BLD-Final | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | PASS |
Carl Dependahl
|
|
|
duplex prior to conversion; parcel hold removed per malene. 8/5/2002 1:54:09 PM
|
BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | PASS |
Carl Dependahl
|
|
|
w/ Marlene re final, parcel ok 8/5/2002 3:40:41 PM
|
BLD-Final | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | FAIL |
Jim Storey
|
|
|
ROB ###-#### parcial hold no final until resolved. 7/31/2002 3:23:44 PM
|
BLD-Conference | 6/28/2002 | 7/1/2002 | 7/1/2002 | A | CANC |
Tony Young
|
|
|
check stairs on exterior
|
BLD-Conference | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | NR |
Russ Owen
|
|
|
check stairs,( not yet built). 7/1/2002 4:04:43 PM
|
BLD-Framing/Rough-in | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | NR |
Tony Young
|
|
|
rick- ###-#### for stair insp
|
BLD-Energy code compliance | 5/17/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 5/17/2002 7:33:39 AM
|
BLD-Energy code compliance | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | PART |
Dave Hannah
|
|
|
###-#### JUSTN CALL 1ST still working on c/n items 5/16/2002 11:17:47 AM
|
BLD-Framing/Rough-in | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### justin fr ok to cover 5/16/2002 3:55:51 PM
|
BLD-Energy code compliance | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | FAIL |
Carl Dependahl
|
|
|
justin ###-#### -for duplex
|
BLD-Framing/Rough-in | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | FAIL |
Carl Dependahl
|
|
|
2nd c/n...
|
BLD-Framing/Rough-in | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | PART |
Tony Young
|
|
|
JUSTIN ###-#### FR
ok ti insulate, c/n posted, need truss engineering, fire blocks, point load studs, seal r/a, etc. 5/7/2002 11:30:52 AM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | NR |
Carl Dependahl
|
|
|
keep c/n, add fireblocks, backing for gyp at 1hr walls, etc...met bldr onsite...wip 5/3/2002 6:06:02 PM
|
BLD-Framing/Rough-in | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | NR |
Carl Dependahl
|
|
|
###-####....call 1st please, justin.; complete fireblocking, prep 1hr walls, support landings int/ ext...recall. 4/30/2002 11:03:34 AM
|
BLD-Framing/Rough-in | 4/29/2002 | 4/29/2002 | 4/29/2002 | P | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | PART |
Carl Dependahl
|
|
|
shear wall justin ###-#### hd's, sheqarwall nailing ok; ok to side 3/21/2002 3:42:23 PM
|
BLD-Framing/Rough-in | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Carl Dependahl
|
|
|
ready at 1 ###-#### party wall attic trusses rocked on int, ok 3/15/2002 2:03:07 PM
|
BLD-Conference | 3/14/2002 | 3/14/2002 | 3/14/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/14/2002 10:05:37 AM w/ framer re firewall req's; need shearwall hdwe installed; wip. Spoke w/ truss manuf'r re rough handling of trusses (Sta-Rite Truss) at delivery...chk trusses for damege at full frame insp.
|
BLD-Framing/Rough-in | 3/13/2002 | 3/14/2002 | 3/14/2002 | P | PART |
Carl Dependahl
|
|
|
JUSTIN ###-#### 3rd fl int side fire walls, fireblocks in at 10' horiz. intervals 3/14/2002 11:24:13 AM
|
BLD-Framing/Rough-in | 3/5/2002 | 3/6/2002 | 3/6/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 3/5/2002 5:47:01 PM party walls/fireblocks, 1st fl. party walls & rim area ok to stand...5/8 gyp ok as shear ...ok to delete osb at party wall 3/6/2002 1:18:44 PM
|
BLD-Framing/Rough-in | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | NR |
Carl Dependahl
|
|
|
JUSTIN ###-#### ( MASON )
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | NR |
Tom Arcoraci
|
|
|
center wall insp for duplexes justin ###-#### per 340 3/4/2002 1:39:06 PM
|
BLD-Conference | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PASS |
Carl Dependahl
|
|
|
###-#### provide dbl 1hr walls , int layer gyp3/1/2002 4:48:23 PM 3/1/2002 4:49:51 PM
|
BLD-Conference | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####, need details, add'l insps for firewalls...no good as built. 2/28/2002 12:20:11 PM
|
BLD-Foundation | 1/31/2002 | 1/31/2002 | 1/31/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 07:21:19. Contact: ###-####. walls,, discussed bolt placement, ok to wet set 1/31/2002 12:10:55 PM
|
BLD-Footing | 1/25/2002 | 1/25/2002 | 1/25/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/25/2002 at 06:10:09. Contact: ###-####....add bar at int ftgs as shown; clarify hold down bolts at front & rear walls...3 ft depth req'd by plan chk...watch anchor bolt spacing at shear walls 1/25/2002 12:05:10 PM
|