BLD-Aging Inspection | 9/16/2010 | 9/16/2010 | 9/16/2010 | | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 9/16/2010 | 9/16/2010 | 9/16/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 7/21/2009 | 7/21/2009 | 7/21/2009 | | FAIL |
Tom Arcoraci
|
|
|
still needs other finals
|
BLD-Final | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | PEND |
Jim Sly
|
|
|
Called and asked again to obtain all finals.....then call for structural final
|
BLD-Aging Inspection | 1/17/2008 | 1/17/2008 | 1/17/2008 | | PEND |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 3/6/2007 | 3/6/2007 | 3/6/2007 | | PEND |
Jim Sly
|
|
|
Called respective parties....no return call.
|
BLD-Aging Inspection | 11/28/2006 | 11/28/2006 | 11/30/2006 | | DEFR |
Jim Sly
|
|
|
Pending C/N........Need all req signatures prior to calling for struct final.
|
BLD-Aging Inspection | 8/7/2006 | 8/7/2006 | 8/7/2006 | | DEFR |
Jim Sly
|
|
|
Let them know that we need all Req signatures prior to calling for Bldg final.
|
BLD-Aging Inspection | 4/17/2006 | 4/17/2006 | 4/17/2006 | | DEFR |
Jim Sly
|
|
|
Need all req signatures deferred to trades
|
BLD-Final | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/11/2002 at 10:59:17. Contact: ###-####. Need all req. signatures ...... 12/12/2002 11:30:34 AM
|
BLD-Final | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 14:11:03. Contact: ###-####.door opening in cmu wall ok 8/28/2002 10:31:52 AM
|
BLD-Final | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/30/2002 | 7/30/2002 | 7/30/2002 | A | PASS |
Dave Hannah
|
|
|
insulation also in ok to cover
|
BLD-Framing/Rough-in | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 16:32:36. Contact: ###-####. needs elec r/i 7/16/2002 10:10:11 AM needs elec r/i 7/16/2002 10:52:26 AM
|