BLD-Final | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PASS |
Carl Dependahl
|
|
|
rec'd stamped eng'g... & eifs certificates ok 6/27/2002 2:12:54 PM
|
Permanent Occupancy | | 6/27/2002 | 6/27/2002 | | DONE |
|
|
|
|
BLD-Final | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | FAIL |
Carl Dependahl
|
|
|
Rob..ENG'G APPROVAL LETTER REQ'S STAMP...SHOULD NOTE CONFIGURATION PER DESIGN...NOT JUST WELDS. 6/26/2002 12:33:56 PM
|
BLD-Conference | 6/21/2002 | 6/21/2002 | 6/21/2002 | P | PASS |
Carl Dependahl
|
|
|
8414712 ;keep c/n...need eifs install certs per listing...weep screeds???6/21/2002 3:32:25 PM 6/21/2002 3:33:23 PM
|
BLD-Final | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | NR |
Carl Dependahl
|
|
|
###-#### ROB keep c/n 6/21/2002 3:12:21 PM
|
BLD-Conference | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | FAIL |
Carl Dependahl
|
|
|
keep c/n; spec insp report inadequate...need eng's ok; EIFS doc's incomplete, install chain barrier at bsmt stair at north enclosure. keep c/n. 6/18/2002 10:59:37 AM
|
BLD-Conference | 6/17/2002 | 6/17/2002 | 6/17/2002 | P | CANC |
Carl Dependahl
|
|
|
rob- ###-#### for conf
|
BLD-Conference | 6/17/2002 | 6/17/2002 | 6/17/2002 | A | NR |
Carl Dependahl
|
|
|
|
BLD-Conference | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | NR |
Carl Dependahl
|
|
|
ROB ###-#### PLEASE CALL 15 MIN BEFORE GOING OUT AS ROB IS AT B. S. U . recall ...need all eifs specs/certifications.... 6/12/2002 4:10:53 PM
|
BLD-Final | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | NR |
Carl Dependahl
|
|
|
awaiting eifs report 6/5/2002 10:34:05 AM
|
BLD-Conference | 6/4/2002 | 6/4/2002 | 6/4/2002 | A | PASS |
Carl Dependahl
|
|
|
w/ Guho supt re bsmt barrier...ok to use chain & sign if single gate is obstruction to north exit path per GS. keep c/n, need eng's ok re beams...eifs certification/specs
|
BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 | A | CANC |
Carl Dependahl
|
|
|
###-#### called reschedule 5/29/2002 11:22:10 AM
|
BLD-Final | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | FAIL |
Carl Dependahl
|
|
|
8414712 need efis certs, full eng's' spec insp reports 5/29/2002 4:48:24 PM
|
FIRE-Final Inspection | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Rick Jackson
|
|
|
ROB ###-####
|
BLD-Final | 5/13/2002 | 5/14/2002 | 5/14/2002 | A | FAIL |
Carl Dependahl
|
|
|
###-#### rob rec'd partial spec.insp report, efis listings...keep c/n...complete other items; OK for t/o only. 5/14/2002 11:39:25 AM
|
BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | FAIL |
Carl Dependahl
|
|
|
ROB ###-#### c/n other finals, efis listing & install ( verify support at ext infill wall...weep screeds, ec.) 1hr stair enclosure, bsmt barrier gate; Need eng's/spec. insp reports. recall. 5/13/2002 4:19:21 PM
|
FIRE-Final Inspection | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Rick Jackson
|
|
|
ROB ###-####
|
BLD-Final | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | NR |
Carl Dependahl
|
|
|
###-####...neeed fire, efis listing, etc..no further insp. 5/10/2002 4:24:40 PM
|
FIRE-Alarm Testing | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### need alarm plans 5/10/2002 4:20:40 PM
|
FIRE-Final Inspection | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### elevator recall not working; need alarm plans; door hardware at main exit; door closures on stair enclosures; 5/10/2002 4:20:19 PM
|
FIRE-Final Inspection | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | FAIL |
Rick Jackson
|
|
|
rob ###-#### door hardware at main exit; alarms not ready; sprinkler escutcheons; FACP and sprinkler control signs on doors; 5/9/2002 4:13:59 PM
|
FIRE-Sprinkler Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/3/2002 8:12:34 AM okay to cover
|
BLD-Framing/Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 16:56:58. Contact: ###-####. add spreaders at grid...ok to tile pend elec/hvac 5/1/2002 2:08:23 PM
|
BLD-Framing/Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 07:07:17. Contact: ###-####. ext canopy ok to cover; show efis listings 4/26/2002 2:01:56 PM
|
BLD-Framing/Rough-in | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | FAIL |
Carl Dependahl
|
|
|
###-#### keep c/n, add blocks at canopy., chk stair enclosures...shaft not req'd at riser per rick j. 4/23/2002 12:21:57 PM
|
BLD-Framing/Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | FAIL |
Carl Dependahl
|
|
|
fr insp- ###-####- rob ...c.n canopy , grid clg, firestops, recall 4/22/2002 3:10:42 PM 4/22/2002 3:14:52 PM
|
BLD-Foundation | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Carl Dependahl
|
|
|
found rob ###-#### , upper lift at masonry cols ok 3/15/2002 1:31:56 PM
|
BLD-Foundation | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PART |
Carl Dependahl
|
|
|
found rob ###-####
|
BLD-Foundation | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Carl Dependahl
|
|
|
found rob ###-#### masonry lift ok; wip on stair enclosures 3/13/2002 4:15:31 PM
|
BLD-Foundation | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PART |
Carl Dependahl
|
|
|
found rob- ###-#### , masonry cols, bsmt col ftgs ok 3/12/2002 2:35:06 PM
|
BLD-Conference | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PART |
Jim Storey
|
|
|
###-#### ROB grout ok under steel colums. 3/11/2002 1:56:40 PM
|
BLD-Conference | 3/11/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/11/2002 11:25:55 AM w/ bldr re stair framing...provide 1hr detail
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ROB 1st floor ok for cover 3/4/2002 2:29:27 PM
|
BLD-Footing | 2/27/2002 | 2/28/2002 | 2/28/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 17:18:37. Contact: ###-####...1st lift cols. at entry ok. 2/28/2002 5:30:05 PM
|
BLD-Footing | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PART |
Carl Dependahl
|
|
|
ROB ###-####
|
BLD-Conference | 2/7/2002 | 2/7/2002 | 2/7/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/7/2002 11:45:37 AM w/ Guho supt...widen stairs as req'd in plan notes
|
BLD-Conference | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/6/2002 12:14:57 PM w/ GS & Bob onsite...re stair width, install at 44"
|
BLD-Conference | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####; w/ arch. Billy English & bldr, re-calc occ. load & submit request for use of 36" stairs where > 50 occupants per UBC 1003. 2/4/2002 2:35:29 PM
|