Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-03183
StatusFinaled
Name CHRIS SABALA
Site Address 2910 W ROSE HILL ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1176 sq. ft. two story single family dwelling with a 434 sq. ft. attached two car garage and a 64 sq. ft. 2nd level deck per approved plans and attached requirement lists. (1st floor 860 sq. ft.)(2nd floor 316 sq. ft.). PC #815 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/30/20024/30/20024/30/2002PPASS
DetailsJim Storey
###-#### CHRIS
BLD-Final4/23/20024/24/20024/24/2002ACANC
DetailsJim Storey
###-#### chris call 1st
BLD-Final4/23/20024/23/20024/23/2002PNR
DetailsJim Storey
fn tim ###-#### need mech 4/23/2002 4:30:22 PM
BLD-Energy code compliance3/15/20023/15/20023/15/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/15/2002 at 06:57:40. Contact: ###-####.
BLD-Energy code compliance3/11/20023/12/20023/12/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/11/2002 at 18:05:57. Contact: ###-####. Posted a c/n for a abs plumbing vent in the exterior wall of the 2nd floor bathroom, it has been caped and never got reconnected. 3/12/2002 10:28:59 AM
BLD-Framing/Rough-in3/7/20023/8/20023/8/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/07/2002 at 18:51:31. Contact: ###-#### 3/8/2002 10:07:42 AM
BLD-Framing/Rough-in3/5/20023/5/20023/5/2002PFAIL
DetailsDave Hannah
chris- ###-#### fr c/n on site do not insulate until seal package has been inspected 3/5/2002 2:13:31 PM
BLD-Framing/Rough-in2/13/20022/14/20022/14/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/13/2002 at 17:59:21. Contact: ###-####. exterior nailling ok for cover. 2/14/2002 9:31:15 AM
BLD-Framing/Rough-in2/11/20022/12/20022/12/2002AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/11/2002 at 20:09:48. Contact: ###-####.shear panel inspection c/n on site 2/12/2002 10:43:32 AM
BLD-Foundation1/17/20021/18/20021/18/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/17/2002 at 13:38:06. Contact: ###-####.
BLD-Footing1/15/20021/16/20021/16/2002PPART
DetailsJim Storey
DALE ###-#### pwoi 1/16/2002 3:10:58 PM
BLD-Footing1/15/20021/16/20021/16/2002PPART
DetailsJim Storey
DALE ###-#### pwoi 1/16/2002 3:10:58 PM
BLD-Footing1/15/20021/16/20021/16/2002ANR
DetailsJim Storey
DALE ###-####
BLD-Footing1/15/20021/16/20021/16/2002ANR
DetailsJim Storey
DALE ###-####