DOC - Permit Finaled | | | 2/25/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | | DONE |
Russ Owen
|
|
|
|
BLD-Final | 9/19/2002 | 9/20/2002 | 9/20/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### Finish firecaulk and hinges. 9/20/2002 8:46:45 AM
|
BLD-Final | 9/20/2002 | 9/20/2002 | 9/20/2002 | P | PASS |
Jim Sly
|
|
|
###-#### OK for Perm Occ. 9/20/2002 1:53:38 PM
|
BLD-Final | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 21:12:05. Contact: ###-####.ok temp oc , c/n posted on site 9/12/2002 1:06:47 PM
|
BLD-Final | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | FAIL |
Russ Owen
|
|
|
###-####c/n posted. 9/11/2002 11:49:26 AM
|
BLD-Framing/Rough-in | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | CANC |
Russ Owen
|
|
|
###-####. Wrong insp, called in. 9/11/2002 11:49:09 AM
|
BLD-Final | 9/5/2002 | 9/6/2002 | 9/6/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 18:15:09. Contact: ###-####.c/n posted. 9/6/2002 2:57:52 PM
|
FIRE-Final Inspection | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 9/6/2002 1:14:18 PM
|
Code Occupancy Approval | 9/5/2002 | 9/5/2002 | 9/5/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Approved 9/5/2002 12:31:45 PM
|
FIRE-Final Inspection | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | FAIL |
Troy Cobbley
|
|
|
no approved plans on site so I did not start inspection. I noticed that exit door hardware is incorrect on both doors and atleast one of the exit signs did not work 9/5/2002 2:35:04 PM 9/5/2002 2:38:12 PM
|
BLD-Framing/Rough-in | 8/13/2002 | 8/14/2002 | 8/14/2002 | A | PART |
Dave Hannah
|
|
|
###-#### SCOTT ceiling grid ok to drop in panels 8/14/2002 10:12:56 AM
|
BLD-Framing/Rough-in | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | PASS |
Russ Owen
|
|
|
re-insp russ- ###-####
|
BLD-Framing/Rough-in | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | FAIL |
Russ Owen
|
|
|
###-####posted a c/n. 7/12/2002 5:03:59 PM
|
BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | NR |
Russ Owen
|
|
|
###-####needs electrical and plumbing. 7/8/2002 5:22:44 PM
|
BLD-Framing/Rough-in | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | PART |
Russ Owen
|
|
|
###-#### erin
|
BLD-Framing/Rough-in | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | PART |
Russ Owen
|
|
|
###-####. ok to side, needs eaves at left and right sides sheetrocked as per plan. 6/21/2002 4:03:45 PM
|
BLD-Framing/Rough-in | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### scott,staple lower walls and nail blocking thru deck no c/n posted. 6/13/2002 4:40:36 PM
|
BLD-Foundation | 4/4/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 17:06:30. Contact: .
|
BLD-Footing | 3/29/2002 | 4/1/2002 | 4/1/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 10:24:05. Contact: ###-####.
|