Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-03049
StatusFinaled
Name PURSLEY KENNETH L ETAL
Site Address 10533 W OVERLAND RD
Project NameCOUNTRY SQUARE SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(NO TENANT-VANILLA FINISH)(COUNTRY SQUARE SHOPPING CENTER) Remodel for a 10,585 sq. ft. "vanilla finish" space (vacant) for a future tenant in existing building. Another adjacent 3,791 sq. ft. vacant space is also created by the remodel and will be done under a separate permit. Work to include new accessible restrooms, new one-hour rated tenant demising walls, some new interior walls and doors, new 3/4 hour rated minimum overhead door installation in exterior CMU wall, new handrails at rear exterior stairs, new suspended ceiling, fire sprinkler work, fire alarm work, plumbing work, mechanical work, and electrical work. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. A separate permit is required to occupy the space. This is a Scope of Work Permit. LETTER OF COMPLETION TO BE ISSUED WHEN DONE. NOTE: This building is fully fire sprinklered for area increase. (PC#0880-01) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/13/20041/13/20041/13/2004 DONE
DetailsRuss Owen
BLD-Final4/1/20024/1/20024/1/2002PPASS
DetailsRuss Owen
fn insp - ###-####- john walker . ok final oc. 4/1/2002 5:30:48 PM
FIRE-Final Inspection3/28/20023/28/20023/28/2002PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 3/28/2002 3:37:19 PM Fire alarm, fire sprinkler and fire/life safety finaled. Card was not available to sign
BLD-Conference3/13/20023/13/20023/13/2002PPART
DetailsRuss Owen
john -###-#### for conf Needs fire life/safety. 3/13/2002 4:21:40 PM
FIRE-Final Inspection3/13/20023/13/20023/13/2002PPART
DetailsTroy Cobbley
Added by Inspector: 430 On 3/13/2002 2:30:51 PM fire sprinklers finaled. Fire alarm NOT FINALED
FIRE-Final Inspection3/11/20023/12/20023/12/2002AFAIL
DetailsRick Jackson
fire fn john- ###-#### overhead door at loading tested for release with fusible link and operated properly. QR sprinklers 155 temp used in storage room on new line, not per plans 3/12/2002 8:49:48 AM
FIRE-Final Inspection3/7/20023/8/20023/8/2002AFAIL
DetailsTroy Cobbley
Fire life/safety OK but fire alarm and fire sprinkler failed 3/8/2002 9:53:34 AM
BLD-Framing/Rough-in2/21/20022/22/20022/22/2002APART
DetailsRuss Owen
###-#### ok to drop ceiling tile. 2/22/2002 11:31:56 AM
BLD-Conference2/18/20022/19/20022/19/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/18/2002 at 11:52:42. Contact: ###-####.
BLD-Footing2/18/20022/19/20022/19/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/18/2002 at 11:51:55. Contact: ###-####. steps. 2/19/2002 12:15:41 PM
BLD-Conference2/13/20022/13/20022/13/2002PPART
DetailsRuss Owen
###-#### JOHN
BLD-Framing/Rough-in1/29/20021/30/20021/30/2002PPART
DetailsRuss Owen
###-#### john. Restrooms subject to ele insp. 1/31/2002 2:08:28 PM
BLD-Framing/Rough-in1/17/20021/18/20021/18/2002ANR
DetailsRuss Owen
###-####