Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00019
StatusFinaled
Name CALLIES BUILDING #2
Site Address 1556 S TIMESQUARE LN
Project NameCALLIES BLDG #2
Customer Number 
ePlanReviewNo
Description
Boise Timesquare * (CALLIES BUILDING #2 SHELL AND CORE) - (Plan Modification * Relocate the interior nonload bearing walls for the future tenant spaces, change stairway run and move restrooms per approved plans dated 9/3/02). To construct a new 2,822 sq. ft. wood framed, multi-tenant, office building with a 500 sq.ft. basement mechanical room. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. This permit includes on site improvements and landscaping. The basement will not to be used for storage or any other purpose other than mechanical equipment. NOTE: There will not be a certificate of occupancy issued with this permit. A Separate MIS permits will be required for each tenant space. MJP DRH00-00242 PC#010-02
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  2/25/2004 DONE
BLD-Final12/4/200212/5/200212/5/2002APART
DetailsRuss Owen
###-####. Ok temp oc pending zoning for a perm oc. 12/5/2002 3:51:31 PM
BLD-Final11/26/200211/27/200211/27/2002PNR
DetailsRuss Owen
###-####. Needs public works approval prior to a final inspection./27/2002 4:06:30 PM 11/27/2002 4:12:14 PM 11/27/2002 4:12:24 PM
FIRE-Final Inspection11/26/200211/27/200211/27/2002APASS
DetailsTroy Cobbley
life safety finaled. The contractor still needs to install the permanent lock set on the main exit/entry structural inspector to please verify 11/27/2002 11:13:54 AM
Code Occupancy Approval11/26/200211/26/200211/26/2002PPASS
DetailsScott M.Brown
landscape in as required, ok for occupancy 11/26/2002 3:07:56 PM
BLD-Framing/Rough-in11/22/200211/25/200211/25/2002PPASS
DetailsSteven Webb
###-#### ceiling inspection Sus. ceiling 11/25/2002 5:04:17 PM
BLD-Framing/Rough-in9/9/20029/10/20029/10/2002APASS
DetailsRuss Owen
###-#### scott
BLD-Framing/Rough-in8/7/20028/7/20028/7/2002PPART
DetailsRuss Owen
###-####ok pending floor plan modification. 8/7/2002 1:04:21 PM
BLD-Framing/Rough-in8/2/20028/6/20028/6/2002AFAIL
DetailsRuss Owen
###-#### complete prior c/n. 8/6/2002 3:12:30 PM
BLD-Framing/Rough-in7/31/20027/31/20027/31/2002PPART
DetailsRuss Owen
nail truss repair 7/31/2002 3:16:22 PMper detail, fire caulk at stairs,a red hed a-b.s 7/31/2002 3:17:14 PM
BLD-Framing/Rough-in7/29/20027/30/20027/30/2002AFAIL
DetailsRuss Owen
###-#### SCOTTc/n 7/30/2002 10:42:13 AM
BLD-Framing/Rough-in7/22/20027/23/20027/23/2002APART
DetailsRuss Owen
shear ok. 7/23/2002 11:09:03 AM
BLD-Framing/Rough-in7/19/20027/22/20027/22/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/19/2002 at 11:26:50. Contact: .
BLD-Framing/Rough-in7/22/20027/22/20027/22/2002PNR
DetailsRuss Owen
BLD-Framing/Rough-in5/30/20025/31/20025/31/2002ANR
DetailsRuss Owen
SCOTT- ###-#### FR . needs all other finals, called 5/31/2002 12:06:32 PM lefty message. 5/31/2002 12:06:40 PM
BLD-Foundation4/17/20024/18/20024/18/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/17/2002 at 16:02:46. Contact: ###-####.
BLD-Footing3/29/20024/1/20024/1/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/29/2002 at 10:25:25. Contact: ###-####.