BLD-Final | 9/24/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Carl Dependahl
|
|
|
Try late in the afternoon and let me know if you are successful in learning anything about the door issue. Thanks!!...doors installed, final ok 9/25/2002 4:47:41 PM
|
Permanent Occupancy | | 9/25/2002 | 9/25/2002 | | DONE |
|
|
|
|
Permanent Occupancy | | 9/25/2002 | 9/25/2002 | | DONE |
|
|
|
|
BLD-Conference | 9/12/2002 | 9/18/2002 | 9/18/2002 | P | PASS |
Carl Dependahl
|
|
|
w/ Cathy W...will call Benneton Const re final. 9/18/2002 1:35:18 PM
|
BLD-Conference | 9/10/2002 | 9/17/2002 | 9/17/2002 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Conference | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | PART |
Carl Dependahl
|
|
|
w/ fire insp....need final?
|
BLD-Conference | 9/10/2002 | 9/12/2002 | 9/12/2002 | P | NH |
Carl Dependahl
|
|
|
|
BLD-Conference | 9/10/2002 | 9/12/2002 | 9/12/2002 | P | NH |
Carl Dependahl
|
|
|
|
BLD-Conference | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | NH |
Carl Dependahl
|
|
|
unable to contact 9/12/2002 1:31:07 PM
|
BLD-Conference | 8/29/2002 | 9/3/2002 | 9/6/2002 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Conference | 8/27/2002 | 8/28/2002 | 8/29/2002 | P | NR |
Carl Dependahl
|
|
|
For t/o review
|
BLD-Final | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | NR |
Carl Dependahl
|
|
|
left msg. 8/27/2002 5:27:15 PM
|
BLD-Conference | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Carl Dependahl
|
|
|
re exist rated door at 2nd fl. kee 5/13/2002 2:53:12 PM c/n, need latching at 2nd fl occ sep wall 5/13/2002 2:56:58 PM
|
BLD-Final | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 12:08:10. Contact: ###-####.
|
FIRE-Final Inspection | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 12:07:27. Contact: ###-####. one bulb on emergency light on second floor not working; rated door on second floor has hold open; both to be fixed for structural inspection 5/13/2002 8:49:11 AM
|
BLD-Conference | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | DONE |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/06/2002 at 13:43:40. Contact: ###-####.
conf by 340 5/7/2002 2:16:18 PM
|
BLD-Conference | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | CANC |
Tony Young
|
|
|
5/7/2002 11:34:20 AM
|
BLD-Conference | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | PASS |
Carl Dependahl
|
|
|
w/ Fire & arch onsite re exit doors.
|
BLD-Framing/Rough-in | 4/8/2002 | 4/9/2002 | 4/9/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 12:35:23. Contact: ###-####. ok to cover, c/n ok...install rails & doors as needed per plan 4/9/2002 1:25:32 PM
|
FIRE-Conference | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 4/9/2002 9:14:14 AM met with Cheryl of Erstad and went through the plans for exit signs; emergency lights; door hardware and kitchen requirements; basement sprinklers are overspaced and several areas unprotected; called Jsson about it and he said the exiting was based on full sprinklers from the basement; called Cheryl and told her the basement will have to be fully sprinklered 4/9/2002 3:33:28 PM
|
BLD-Conference | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/8/2002 4:17:51 PM w/ arch re c/n...consult fire insp re door hdwe.
|
BLD-Framing/Rough-in | 4/4/2002 | 4/8/2002 | 4/8/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 15:50:12. Contact: ###-####.complete fireblocks, remove face paper & un-backed 1/4" panelling 4/8/2002 11:28:11 AM
|