BLD-Final | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PASS |
Jim Sly
|
|
|
steve please call first; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK for Perm Occ. 5/28/2003 11:17:30 AM
|
Permanent Occupancy | | 5/28/2003 | 5/28/2003 | | DONE |
|
|
|
|
BLD-Final | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PART |
Jim Sly
|
|
|
MEL; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Temp occ. C/N Need to obtain Perm Occ status within 90 days of this notice. 5/14/2003 3:25:13 PM
|
FIRE-Final Inspection | 5/14/2003 | 5/14/2003 | 5/14/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinklers, fire alarm and fire life safety finaled
|
BLD-Final | 5/13/2003 | 5/13/2003 | 5/13/2003 | P | FAIL |
Jim Sly
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Annette Moore Need signatures. 5/13/2003 3:18:14 PM
|
FIRE-Final Inspection | 5/13/2003 | 5/13/2003 | 5/13/2003 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given for fire alarm until the fire alarm permit is finaled. Life safety is OK other than the fire alarm
|
BLD-Conference | 5/9/2003 | 5/9/2003 | 5/9/2003 | A | DONE |
Troy Cobbley
|
|
|
I left a correction notice with construction superintendant, Mel, stating that the new addition to the church can not be occupied until all sign offs had been received and a Certificate of Occupancy is issued.
|
BLD-Final | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | FAIL |
Jim Sly
|
|
|
MEL; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need all req signatures 5/8/2003 3:57:23 PM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | PART |
Jim Sly
|
|
|
###-#### Corridors and grid OK. 4/22/2003 4:12:27 PM
|
BLD-Framing/Rough-in | 4/11/2003 | 4/11/2003 | 4/11/2003 | P | PART |
Jim Sly
|
|
|
###-#### 4/11/2003 5:19:39 PM 91-3014 4/11/2003 5:19:39 PM 4/11/2003 5:20:41 PM Frame at N.E. corner by Mech room....OK. 4/11/2003 5:21:25 PM
|
BLD-Framing/Rough-in | 2/28/2003 | 2/28/2003 | 2/28/2003 | P | PART |
Jim Sly
|
|
|
###-#### MEL Kitchen area and adjacent rooms......East corridor OK for cover. 2/28/2003 3:07:36 PM
|
BLD-Framing/Rough-in | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung OK to cover West 1/2 of bldg....front entry and canopy. 2/13/2003 2:47:29 PM
|
BLD-Framing/Rough-in | 2/11/2003 | 2/11/2003 | 2/11/2003 | P | PART |
Jim Sly
|
|
|
###-#### OK to cover East wall Mech room. 2/11/2003 2:21:44 PM
|
BLD-Framing/Rough-in | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PART |
Jim Sly
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK to cover both sides of Kitch wall between grid lines C&B No electr in upper part this wall. 2/7/2003 1:26:28 PM
|
BLD-Framing/Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 | P | PART |
Jim Sly
|
|
|
###-#### Walk thru with Mel prior to frame insp. 2/3/2003 3:43:41 PM
|
BLD-Framing/Rough-in | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PART |
Jim Sly
|
|
|
###-#### OSB shear at West wall.....OK for veneer brick. 12/9/2002 2:55:04 PM
|
BLD-Framing/Rough-in | 10/24/2002 | 10/25/2002 | 10/25/2002 | P | PART |
Dave Hannah
|
|
|
MEL; Phone #: ###-#### Internet Inspection Request from: Darla Downs masonry inspected by M.T.I. 10/25/2002 4:33:23 PM
|
BLD-Foundation | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | PART |
Tom Arcoraci
|
|
|
masonary insp mel; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie mti on site 10/17/2002 8:42:57 AM
|
BLD-Conference | 10/9/2002 | 10/10/2002 | 10/10/2002 | A | DONE |
Dave Hannah
|
|
|
###-#### can call for conference and just talk over the phone masonry issues 10/10/2002 11:55:04 AM
|
BLD-Footing | 8/7/2002 | 8/8/2002 | 8/8/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### mti on site 8/8/2002 10:21:34 AM
|
BLD-Foundation | 7/29/2002 | 7/30/2002 | 7/30/2002 | P | PART |
Dave Hannah
|
|
|
###-#### MEL
|
BLD-Footing | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### mel mti on site
7/26/2002 8:26:19 AM
|
BLD-Footing | 7/22/2002 | 7/23/2002 | 7/23/2002 | P | PART |
Dave Hannah
|
|
|
mel; Phone #: ###-#### mti on site to test conc and inspect rebar 7/23/2002 4:26:34 PM
|
BLD-Foundation | 7/22/2002 | 7/23/2002 | 7/23/2002 | P | PART |
Dave Hannah
|
|
|
mel; Phone #: ###-####
|
BLD-Foundation | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PART |
Dave Hannah
|
|
|
; Phone #: ###-####
|
BLD-Footing | 7/12/2002 | 7/15/2002 | 7/15/2002 | A | NR |
Dave Hannah
|
|
|
FT MEL- ###-#### will have mti check be for placing conc 7/15/2002 10:35:17 AM
|
BLD-Footing | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | NR |
Dave Hannah
|
|
|
late am ###-####
|
BLD-Footing | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PART |
Dave Hannah
|
|
|
mti on site this project is being covered by spec inspection nent over project with in spector 7/10/2002 2:51:26 PM
|