Code Occupancy Approval | | | 3/29/2005 | | PASS |
|
|
|
compliance met.
|
BLD-Final | 3/24/2005 | 3/25/2005 | 3/25/2005 | A | PASS |
Dave Hannah
|
|
|
tammy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for c.c 3/25/2005 8:38:47 AM
|
BLD-Footing | 1/14/2005 | 1/14/2005 | 1/14/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 9:47:06 AM. Contact: ###-####. ok pending spec insp sign off 1/14/2005 4:21:50 PM
|
BLD-Final | 11/5/2004 | 11/5/2004 | 11/5/2004 | P | PASS |
Dave Hannah
|
|
|
Tammy; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Final | 11/3/2004 | 11/3/2004 | 11/3/2004 | P | NR |
Lane Manuel
|
|
|
Tammy; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
No one on job site.
spoke w/ Tammy by phone. Instructed her to reschedule w/ Dave Hannah 11/3/2004 1:12:35 PM
|
BLD-Final | 10/18/2004 | 10/18/2004 | 10/18/2004 | P | FAIL |
Dave Hannah
|
|
|
tammy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie not ready 10/18/2004 3:54:44 PM
|
BLD-Final | 8/10/2004 | 8/10/2004 | 8/10/2004 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/6/2004 at 2:09:30 PM. Contact: ###-####.
|
BLD-Final | 8/6/2004 | 8/9/2004 | 8/9/2004 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/6/2004 at 2:09:30 PM. Contact: ###-####.
|
FIRE-Final Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 | P | PASS |
Rick Jackson
|
|
|
Basement fire/life safety okay; alarm and sprinkler permits finalled 8/6/2004 2:19:05 PM
|
FIRE-Final Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | A | FAIL |
Rick Jackson
|
|
|
Need knox box; address number on Broadway to have Front street added 8/2/2004 10:51:10 AM
|
BLD-Aging Inspection | 6/7/2004 | 6/7/2004 | 6/7/2004 | | DONE |
Dave Hannah
|
|
|
wip 6/7/2004 8:14:24 AM
|
BLD-Aging Inspection | 3/31/2004 | 3/31/2004 | 3/31/2004 | | PASS |
Dave Hannah
|
|
|
wip 3/31/2004 8:12:56 AM
|
BLD-Framing/Rough-in | 1/30/2004 | 1/30/2004 | 1/30/2004 | P | DONE |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 1/8/2004 | 1/9/2004 | 1/9/2004 | P | PART |
Dave Hannah
|
|
|
pete- ###-#### ok for temp occ 1/9/2004 5:18:08 PM
|
FIRE-Final Inspection | 1/8/2004 | 1/9/2004 | 1/9/2004 | A | PART |
Rick Jackson
|
|
|
###-####- pete Phase I (west parking under PA2) is okay to use pending all strcutural sign-off 1/9/2004 10:56:34 AM
|
FIRE-Final Inspection | 1/5/2004 | 1/6/2004 | 1/6/2004 | A | FAIL |
Rick Jackson
|
|
|
pete-- ###-#### need stair two exit door hardware and completion of handrails - remove all construction materials and add gate at ground level; extinguishers need tags and signs above extinguishers; need heat in FACP room to maintain above 32 degrees; replace sprinkler head painted by stair two door; need signs on FDC's and locks on PIV's; sign on riser room door; 1/6/2004 4:19:21 PM
|
FIRE-Final Inspection | 1/5/2004 | 1/5/2004 | 1/5/2004 | P | CANC |
Rick Jackson
|
|
|
###-#### pete
|
Code Occupancy Approval Temp | 1/2/2004 | 1/2/2004 | 1/2/2004 | P | DONE |
Wm. Michael Meloy
|
|
|
Staffed issue with Tempra Wilson, OK to grant Temp Occupancy for garage only. 1/2/2004 2:19:07 PM
|
BLD-Conference | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | DONE |
Dave Hannah
|
|
|
set up profit meeting 12/18/2003 8:59:03 AM
|
BLD-Conference | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PART |
Dave Hannah
|
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Conference | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PART |
Rick Jackson
|
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes met with JP and Dave Hannah about temp occupancy for the garage; will have to confer with Sam and Dave Miller about this and let JP know of any requirements 12/17/2003 4:24:38 PM
|
BLD-Framing/Rough-in | 12/16/2003 | 12/16/2003 | 12/16/2003 | P | DONE |
Dave Hannah
|
|
|
pete ###-####
|
FIRE-Conference | 12/16/2003 | 12/16/2003 | 12/16/2003 | P | PART |
Rick Jackson
|
|
|
pete-- ###-#### location of knox box at remote annunciator - main entrance 12/16/2003 4:09:06 PM
|
FIRE-Conference | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | PART |
Rick Jackson
|
|
|
Pete
; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes for occupying the basement parking per Dave Miller the sprinkler system must be operational for the entire parking garage and access, alarms working, etc. 11/5/2003 3:37:04 PM
|
BLD-Footing | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | PART |
Jim Storey
|
|
|
###-#### mike ###-#### mike placed day before with special insp. 10/3/2003 8:58:03 AM
|
BLD-Foundation | 8/4/2003 | 8/7/2003 | 8/7/2003 | P | PART |
Carl Dependahl
|
|
|
###-#### mike pend special insp reports 8/7/2003 4:16:52 PM
|
BLD-Footing | 8/4/2003 | 8/5/2003 | 8/5/2003 | P | PART |
Carl Dependahl
|
|
|
###-#### mike
|
BLD-Conference | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | PASS |
Carl Dependahl
|
|
|
Randy ###-####...need plbg penetrations ok'd for 3hr deck...pvc/cast?? w pro set sleeves 7/28/2003 4:27:26 PM
|
BLD-Foundation | 7/15/2003 | 7/17/2003 | 7/17/2003 | P | PART |
Carl Dependahl
|
|
|
at 2ish???###-#### mike ..ok, pend reports 7/17/2003 5:08:37 PM
|
BLD-Conference | 7/2/2003 | 7/3/2003 | 7/3/2003 | A | NR |
Carl Dependahl
|
|
|
RE generator....need listing, etc 7/3/2003 5:59:43 PM
|
BLD-Conference | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Carl Dependahl
|
|
|
w/Rick J. re generator exhaust
|
BLD-Conference | 6/25/2003 | 6/26/2003 | 6/26/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ Margie & Randy J. re shaft req's thru deck 6/26/2003 5:22:10 PM
|
BLD-Foundation | 6/16/2003 | 6/19/2003 | 6/19/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ...deck, mti onsite, receiving reports. 6/19/2003 5:26:16 PM
|
BLD-Foundation | 6/16/2003 | 6/18/2003 | 6/18/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...preparing to place deck, mti onsite. 6/18/2003 3:51:26 PM
|
BLD-Foundation | 6/16/2003 | 6/16/2003 | 6/16/2003 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore allready poured inspected by mike spiker with MTI 6/16/2003 4:20:48 PM
|
BLD-Foundation | 6/6/2003 | 6/13/2003 | 6/13/2003 | A | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore covered by MTI spec inspector 6/13/2003 12:32:09 PM
|
BLD-Foundation | 6/6/2003 | 6/12/2003 | 6/12/2003 | P | DONE |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 6/6/2003 | 6/11/2003 | 6/11/2003 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore mti on site 6/11/2003 4:50:34 PM
|
BLD-Footing | 6/6/2003 | 6/10/2003 | 6/10/2003 | P | DONE |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 6/6/2003 | 6/10/2003 | 6/10/2003 | A | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 6/6/2003 | 6/9/2003 | 6/9/2003 | P | DONE |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore done by spec inspection no time to check on project 6/9/2003 10:09:13 PM
|
BLD-Foundation | 5/27/2003 | 6/3/2003 | 6/3/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 5/27/2003 | 6/2/2003 | 6/2/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 5/27/2003 | 6/2/2003 | 6/2/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, misc core areas, MTI onsite 6/2/2003 4:01:12 PM
|
BLD-Foundation | 5/27/2003 | 5/30/2003 | 5/30/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, MtI onsite 5/30/2003 4:49:21 PM
|
BLD-Foundation | 5/27/2003 | 5/29/2003 | 5/29/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...mti onsite 5/29/2003 2:02:37 PM
|
BLD-Footing | 5/27/2003 | 5/28/2003 | 5/28/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore mti onsite 5/28/2003 3:10:23 PM
|
BLD-Foundation | 5/27/2003 | 5/28/2003 | 5/28/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...south wall, mti onsite...pend reports 5/28/2003 3:10:01 PM
|
BLD-Footing | 5/14/2003 | 5/21/2003 | 5/21/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore; wip, mti onsite 5/21/2003 4:10:58 PM
|
BLD-Footing | 5/14/2003 | 5/20/2003 | 5/20/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...mti onsite 5/20/2003 4:59:24 PM
|
BLD-Footing | 5/14/2003 | 5/19/2003 | 5/19/2003 | A | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore MT 5/19/2003 11:47:16 AM I onsite...pend insp report 5/19/2003 11:47:29 AM
|
BLD-Footing | 5/14/2003 | 5/19/2003 | 5/19/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 5/14/2003 | 5/16/2003 | 5/16/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore..east walls/ftgs...MTI onsite. 5/19/2003 2:26:07 PM
|
BLD-Footing | 5/14/2003 | 5/15/2003 | 5/15/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...east portion walls, MTI onsite, pending report. 5/15/2003 1:53:07 PM
|
BLD-Footing | 5/7/2003 | 5/14/2003 | 5/14/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...east wall portion, mti onsite. 5/14/2003 2:58:06 PM
|
BLD-Footing | 5/7/2003 | 5/13/2003 | 5/13/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore, mti onsite...east section 5/13/2003 1:49:09 PM
|
BLD-Footing | 5/7/2003 | 5/12/2003 | 5/12/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore.. MTI onsite
5/13/2003 1:27:46 PM
|
BLD-Foundation | 5/7/2003 | 5/9/2003 | 5/9/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore; mti onsite, pend report. 5/9/2003 1:39:06 PM
|
BLD-Footing | 5/7/2003 | 5/8/2003 | 5/8/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 4/30/2003 | 5/7/2003 | 5/7/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; wip 5/7/2003 3:08:43 PM
|
BLD-Foundation | 4/30/2003 | 5/7/2003 | 5/7/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip, mti onsite
5/7/2003 3:09:33 PM
|
BLD-Footing | 4/30/2003 | 5/6/2003 | 5/6/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...MTI onsite 5/6/2003 3:23:16 PM
|
BLD-Foundation | 4/30/2003 | 5/6/2003 | 5/6/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore MTI onsite 5/6/2003 3:23:25 PM
|
BLD-Footing | 4/30/2003 | 5/5/2003 | 5/5/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; pend report 5/5/2003 4:31:49 PM
|
BLD-Foundation | 4/30/2003 | 5/5/2003 | 5/5/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; pend MTI's report 5/5/2003 4:32:14 PM
|
BLD-Foundation | 4/30/2003 | 5/2/2003 | 5/2/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore....walls & "core", pend MTI report 5/2/2003 5:09:26 PM
|
BLD-Footing | 4/30/2003 | 5/1/2003 | 5/1/2003 | P | PART |
Carl Dependahl
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walls at S.E. corner, pend report 5/1/2003 5:08:29 PM
|
BLD-Foundation | 4/23/2003 | 4/30/2003 | 4/30/2003 | P | PART |
Carl Dependahl
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs...pend MTI report 4/30/2003 2:11:25 PM
|
BLD-Foundation | 4/23/2003 | 4/29/2003 | 4/29/2003 | P | PART |
Carl Dependahl
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs wall(s) at S.E. portion water ctr, pend MTI report 4/29/2003 4:32:55 PM
|
BLD-Footing | 4/23/2003 | 4/28/2003 | 4/28/2003 | P | PART |
Carl Dependahl
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs, MTI onsite 4/28/2003 5:18:43 PM
|
BLD-Foundation | 4/23/2003 | 4/28/2003 | 4/28/2003 | P | PART |
Carl Dependahl
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs rec'd add'l scope of work from MTI...change from Strata 4/28/2003 5:19:26 PM
|
BLD-Foundation | 4/23/2003 | 4/25/2003 | 4/25/2003 | P | DONE |
Dave Hannah
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs don by spec inspection 4/25/2003 3:39:28 PM
|
BLD-Foundation | 4/23/2003 | 4/24/2003 | 4/24/2003 | P | PART |
Carl Dependahl
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Concrete | 4/18/2003 | 4/21/2003 | 4/21/2003 | A | PART |
Carl Dependahl
|
|
|
Mike W....MTI onsite 4/21/2003 3:22:19 PM
|
BLD-Conference | 4/21/2003 | 4/21/2003 | 4/21/2003 | P | PASS |
Carl Dependahl
|
|
|
deck, wip...pend reports 4/21/2003 5:01:17 PM
|
BLD-Conference | 4/17/2003 | 4/18/2003 | 4/18/2003 | P | PASS |
Carl Dependahl
|
|
|
permit status...still valid for garage per Jenn. G. 4/18/2003 12:09:02 PM
|
BLD-Concrete | 4/15/2003 | 4/16/2003 | 4/16/2003 | P | PART |
Carl Dependahl
|
|
|
struct masonry 2nd lift ok, pend report by Strata. 4/16/2003 2:35:03 PM
|
BLD-Footing | 4/14/2003 | 4/16/2003 | 4/16/2003 | P | PART |
Carl Dependahl
|
|
|
###-#### mike ...East portion "ID. Water Center"...MTI onsite, not strata 4/16/2003 4:37:14 PM
|
BLD-Conference | 4/15/2003 | 4/15/2003 | 4/15/2003 | P | PART |
Carl Dependahl
|
|
|
WIP...pend spec insp; State to assume permit? 4/15/2003 5:29:07 PM
|
BLD-Footing | 4/14/2003 | 4/15/2003 | 4/15/2003 | P | PART |
Carl Dependahl
|
|
|
###-#### mike...south wall line ftgs, pend SI report 4/16/2003 2:10:51 PM
|
BLD-Foundation | 4/10/2003 | 4/11/2003 | 4/11/2003 | A | PART |
Carl Dependahl
|
|
|
###-####...deck 4/11/2003 4:03:11 PM...pending strata's report. 4/11/2003 4:05:08 PM
|
BLD-Concrete | 3/4/2003 | 3/5/2003 | 3/5/2003 | A | PART |
Carl Dependahl
|
|
|
wip, pend insp reports...deck. 3/5/2003 5:40:22 PM
|
BLD-Concrete | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | NR |
Carl Dependahl
|
|
|
need conf re apts 3/5/2003 6:03:20 PM
|
BLD-Conference | 3/4/2003 | 3/4/2003 | 3/4/2003 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Conference | 3/4/2003 | 3/4/2003 | 3/4/2003 | P | PASS |
Carl Dependahl
|
|
|
apt plans issued? 3/4/2003 5:25:46 PM
|
BLD-Concrete | 2/28/2003 | 3/3/2003 | 3/3/2003 | A | PART |
Carl Dependahl
|
|
|
Brian; deck, pend report by Strata 3/4/2003 1:59:30 PM
|
BLD-Concrete | 2/27/2003 | 2/28/2003 | 2/28/2003 | A | PART |
Carl Dependahl
|
|
|
Brian..wip. 2/28/2003 4:55:56 PM
|
BLD-Footing | 2/25/2003 | 2/26/2003 | 2/26/2003 | A | PART |
Carl Dependahl
|
|
|
brian ###-####...wip, pend reports. 2/28/2003 10:30:29 AM
|
BLD-Concrete | 2/21/2003 | 2/24/2003 | 2/24/2003 | A | PART |
Carl Dependahl
|
|
|
walked deck, WIP, ok pend Spec insp reports 2/28/2003 10:30:00 AM
|
BLD-Concrete | 2/20/2003 | 2/21/2003 | 2/21/2003 | A | PART |
Carl Dependahl
|
|
|
Brian...WIP, strata onsite. 2/24/2003 1:25:21 PM
|
BLD-Foundation | 2/19/2003 | 2/20/2003 | 2/20/2003 | P | PART |
Carl Dependahl
|
|
|
brian ###-####, wip, Strata onsite. 2/20/2003 5:41:00 PM
|
BLD-Concrete | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | CANC |
Carl Dependahl
|
|
|
Jim i'm not sure if this has anything to do with the plan mod!!!! Brian ###-####
|
BLD-Foundation | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | PART |
Carl Dependahl
|
|
|
north portion deck; bar being placed....wip pend spec insp reprts 2/12/2003 4:55:14 PM
|
BLD-Foundation | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | PART |
Carl Dependahl
|
|
|
BRIAN ###-####
|
BLD-Concrete | 1/27/2003 | 1/27/2003 | 1/27/2003 | P | PART |
Carl Dependahl
|
|
|
cols, WIP, pend special insp report.
|
BLD-Conference | 1/27/2003 | 1/27/2003 | 1/27/2003 | P | PASS |
Carl Dependahl
|
|
|
work on east portion excavation not complete, decision expected soon. 1/27/2003 2:47:14 PM
|
BLD-Conference | 1/23/2003 | 1/23/2003 | 1/23/2003 | A | PASS |
Carl Dependahl
|
|
|
see BLD02-00163 history, too. 1/23/2003 10:50:04 AM
|
BLD-Conference | 1/6/2003 | 1/7/2003 | 1/7/2003 | A | PASS |
Carl Dependahl
|
|
|
###-#### ... WIP, resubmittals req'd if project is halved. 1/7/2003 11:47:36 AM
|
BLD-Conference | 1/6/2003 | 1/6/2003 | 1/6/2003 | P | PASS |
Carl Dependahl
|
|
|
W/ Brian Murphy, Mc Alvaine...excavation at east portion is delayed, should commence by 1-28-03; checked work vs. plans...walls ok up to north-south "bulkheads". (may give impression that only 1/2 of work being done?)
|
BLD-Foundation | 1/6/2003 | 1/6/2003 | 1/6/2003 | P | PART |
Carl Dependahl
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, WIP, pend special insp reports 1/6/2003 5:02:08 PM
|
BLD-Conference | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | DONE |
Dave Hannah
|
|
|
on site to walk project and check spec inspection reports
|
BLD-Foundation | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungplaced with special insp. pending report. 12/13/2002 3:25:31 PM
|
BLD-Footing | 12/11/2002 | 12/11/2002 | 12/11/2002 | P | PART |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung..WIP, need clarify de-watering systen spec.insps...who? 12/11/2002 4:00:29 PM
|
BLD-Footing | 12/3/2002 | 12/3/2002 | 12/3/2002 | P | PART |
Carl Dependahl
|
|
|
###-####...wip, strata onsite...North wall ftgs. 12/3/2002 1:57:51 PM
|
BLD-Foundation | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | PART |
Carl Dependahl
|
|
|
found wall- brian ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...strata onsite....walls at north side 12/2/2002 3:58:14 PM
|
BLD-Footing | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | PART |
Dave Hannah
|
|
|
done by spec inspection mti 11/27/2002 12:42:36 PM
|
BLD-Foundation | 11/26/2002 | 11/26/2002 | 11/26/2002 | A | CANC |
Jim Storey
|
|
|
###-#### ###-#### out of time 11/26/2002 4:51:01 PM
|
BLD-Footing | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | PART |
Carl Dependahl
|
|
|
BRIAN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...North ramp wall ftgs, WIP, Strata (Max) ; May further info re dewatering system special insp program 11/22/02 3:06:26 PM
|
BLD-Footing | 11/20/2002 | 11/20/2002 | 11/20/2002 | P | PART |
Dave Hannah
|
|
|
###-#### strata on site to do spec insp 11/20/2002 4:30:42 PM
|