BLD-Final | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | PASS |
Tom Arcoraci
|
|
|
ACCESS CODE 3515 ENTER ###-#### GARY
|
BLD-Energy code compliance | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 11:23:30. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 08:44:32. Contact: ###-####. c/n on site ok to insulate 3/4/2002 3:27:08 PM
|
BLD-Framing/Rough-in | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Jim Sly
|
|
|
###-#### OK to cover all of Ext. (siding). 2/22/2002 4:24:50 PM
|
BLD-Framing/Rough-in | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | PART |
Steven Webb
|
|
|
TIM ###-#### SHEAR NOT FRAMING--- c/n posted--ok to cover except front left of house(B.Room#3 face). This area needs nails or 13 guage staples per plans, also--rear wall of garage per plans need double layer of 5/8" gyp. board, need inspection prior to mud and tape. 2/14/2002 2:32:16 PM 2/14/2002 2:32:43 PM
|
BLD-Foundation | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | PART |
Steven Webb
|
|
|
###-#### stem wall 95 % ready--except hd not installed at time of inspection. 1/23/2002 2:15:28 PM
|
BLD-Footing | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PART |
Steven Webb
|
|
|
###-####wip--Appr. 75% ready at time of inspection. 1/22/2002 2:10:14 PM
|