BLD-Final | 4/8/2002 | 4/9/2002 | 4/9/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### jim ok for perm occ 4/9/2002 11:23:38 AM
|
Permanent Occupancy | | 4/9/2002 | 4/9/2002 | | DONE |
|
|
|
|
BLD-Final | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 17:02:49. Contact: ###-####. entry door not set up to brake away at 30 lbs need to remove thumb latches with key and post sign above door dr to remain unlocked during bs hours 4/8/2002 12:09:27 PM
|
FIRE-Alarm Testing | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | PASS |
Troy Cobbley
|
|
|
fire alarm system finaled 4/8/2002 10:11:16 AM
|
FIRE-Final Inspection | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | PASS |
Troy Cobbley
|
|
|
fire alarm, fire sprinklers and fire/life safety finaled 4/8/2002 10:11:47 AM
|
BLD-Final | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 09:40:18. Contact: ###-####.
|
FIRE-Alarm Testing | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | FAIL |
Troy Cobbley
|
|
|
two duct detectors in the new area of the store do not work and need testing, signals need to be reverified to the monitoring station (alarm,trouble and supervisiory) 4/5/2002 3:12:09 PM
|
FIRE-Final Inspection | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Troy Cobbley
|
|
|
life/safety finaled. 4/5/2002 3:13:48 PM
|
FIRE-Final Inspection | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | NR |
Troy Cobbley
|
|
|
fire alarm and life/safety not ready 4/3/2002 4:20:06 PM
|
FIRE-Final Inspection | 4/2/2002 | 4/2/2002 | 4/2/2002 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinklers OK
|
BLD-Framing/Rough-in | 3/28/2002 | 3/29/2002 | 3/29/2002 | A | PART |
Dave Hannah
|
|
|
grid ceiling cover- jim ###-#### ok to cover 3/29/2002 12:15:38 PM
|
BLD-Framing/Rough-in | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PART |
Dave Hannah
|
|
|
CEILING GRID INSPECT ###-#### JIM pods ok but still need to wire ends of runs 3/28/2002 3:18:38 PM
|
BLD-Framing/Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 17:59:34. Contact: ###-####. Coffee room..... Need (1) lateral wall brace check at ceiling insp. 3/28/2002 10:26:18 AM
|
BLD-Wall cover | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 18:00:19. Contact: ###-####. OK to cover wall at coffee room. 3/28/2002 10:26:45 AM
|
BLD-Wall cover | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/19/2002 at 10:55:10. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Dave Hannah
|
|
|
fr for walls--insp- jim ###-#### front office areaok need top of wall to roof 45 angel braces 3/15/2002 5:37:08 PM
|