Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-00266
StatusFinaled
Name THE BIG EASY
Site Address 416 S 9TH ST Unit: 106
Project Name9TH STREET WAREHOUSES
Customer Number 
ePlanReviewNo
Description
(THE BIG EASY) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To remodel the lower level of an existing assembly room to increase the allowable occupant load within the room. The mezzanine level will maintain its maximum occupant load at 192. A 2,500 square foot expansion area in the basement will accommodate support functions (e.g. kitchen, dressing room, storage, etc.) for the assembly room. After the expansion, this tenant will have a total floor area of 11,624 square feet. The maximum occupant load for the lower level of the assembly room is 747 (includes patrons, employees, security personnel, performers, etc.). An approved sign shall be posted near the main exit from the lower level stating: "Maximum occupant load 747 NO tables OR chairs, 348 tables AND/OR chairs" or words to that effect. Work is to include structural headers and trimmers at widened doorways, stairways, guardrails, handrails, fire doors, new structural bracing for the mezzanine, and a toilet/shower room accessible to the disabled all per approved drawings, engineering, and plan review conditions on file. Selective demolition is also covered under this permit. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference2/2/20052/2/20052/2/2005ACANC
DetailsDave Hannah
BLD-Final2/2/20052/2/20052/2/2005PPASS
DetailsDave Hannah
inspection for occ ok for perm occ dave had carles c/n we went tough all the items and I walked the project allc/n items comlpted 2/2/2005 1:39:50 PM
BLD-Final2/2/20052/2/20052/2/2005PDONE
DetailsDave Hannah
inspection for occ
FIRE-Final Inspection2/2/20052/2/20052/2/2005APASS
DetailsRick Jackson
Final okay 2/2/2005 10:49:18 AM
FIRE-Final Inspection2/2/20052/2/20052/2/2005APASS
DetailsRick Jackson
Permanent Occupancy 2/2/20052/2/2005 DONE
Details
BLD-Aging Inspection2/20/20042/20/20042/20/2004 DONE
DetailsDave Hannah
BLD-Aging Inspection8/6/20038/6/20038/6/2003 PASS
DetailsCarl Dependahl
WIP... 8/6/2003 11:28:09 AM WIP... statde work complete?? need engs ok for mezz welds8/6/2003 11:28:09 AM 8/6/2003 11:30:19 AM
BLD-Final5/15/20035/16/20035/16/2003ANR
DetailsCarl Dependahl
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs...keep c/n. 5/16/2003 10:40:41 AM
FIRE-Final Inspection5/15/20035/16/20035/16/2003APART
DetailsRick Jackson
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs balance report for new hood needed 5/16/2003 4:20:29 PM
BLD-Final5/14/20035/14/20035/14/2003PPART
DetailsCarl Dependahl
Dave...###-#### c/n, occ load signs, door listings, misc finish, obtain other finals; ok for t/o except kitchen. 5/14/2003 6:31:24 PM obtain complete mech finals 5/14/2003 6:32:58 PM
BLD-Framing/Rough-in5/13/20035/14/20035/14/2003APART
DetailsCarl Dependahl
dave, shaft ok...need other insps for final. 5/14/2003 11:21:59 AM
BLD-Final5/12/20035/13/20035/13/2003PNR
DetailsCarl Dependahl
DAVID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in5/12/20035/13/20035/13/2003PPART
DetailsCarl Dependahl
dave ; Phone #: ###-#### Internet Inspection Request from: Annette Moore...wip, shaft. 5/14/2003 9:58:35 AM
BLD-Final5/9/20035/12/20035/12/2003ACANC
DetailsCarl Dependahl
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/12/20035/12/20035/12/2003PPART
DetailsCarl Dependahl
shaft over hood ok...duct by 350 5/12/2003 4:05:12 PM
BLD-Conference4/16/20034/16/20034/16/2003PPART
DetailsCarl Dependahl
Shaft...wip, ok to "3 side" shaft for duct insp by Mechanical insp 4/16/2003 2:03:35 PM
BLD-Framing/Rough-in4/15/20034/16/20034/16/2003APART
DetailsCarl Dependahl
###-#### walls ok, door moved for 18" clr (ADA). 4/16/2003 12:20:02 PM
BLD-Conference4/11/20034/14/20034/14/2003APASS
DetailsCarl Dependahl
dave @ devcon...shaft & framing; ###-####; add 18" clr at pull side door at lower level, verify 18" clr to combustibles for hood add drywall as needed...ok to continue, obtain all trade & fire insps prior to frame insp. 4/14/2003 11:40:17 AM
BLD-Aging Inspection3/18/20033/18/20033/18/2003 PASS
DetailsCarl Dependahl
met workmen onsite advised to call for insps as req'd 3/18/2003 9:19:56 AM