BLD-Aging Inspection | 12/15/2003 | 12/15/2003 | 12/15/2003 | | PASS |
Jim Storey
|
|
|
6/12/02 12/15/2003 8:07:18 AM
|
BLD-Final | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | PART |
Jim Storey
|
|
|
###-#### pete temp. final ok pending sign off from others/ final affidavit from special inspection ok an in archive. 6/5/2002 5:02:56 PM
|
Permanent Occupancy | | 6/5/2002 | 6/5/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/3/2002 | 6/4/2002 | 6/4/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 08:14:54. Contact: ###-####. will occupant load sign for structural inspector 6/4/2002 3:12:19 PM
|
Code Occupancy Approval | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Framing/Rough-in | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | PASS |
Jim Storey
|
|
|
PETE ###-#### ceilling and rated shaft ok for cover. 5/24/2002 10:01:06 AM
|
BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 | A | PASS |
Jim Storey
|
|
|
PETE ###-#### framing ok for cover engineering fix done and in the archive. 4/29/2002 9:40:17 AM
|
BLD-Framing/Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 10:41:43. Contact: ###-####. c/n header over plm bearing studs/ naill sheer wall at plm panel void. ok to insulate bld. 4/25/2002 3:22:48 PM
|
BLD-Framing/Rough-in | 4/12/2002 | 4/15/2002 | 4/15/2002 | A | PART |
Tom Arcoraci
|
|
|
pete ###-#### roof deck nailing ok 4/15/2002 9:23:45 AM
|
BLD-Foundation | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 07:57:01. Contact: ###-####. pending s.i report rebar ok. 3/14/2002 4:17:07 PM
|
BLD-Footing | 3/11/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 10:48:58. Contact: ###-####. ft ok 3/12/2002 4:12:59 PM
|