | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Tony Young
|
|
|
###-####
|
BLD-Footing | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | PART |
Tony Young
|
|
|
CLINT ###-#### FT
|
BLD-Footing | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | NR |
Tony Young
|
|
|
###-####
|