Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-00090
StatusFinaled
Name CIVIC PLAZA PA-3 APARTMENTS
Site Address 190 E FRONT ST
Project NameCIVIC PLAZA-PA3 APARTMENTS
Customer Number 
ePlanReviewNo
Description
(CIVIC PLAZA PA3-APARTMENTS) MODIFIED 10/8/03 TO REFLECT THREE ADDITIONAL UNITS, ONE ON EACH FLOOR, FLOORS TWO THRU FOUR. To construct a 152 unit, 4-levels of R-1 apartments on an existing three story, Type S-3 parking garage with a grade level leasing office and community center laundry room and storage facility for the apartment complex. Work to include landscaping spine and temporary (grade) parking lot. All construction per the approved plans and attached comment list. DRH01-186 CUP01-00120 Plan Check # 29-02 03/10/03 * PLAN MODIFICATION * Change exterior curtain walls to standard walls, with openable windows and grills over A/C units, remodel first floor leasing office space, move fire pump room and emergency generator room, install PTAC units in each habital room. MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 1/16/20041/16/2004 DONE
Details
FIRE-Final Inspection12/31/200312/31/200312/31/2003PPASS
DetailsRick Jackson
BLD-Final11/13/200311/14/200311/14/2003ADONE
DetailsDave Hannah
fn john-- ###-####
FIRE-Final Inspection11/3/200311/3/200311/3/2003PPART
DetailsRick Jackson
###-#### verified doors to elevator lobby and they all release on fire alarm and have positive latching 11/3/2003 3:18:38 PM
FIRE-Final Inspection10/9/200310/9/200310/9/2003PPART
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs tested elevator lobby doors for release with fire alarm and that is okay but doors don't remain latched as strike is released on fire; fire doors to remain latched but release lock 10/9/2003 4:36:41 PM
FIRE-Final Inspection10/1/200310/2/200310/2/2003APART
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per Dave Miller fire/life safety will be on temp occupancy until the access control system is tested and disables with fire alarm activation and approval of the pressure reducing valve is submitted and approved by plan review 10/2/2003 9:14:25 AM
BLD-Final9/30/200310/1/200310/1/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/30/2003 at 6:24:44 PM. Contact: ###-####. ok for temp occ 10/1/2003 7:34:26 PM
BLD-Final9/30/200310/1/200310/1/2003ACANC
DetailsDave Hannah
FIRE-Final Inspection9/30/200310/1/200310/1/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/30/2003 at 6:23:04 PM. Contact: ###-####. doors not latching; need smoke seals on electrical room doors; left list with John with other items 10/1/2003 4:44:04 PM
BLD-Final9/26/20039/29/20039/29/2003PPART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore walk project with john made a punch list 9/30/2003 11:25:03 AM
FIRE-Final Inspection9/26/20039/29/20039/29/2003AFAIL
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need to verify phase reversal for fire pump; wasn't a final but tested all sprinkler tampers and flows for exsisting and new systems; see previous final for correction list 9/29/2003 10:25:20 AM
FIRE-Final Inspection9/25/20039/26/20039/26/2003AFAIL
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs 9/26/2003 12:11:47 PM smoke seal on all rated doors; need floor drain, emergency lights and heat in fire pump room; stair signage; sprinkler heads fire proofed in stairs and elevator machine room; fire extinguishers require current inspection tag; see alarm permit for other items 9/26/2003 12:14:47 PM
FIRE-Final Inspection9/24/20039/25/20039/25/2003AFAIL
DetailsRick Jackson
john ; Phone #: ###-#### Internet Inspection Request from: Annette Moore started testing the alarms; see FIR03-00104 for info 9/25/2003 12:23:43 PM
BLD-Wall cover9/22/20039/23/20039/23/2003APART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Wall cover9/19/20039/19/20039/19/2003PCANC
DetailsDave Hannah
JOHN; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Wall cover9/17/20039/18/20039/18/2003APASS
DetailsDave Hannah
allen; Phone #: ###-#### Internet Inspection Request from: Annette Moore 4th floor elev shaft #1 ok to hang lid 9/18/2003 10:22:18 AM
BLD-Conference9/17/20039/17/20039/17/2003PDONE
DetailsDave Hannah
list of items that need tobe completed for final 9/17/2003 4:32:28 PM
BLD-Wall cover9/15/20039/15/20039/15/2003PNR
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
FIRE-Supply Line Cover9/15/20039/15/20039/15/2003PFAIL
DetailsRick Jackson
JOHN CEILING COVER FIRE; Phone #: ###-#### Internet Inspection Request from: Marc Lileks not a supply line cover; penetrations in corridors still need work on all floors 9/15/2003 2:02:03 PM
BLD-Wall cover9/12/20039/12/20039/12/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Conference9/11/20039/11/20039/11/2003ADONE
DetailsDave Hannah
meeting on final occ and what needs tobe completed 9/11/2003 1:56:15 PM
BLD-Framing/Rough-in9/11/20039/11/20039/11/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/9/20039/9/20039/9/2003PPART
DetailsDave Hannah
john// ceiling cover; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 9/9/2003 4:34:42 PM
FIRE-Sprinkler Rough-in9/9/20039/9/20039/9/2003PFAIL
DetailsRick Jackson
john// ceiling cover; Phone #: ###-#### Internet Inspection Request from: Barbara Moore corridors not approved for cover - many penetrations require firestopping 9/9/2003 2:54:29 PM
BLD-Conference9/5/20039/5/20039/5/2003PDONE
DetailsDave Hannah
BLD-Wall cover8/28/20038/28/20038/28/2003PPART
DetailsDave Hannah
john shed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore stair shafts ok fo second layer on one inside first on out stair 2 second on insde 8/29/2003 8:55:37 AM
BLD-Wall cover8/20/20038/21/20038/21/2003APART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Conference8/19/20038/20/20038/20/2003ADONE
DetailsDave Hannah
8:30am meeting with john and rick
FIRE-Conference8/19/20038/20/20038/20/2003APART
DetailsRick Jackson
met with Dave Hannah, John Shed, JP and subs about final requirements for occupancy. John Shed will provide checklist for final sign off 8/20/2003 10:43:50 AM
BLD-Wall cover8/14/20038/15/20038/15/2003APART
DetailsDave Hannah
BLD-Framing/Rough-in8/13/20038/13/20038/13/2003PPART
DetailsDave Hannah
BLD-Wall cover8/13/20038/13/20038/13/2003PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
BLD-Wall cover8/11/20038/11/20038/11/2003PFAIL
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 2hr expansion joint between floors 8/11/2003 3:36:31 PM
BLD-Conference8/8/20038/8/20038/8/2003PPASS
DetailsCarl Dependahl
still need joint detail as req'd 8/8/2003 2:58:18 PM
BLD-Framing/Rough-in8/7/20038/8/20038/8/2003ANR
DetailsCarl Dependahl
alan, expansion joint info...mfr's spec doesn't show 5" gap for 2hr system....resubmit 8/8/2003 11:52:13 AM
BLD-Other8/6/20038/7/20038/7/2003ANR
DetailsCarl Dependahl
expansion joint
BLD-Framing/Rough-in8/5/20038/6/20038/7/2003AFAIL
DetailsCarl Dependahl
alan for cover; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need listing & install info, product for 2hr expansion joint not as plans show...submit. This is main exp joint thru entire bldg... 8/7/2003 11:56:04 AM
BLD-Framing/Rough-in8/6/20038/6/20038/6/2003PNR
DetailsCarl Dependahl
BLD-Framing/Rough-in8/1/20038/1/20038/1/2003PNR
DetailsDave Hannah
BLD-Wall cover8/1/20038/1/20038/1/2003PNR
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in7/30/20037/30/20037/30/2003PPART
DetailsDave Hannah
allen; Phone #: ###-#### Internet Inspection Request from: Annette Moore 4th floor west side shafts all ok but for one in unit nw corner stair towers ok to put first layer on outsid second layer on inside ok 7/31/2003 10:06:29 AM
BLD-Framing/Rough-in7/18/20037/21/20037/21/2003APART
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Wall cover7/21/20037/21/20037/21/2003PPART
DetailsDave Hannah
4th floor west half ok to cover all but shafts 7/21/2003 2:13:28 PM
BLD-Wall cover7/15/20037/16/20037/16/2003APART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore se stair tower ok to cover with second layer of sheet rock 7/16/2003 10:46:06 AM
BLD-Wall cover7/14/20037/15/20037/15/2003APART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4th floor west half c/n with allin and se stair shaft first layer of rock 7/15/2003 10:58:28 AM
BLD-Framing/Rough-in7/10/20037/11/20037/11/2003APART
DetailsCarl Dependahl
alan ceiling cover ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; ok to tile fl. 1 corridor pending other insps. 7/11/2003 2:26:18 PM
BLD-Final7/10/20037/10/20037/10/2003PNR
DetailsCarl Dependahl
ALLAN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in7/10/20037/10/20037/10/2003PPART
DetailsCarl Dependahl
ok to tile clg at east portion 1st fl corridor, to model apts....pending elec, etc.
FIRE-Final Inspection7/8/20037/9/20037/9/2003APART
DetailsRick Jackson
first floor office/laundry/etc area okay to occupy 7/10/2003 12:57:41 PM
BLD-Wall cover7/8/20037/8/20037/8/2003PDONE
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection7/8/20037/8/20037/8/2003PFAIL
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need closures on doors to corridor; door to lobby locks and is required exit 7/8/2003 4:26:18 PM
BLD-Wall cover7/7/20037/7/20037/7/2003PCANC
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection7/7/20037/7/20037/7/2003PCANC
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore received call from Allen and he said they won't be ready until 7/8 and he would reschedule 7/7/2003 3:45:13 PM
BLD-Wall cover7/2/20037/3/20037/3/2003PPART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore third floor west half first floor elev loby se corner 7/7/2003 9:39:47 AM
BLD-Wall cover7/1/20037/2/20037/2/2003PFAIL
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore fire proofing not ready 7/3/2003 7:31:15 AM
BLD-Framing/Rough-in6/23/20036/24/20036/24/2003PPART
DetailsDave Hannah
###-#### 4th floor east half ok to cover rooms only 6/25/2003 7:49:11 AM
BLD-Wall cover6/19/20036/23/20036/23/2003PPART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore 4th floor ne 1/4 rooms only no shafts ok to cover 6/23/2003 4:11:32 PM
FIRE-Sprinkler Rough-in6/23/20036/23/20036/23/2003PPART
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore discussed requirements for first floor occupancy; need sprinkler plans submitted and alarms working 6/23/2003 3:58:23 PM
BLD-Wall cover6/19/20036/20/20036/20/2003PPART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore ground floor area ok to cover walls 6/20/2003 2:12:03 PM
BLD-Framing/Rough-in6/17/20036/17/20036/17/2003PPART
DetailsDave Hannah
dennis 2nd story west side; Phone #: ###-#### Internet Inspection Request from: Barbara Moore s.w 1/4 2nd floor ok to cover rooms leave shafts open 6/17/2003 5:00:10 PM
BLD-Wall cover6/12/20036/13/20036/13/2003ACANC
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 6/13/2003 12:30:47 PM
BLD-Wall cover6/13/20036/13/20036/13/2003PPART
DetailsDave Hannah
fris floor noth west 1/4 romms only and sec floor north west 1/4 rooms 6/16/2003 9:50:05 AM
BLD-Wall cover6/9/20036/10/20036/10/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Wall cover6/6/20036/9/20036/9/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 1st floor north west 1/4 ok to cover rooms 6/9/2003 10:08:31 PM
BLD-Wall cover6/3/20036/4/20036/4/2003PDONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in6/2/20036/3/20036/3/2003APART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover shafts on east half of fist and second floors 6/3/2003 1:02:40 PM
BLD-Framing/Rough-in6/3/20036/3/20036/3/2003PDONE
DetailsDave Hannah
BLD-Framing/Rough-in5/27/20035/28/20035/28/2003ADONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/28/20035/28/20035/28/2003PPART
DetailsDave Hannah
3rd floor ne half rooms ok all but for shafts and elec conduit main runs also se half 3rd floor same as ne section allen has punch list 5/28/2003 2:19:54 PM
BLD-Wall cover5/22/20035/23/20035/23/2003ADONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore second floor east half 5/23/2003 12:55:09 PM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003PPART
DetailsDave Hannah
ALLEN--OK TO COVER ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie second floor area b south half ok to cover al but bath rooms 5/19/2003 5:22:07 PM
BLD-Wall cover5/15/20035/16/20035/16/2003PPART
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore second floor north east 1/4 ok to start covering all but bath room ares 5/16/2003 4:15:21 PM
BLD-Other5/13/20035/14/20035/14/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/13/2003 at 12:59:54 PM. Contact: ###-####. rooms 100,01,02/04/06,145,146.48/50 ok to cover 5/14/2003 5:46:28 PM
BLD-Framing/Rough-in5/9/20035/12/20035/12/2003ADONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in5/6/20035/7/20035/7/2003PPART
DetailsDave Hannah
ALAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs rooms 136,138,140,142,144,145 ok to cover 5/7/2003 3:40:34 PM
BLD-Framing/Rough-in5/1/20035/2/20035/2/2003ADONE
DetailsDave Hannah
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/2/20035/2/20035/2/2003PDONE
DetailsDave Hannah
BLD-Framing/Rough-in4/28/20034/29/20034/29/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/28/2003 at 12:07:40 PM. Contact: ###-####.
BLD-Conference4/22/20034/23/20034/23/2003ADONE
DetailsDave Hannah
###-#### john MOC UP APPT 1HR FIRE WALLS 4/23/2003 12:19:21 PM
BLD-Framing/Rough-in4/22/20034/22/20034/22/2003PCANC
DetailsCarl Dependahl
john level one ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in4/18/20034/18/20034/18/2003PDONE
DetailsDave Hannah
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in4/17/20034/17/20034/17/2003PPART
DetailsDave Hannah
FIRE-Sprinkler Rough-in4/11/20034/11/20034/11/2003PPART
DetailsRick Jackson
area B on first floor okay to cover
BLD-Conference3/25/20033/26/20033/26/2003ADONE
DetailsDave Hannah
BLD-Framing/Rough-in3/25/20033/25/20033/25/2003PDONE
DetailsDave Hannah
BLD-Conference3/19/20033/20/20033/20/2003ADONE
DetailsDave Hannah
###-#### PER MIKE PHILLIPS
BLD-Conference3/20/20033/20/20033/20/2003PCANC
DetailsDave Hannah
BLD-Conference3/17/20033/18/20033/18/2003PDONE
DetailsDave Hannah
at 1:30
BLD-Conference3/17/20033/18/20033/18/2003PPASS
DetailsCarl Dependahl
at 1: 30 w/ Dave H. other trades & PCL supt at site. 3/18/2003 5:30:06 PM
BLD-Conference3/13/20033/13/20033/13/2003PDONE
DetailsDave Hannah
john ###-####
BLD-Conference3/11/20033/12/20033/12/2003PDONE
DetailsDave Hannah
###-#### fire stopping 3/12/2003 4:49:32 PM
BLD-Conference3/12/20033/12/20033/12/2003PDONE
DetailsDave Hannah
BLD-Conference3/10/20033/10/20033/10/2003PDONE
DetailsDave Hannah
talked wiyh john about fire proofing 3/10/2003 5:34:40 PM
BLD-Conference3/4/20033/4/20033/4/2003ADONE
DetailsDave Hannah
BLD-Conference2/25/20032/26/20032/26/2003ADONE
DetailsDave Hannah
###-####
BLD-Framing/Rough-in2/12/20032/13/20032/13/2003PPART
DetailsDave Hannah
BLD-Conference2/12/20032/12/20032/12/2003PDONE
DetailsDave Hannah
BLD-Conference12/13/200212/13/200212/13/2002PDONE
DetailsDave Hannah
on site to walk project and check spec inspection reports
FIRE-Conference12/5/200212/9/200212/9/2002PPART
DetailsRick Jackson
###-#### met with GC and owners rep about requirements during construction; told them to get plans for the standpipe requirements for additional floors 12/10/2002 10:44:37 AM
BLD-Footing11/21/200211/22/200211/22/2002APART
DetailsJim Storey
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie coered with special insp. 11/22/2002 10:23:37 AM
BLD-Conference11/12/200211/12/200211/12/2002APASS
DetailsCarl Dependahl
Need P.T. eng's direction for possible nicked cables, q.c. for welded assy's...etc. 11/12/02 11:48:35 AM
BLD-Conference11/8/200211/11/200211/11/2002PCANC
DetailsCarl Dependahl
BLD-Conference11/7/200211/8/200211/8/2002AFAIL
DetailsDave Hannah
c/n posted #1 stop drilling holes in p/t deck #2 need engineer or architect of record to submit a plan for drilling the p/t deck #3 need engineer to check three holes that crew may have hit p/t cables in and make recommendations 11/8/2002 2:52:04 PM
BLD-Conference11/6/200211/7/200211/7/2002ADONE
DetailsDave Hannah
trying to get a meeting set up 11/7/2002 3:45:18 PM
BLD-Conference11/5/200211/6/200211/6/2002PCANC
DetailsSteven Webb
BLD-Conference11/5/200211/6/200211/6/2002PCANC
DetailsSteven Webb
BLD-Conference11/5/200211/6/200211/6/2002PCANC
DetailsSteven Webb
Randy, ###-#### Requested conference for 11/7/02 a.m not 11/6/02 p.m. 11/6/2002 2:03:35 PM
BLD-Conference11/4/200211/5/200211/5/2002APASS
DetailsCarl Dependahl
Randy....need spec insp procedure, eng's guidelines for drilling existing P.T. deck, etc. 11/8/02 4:13:06 PM
BLD-Conference11/1/200211/4/200211/4/2002ADONE
DetailsDave Hannah
BLD-Conference11/4/200211/4/200211/4/2002PPART
DetailsCarl Dependahl
Pre-con w/ Dave & Randy Jordan: need all changes, RFI's, etc onsite; provide special insp "schedule"...req's further review/for inspection operation. 11/4/02 4:23:45 PM
BLD-Conference10/31/200211/1/200211/1/2002ACANC
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Conference11/1/200211/1/200211/1/2002ACANC
DetailsDave Hannah
BLD-Conference11/1/200211/1/200211/1/2002ACANC
DetailsCarl Dependahl
###-####
BLD-Conference11/1/200211/1/200211/1/2002ACANC
DetailsDave Hannah
rescheduled from 11-1