BLD-Final | 7/12/2002 | 7/15/2002 | 7/15/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 10:54:14. Contact: ###-####.
|
BLD-Final | 7/10/2002 | 7/11/2002 | 7/11/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 12:26:32. Contact: ###-####.c/n posted on window. 7/11/2002 10:37:52 AM
|
BLD-Energy code compliance | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PASS |
Jim Sly
|
|
|
todd- ###-#### energy code
|
BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 | P | PASS |
Jim Sly
|
|
|
###-#### TODD
|
BLD-Framing/Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Dave Hannah
|
|
|
###-#### second floor calls for shear panels on the se and sw corners these are int walls need to install or get engineer alt 4/22/2002 1:44:27 PM
|
BLD-Foundation | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 13:14:47. Contact: .
|
BLD-Footing | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PART |
Jim Sly
|
|
|
ft insp - bob ###-####
|