DOC - Permit Finaled | | | 2/25/2004 | | DONE |
|
|
|
|
BLD-Final | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PART |
Russ Owen
|
|
|
###-####. Ok temp oc pending zoning for a perm oc. 12/5/2002 3:51:31 PM
|
BLD-Final | 11/26/2002 | 11/27/2002 | 11/27/2002 | P | NR |
Russ Owen
|
|
|
###-####. Needs public works approval prior to a final inspection./27/2002 4:06:30 PM 11/27/2002 4:12:14 PM 11/27/2002 4:12:24 PM
|
FIRE-Final Inspection | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled. The contractor still needs to install the permanent lock set on the main exit/entry structural inspector to please verify 11/27/2002 11:13:54 AM
|
Code Occupancy Approval | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | PASS |
Scott M.Brown
|
|
|
landscape in as required, ok for occupancy 11/26/2002 3:07:56 PM
|
BLD-Framing/Rough-in | 11/22/2002 | 11/25/2002 | 11/25/2002 | P | PASS |
Steven Webb
|
|
|
###-#### ceiling inspection Sus. ceiling 11/25/2002 5:04:17 PM
|
BLD-Framing/Rough-in | 9/9/2002 | 9/10/2002 | 9/10/2002 | A | PASS |
Russ Owen
|
|
|
###-#### scott
|
BLD-Framing/Rough-in | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | PART |
Russ Owen
|
|
|
###-####ok pending floor plan modification. 8/7/2002 1:04:21 PM
|
BLD-Framing/Rough-in | 8/2/2002 | 8/6/2002 | 8/6/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### complete prior c/n. 8/6/2002 3:12:30 PM
|
BLD-Framing/Rough-in | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PART |
Russ Owen
|
|
|
nail truss repair 7/31/2002 3:16:22 PMper detail, fire caulk at stairs,a red hed a-b.s 7/31/2002 3:17:14 PM
|
BLD-Framing/Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### SCOTTc/n 7/30/2002 10:42:13 AM
|
BLD-Framing/Rough-in | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | PART |
Russ Owen
|
|
|
shear ok. 7/23/2002 11:09:03 AM
|
BLD-Framing/Rough-in | 7/19/2002 | 7/22/2002 | 7/22/2002 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/19/2002 at 11:26:50. Contact: .
|
BLD-Framing/Rough-in | 7/22/2002 | 7/22/2002 | 7/22/2002 | P | NR |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | NR |
Russ Owen
|
|
|
SCOTT- ###-#### FR . needs all other finals, called 5/31/2002 12:06:32 PM lefty message. 5/31/2002 12:06:40 PM
|
BLD-Foundation | 4/17/2002 | 4/18/2002 | 4/18/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 16:02:46. Contact: ###-####.
|
BLD-Footing | 3/29/2002 | 4/1/2002 | 4/1/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 10:25:25. Contact: ###-####.
|