BLD-Final | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | FAIL |
Tony Young
|
|
|
###-#### JOE
need Terry R ecords sign off, duct reattached, under floor, gaurd rail per code 6/28/2002 11:25:52 AM
|
BLD-Final | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | PASS |
Tony Young
|
|
|
941--3904 joe
|
BLD-Grading Inspection | 6/28/2002 | 6/28/2002 | 6/28/2002 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete. Fine grading and revegetation are not. Upon receipt of a $500.00 bond the grading and drainage are conditionally approved.
|
FIRE-Final Inspection | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety and fire sprinkler finaled 6/28/2002 10:19:15 AM
|
BLD-Framing/Rough-in | 3/26/2002 | 3/27/2002 | 3/27/2002 | A | PASS |
Dave Hannah
|
|
|
###-#### all c/n items completed insulation ok ok to cover 3/27/2002 11:19:23 AM
|
BLD-Framing/Rough-in | 3/25/2002 | 3/26/2002 | 3/26/2002 | A | FAIL |
Carl Dependahl
|
|
|
###-#### JOE connect dryer vent, obtain fire sprinlker 3/26/2002 10:55:12 AM
|
FIRE-Final Inspection | 3/25/2002 | 3/26/2002 | 3/26/2002 | A | PART |
Troy Cobbley
|
|
|
Inspection was for sprinkler pipe tenting. Sprinkler pipe now OK for cover. I spoke with the insulating contractor (Gale Insulation) and he said that more blow-in insulation had been installed over the piping in the rooms upstairs and that he would add a small piece near at a gap in the upstairs area 3/27/2002 9:33:01 AM
|
BLD-Framing/Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 | P | NR |
Tony Young
|
|
|
fre -re-insp joe ###-####
|
FIRE-Final Inspection | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | FAIL |
Troy Cobbley
|
|
|
sprinkler piping still is not tented correctly. I left do not cover stickers 3/25/2002 8:00:06 AM
|
BLD-Conference | 3/22/2002 | 3/22/2002 | 3/22/2002 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 3/22/2002 11:37:30 AM call Troy chk for sprinkler approval or $42 fee due... 3/22/2002 2:22:22 PM
|
BLD-Energy code compliance | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | FAIL |
Carl Dependahl
|
|
|
###-#### JOE
|
BLD-Framing/Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | CANC |
Tony Young
|
|
|
fr insp-- joe- ###-####--cancel per joe
|
BLD-Framing/Rough-in | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | FAIL |
Carl Dependahl
|
|
|
###-#### JOE 2nd c/n posted at sit...Dryer vent tooc lose to window, fireblocks, blocking at floor, insul face paper, etc...post c/n & permit, address onsite; fire r/i to be complete or $42 fee due. 3/22/2002 10:05:56 AM
|
FIRE-Hydro test above ground | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | PASS |
Troy Cobbley
|
|
|
Underground flush OK 3/22/2002 2:26:09 PM
|
FIRE-Sprinkler Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | FAIL |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/22/2002 2:20:58 PM tenting is incorrect. Spoke with Joe on areas that needed attention. I went back for a reinspection in the afternoon and not all of the issues were taken care of. The sprinkler pipe in the bonus room now has no insulation and the pipe in the main entrance way is concealed by insulation, it must be exposed
|
BLD-Framing/Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | FAIL |
Jim Sly
|
|
|
fr insp- joe ###-#### C/N on site. 3/18/2002 4:03:52 PM
|
BLD-Framing/Rough-in | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | FAIL |
Dave Hannah
|
|
|
SHEER WALL ###-#### JOE straping ok but crew needs to go around and nail panels per engineering 2/20/2002 1:21:54 PM
|
BLD-Footing | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PART |
Tony Young
|
|
|
foundation ok, wip 1/17/2002 3:22:05 PM
|
BLD-Footing | 1/15/2002 | 1/16/2002 | 1/16/2002 | P | PART |
Russ Owen
|
|
|
JOE ###-#### rebar not yet supported, contractor read letter via phone and engineer has approved soil. 1/16/2002 3:42:11 PM
|
BLD-Footing | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | NR |
Tom Arcoraci
|
|
|
JOE ###-####
|
BLD-Footing | 1/16/2002 | 1/16/2002 | 1/16/2002 | P | CANC |
Tony Young
|
|
|
Scheduled by Inspector: 408 On 1/16/2002 9:42:15 AM joe ###-####
|
BLD-Grading Inspection | 1/16/2002 | 1/16/2002 | 1/16/2002 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved footing subgreade.
|