Permit Information
Permit NumberBLD01-03285
StatusFinaled
Name TAHOE CONSTRUCTION
Site Address 3912 S MILL SITE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two and half bathroom 1780 sq. ft. two story, single family dwelling (905 sq. ft. first floor/875 sq. ft. second floor) with a attached 542 sq. ft. two car garage and 130 sq. ft. of covered porch. Per approved plans, engineering and requirement list. CUP98-0116 per Roger Jones with Planning and Zoning. PC#851 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/6/20025/6/20025/6/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/06/2002 at 11:28:03. Contact: ###-####.c.c # 23089 issued 5/6/2002 2:22:32 PM
BLD-Energy code compliance3/7/20023/8/20023/8/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/07/2002 at 08:29:22. Contact: ###-####. Insulation not completed. 3/8/2002 9:12:21 AM
BLD-Energy code compliance3/8/20023/8/20023/8/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/08/2002 at 09:30:09. Contact: ###-####.
BLD-Framing/Rough-in3/5/20023/6/20023/6/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/05/2002 at 16:02:50. Contact: ###-####. c/notice items done 3/6/2002 11:10:26 AM
BLD-Framing/Rough-in3/5/20023/5/20023/5/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/05/2002 at 10:19:56. Contact: ###-####. c/n posted--ok to insulate. 3/5/2002 2:30:43 PM
BLD-Other2/20/20022/22/20022/22/2002APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/20/2002 at 14:29:39. Contact: ###-####. Shear OK. 2/22/2002 10:00:59 AM
BLD-Foundation2/1/20022/1/20022/1/2002PPART
DetailsSteven Webb
###-#### CLINT 95% ready--hd not installed at time of inspection. 2/1/2002 2:32:03 PM
BLD-Footing1/30/20021/30/20021/30/2002PPART
DetailsSteven Webb
CLINT ###-#### wip--informed contractor that due to cold temps. blankets needed at least 72 hours. 1/30/2002 2:36:35 PM