Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-03269
StatusFinaled
Name DESTINY HOMES
Site Address 2074 W FALCON POINT CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two and three quarter bathroom 3412 sq. ft. two story single family dwelling (2396 sq. ft. first floor/1016 sq. ft. second floor) with a attached 827 sq. ft. three car garage and a 149 sq. ft. covered back porch. Per approved plans, engineering and requirement list. This lot is within a hillside area and is subject to the hillside ordinances. CLASS "A" roof system and defensible area will be maintained. PC#852 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/7/20026/10/20026/10/2002APASS
DetailsTony Young
fn -bobbi- ###-####
BLD-Final6/6/20027/7/20026/7/2002PCANC
DetailsTony Young
bobbi ###-####--cancel wrong date???
BLD-Grading Inspection6/7/20026/7/20026/7/2002 PASS
DetailsRita DeYoung
Final grading and drainage approved.
BLD-Framing/Rough-in3/28/20023/28/20023/28/2002PPASS
DetailsTony Young
KIM ###-####
BLD-Framing/Rough-in3/25/20023/27/20023/27/2002APART
DetailsTony Young
###-####
went through truss specs, added c/n, ok to insulate. 3/27/2002 11:14:05 AM
BLD-Framing/Rough-in3/25/20023/26/20023/26/2002PPART
DetailsTony Young
###-#### BOBBI
c/n posted,, ok to insulate 3/26/2002 2:23:30 PM
BLD-Framing/Rough-in3/12/20023/13/20023/13/2002PPART
DetailsTom Arcoraci
SHEER ###-#### RICK ok for ext cover 3/13/2002 1:49:46 PM
BLD-Framing/Rough-in3/11/20023/12/20023/12/2002PNR
DetailsRuss Owen
shear---kim ###-#### Will recall .talked with contractor. 3/12/2002 3:26:59 PM
BLD-Framing/Rough-in3/8/20023/11/20023/11/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/08/2002 at 13:24:55. Contact: . C/n posted. to many items to list. 3/11/2002 12:54:18 PM
BLD-Foundation1/23/20021/24/20021/24/2002PPART
DetailsTony Young
###-#### MIKE
BLD-Footing1/23/20021/23/20021/23/2002PPART
DetailsTony Young
###-####
recvd letter from soil engineer oking sub grade and compaction 1/23/2002 3:37:08 PM