BLD-Aging Inspection | 2/20/2004 | 2/20/2004 | 2/20/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 6/27/2002 | 6/27/2002 | 6/27/2002 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 06:59:40. Contact: ###-####....card to owner 6/27/2002 11:38:49 AM
|
FIRE-Final Inspection | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 6/26/2002 11:46:38 AM
|
FIRE-Final Inspection | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### dan need alarm plans submitted per plan review notes; strobes not covering all areas; detectors within 3 ft of supply diffusers in hallways; there appears to be 2 in duct detectors as there are two remote LED's; not HVAC plans 5/28/2002 2:55:15 PM
|
BLD-Framing/Rough-in | 4/17/2002 | 4/17/2002 | 4/17/2002 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 07:27:59. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/17/2002 | 4/17/2002 | 4/17/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 4/17/2002 2:15:43 PM . Ok very little framing, door relocation is scope, also the grid ceiling has been up graded to comply with code,as wire-ties and light supports added, to entire ceiling. 4/17/2002 2:19:14 PM
|