Code Occupancy Approval | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
Permanent Occupancy | | 8/15/2002 | 8/15/2002 | | DONE |
|
|
|
|
BLD-Final | 7/25/2002 | 7/25/2002 | 7/25/2002 | P | PASS |
Steven Webb
|
|
|
BRIAN ###-####
|
BLD-Final | 7/1/2002 | 7/2/2002 | 7/2/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 16:01:35. Contact: ###-####.ok for temp occ needs other trades to sign off perm and install floor molding in bath rooms and fix thresholds at doors over 1/2 inch 7/2/2002 12:38:58 PM
|
BLD-Final | 7/1/2002 | 7/2/2002 | 7/2/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 16:01:35. Contact: ###-####.
|
FIRE-Final Inspection | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 16:00:52. Contact: ###-####.
|
FIRE-Final Inspection | 6/27/2002 | 6/28/2002 | 6/28/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 11:01:37. Contact: ###-####. door hardware at two exits; need passage set for hallway door; gas labeling; resubmittal wasn't on site for curb change at entrance 6/28/2002 3:29:02 PM
|
BLD-Other | 6/25/2002 | 6/26/2002 | 6/26/2002 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 13:49:08. Contact: ###-####.
|
BLD-Other | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 6/26/2002 1:12:31 PM Remaining grid ceiling on south side--ses. pod in place. 6/26/2002 4:45:08 PM
|
BLD-Other | 6/24/2002 | 6/25/2002 | 6/25/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 11:00:55. Contact: ###-####. large treatment room at south side needs seismic pods, over 144 square foot contractor notified will call back before tile ,All other areas ok . 6/25/2002 10:49:42 AM
|
FIRE-Conference | 5/13/2002 | 5/13/2002 | 5/13/2002 | A | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 5/13/2002 10:22:18 AM left resubmittal with GC concerning curb cut at entrance off Quamash Way; FD access required here 5/13/2002 10:24:18 AM
|
BLD-Framing/Rough-in | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/06/2002 at 13:47:17. Contact: ###-####. Mechanical r.i to be performed after hard lid is installed--ok to cover. 5/7/2002 8:56:02 AM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 11:25:19. Contact: ###-####. lat supports in trusses and plumbing r/i ok to insulate after plumbing r/i 5/3/2002 1:56:01 PM
|
BLD-Energy code compliance | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 12:53:47. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 14:54:53. Contact: ###-####. SHEAR--c/n posted--excessive nail penetration on north and northeast sides of building--hd on south mislocated-provide eng or retrofit by framing. 4/30/2002 8:36:54 AM
|
BLD-Framing/Rough-in | 4/30/2002 | 4/30/2002 | 4/30/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 10:18:52. Contact: ###-####. Shear--ok to cover exterior. 4/30/2002 4:13:13 PM
|
BLD-Foundation | 3/20/2002 | 3/21/2002 | 3/21/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 14:10:47. Contact: ###-####.
|
BLD-Footing | 3/15/2002 | 3/18/2002 | 3/18/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 12:21:29. Contact: ###-####.
|