BLD-Final | 6/23/2004 | 6/28/2004 | 6/28/2004 | P | PASS |
Tom Arcoraci
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 6/28/2004 2:20:18 PM
|
FIRE-Final Inspection | 6/17/2004 | 6/17/2004 | 6/17/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled.
|
BLD-Aging Inspection | 5/10/2004 | 5/10/2004 | 5/10/2004 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/9/2004 | 3/9/2004 | 3/9/2004 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/8/2004 | 1/8/2004 | 1/8/2004 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/3/2003 | 11/3/2003 | 11/3/2003 | | PASS |
Tom Arcoraci
|
|
|
wip ok 11/3/2003 8:22:14 AM
|
FIRE-Conference | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | DONE |
Troy Cobbley
|
|
|
jim ###-#### Went over alarm audibility issues with the engineer. They do have to meet all requirements of the code. The sprinkler contractor can use the 2002 NFPA 13 earthquaking requirements for the installations on this project 9/2/2003 9:45:25 AM
|
FIRE-Conference | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | DONE |
Troy Cobbley
|
|
|
jim ###-#### Went over alarm audibility issues with the engineer. They do have to meet all requirements of the code. The sprinkler contractor can use the 2002 NFPA 13 earthquaking requirements for the installations on this project 9/2/2003 9:45:25 AM
|
BLD-Framing/Rough-in | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 8:52:40 AM. Contact: ###-####. wip ok 7/8/2003 8:58:10 AM
|
FIRE-Final Inspection | 5/13/2003 | 5/20/2003 | 5/20/2003 | P | PART |
Troy Cobbley
|
|
|
See approved fire sprinkler plans for areas where occupancy is allowed 5/20/2003 4:28:27 PM
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PART |
Tom Arcoraci
|
|
|
JIM CELING GRID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Code Occupancy Approval | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | DONE |
Scott M.Brown
|
|
|
LOOKS OK FINAL SIGNED OFF. 4/14/2003 1:11:47 PM
|
Code Occupancy Approval | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | DONE |
Scott M.Brown
|
|
|
LOOKS OK FINAL SIGNED OFF. 4/14/2003 1:11:47 PM
|
Permanent Occupancy | | 4/14/2003 | 4/14/2003 | | DONE |
|
|
|
|
BLD-Final | 4/10/2003 | 4/11/2003 | 4/11/2003 | P | CANC |
Tom Arcoraci
|
|
|
###-####
|
FIRE-Final Inspection | 2/24/2003 | 2/25/2003 | 2/25/2003 | A | PART |
Troy Cobbley
|
|
|
JIM; Phone #: ###-#### Front lobby area and corridor area ok for perm occupancy. See approved alarm plans for exact location with todays date 2/25/2003 11:29:13 AM
|
BLD-Framing/Rough-in | 2/18/2003 | 2/19/2003 | 2/19/2003 | A | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung wip ok
2/19/2003 9:22:04 AM
|
FIRE-Final Inspection | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PART |
Troy Cobbley
|
|
|
###-#### Plate making room is OK to occupy. Battery in the emergency light will be verified on the next inspection 2/13/2003 1:17:05 PM
|
BLD-Framing/Rough-in | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | PART |
Russ Owen
|
|
|
###-#### jim Grid ceiling upper floor rm 222. 2/7/2003 1:16:39 PM
|
BLD-Framing/Rough-in | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | PART |
Russ Owen
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie front entry ok to ceiling. 2/4/2003 11:36:53 AM
|
BLD-Framing/Rough-in | 1/6/2003 | 1/7/2003 | 1/7/2003 | A | PART |
Tom Arcoraci
|
|
|
###-#### 1st floor corridor wip ok 2nd floor area e ok to occ 1/7/2003 9:43:17 AM
|
BLD-Framing/Rough-in | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PART |
Tom Arcoraci
|
|
|
ceiling grid ###-#### jim
|
FIRE-Final Inspection | 12/12/2002 | 12/13/2002 | 12/13/2002 | A | PART |
Troy Cobbley
|
|
|
see the city approved fire alarm plans for the areas that are dated with todays date that are ok to occupy for this phase of the project 12/13/2002 8:27:02 AM
|
BLD-Conference | 12/4/2002 | 12/4/2002 | 12/4/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### bathroom door may need to be 3 0 12/4/2002 4:00:57 PM
|
BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | PART |
Russ Owen
|
|
|
###-#### ceilings in portion of structure inspection areas noted in job trailer. 11/22/2002 12:31:03 PM
|
BLD-Framing/Rough-in | 11/13/2002 | 11/13/2002 | 11/13/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### He needs Tom A. wip ok 11/13/2002 4:49:27 PM
|
BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 | P | PART |
Jim Sly
|
|
|
###-#### jim 2nd floor frame...less restrooms...OK Need Plumb R/I approval on restrooms. OK to lid at elevator room. Need appr on deletion of walls at copy machines (center 2nd flr) and wing wall at SW stairway. 11/7/2002 3:33:28 PM 11/7/2002 3:36:01 PM
|
BLD-Framing/Rough-in | 10/24/2002 | 10/25/2002 | 10/25/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 08:34:05. Contact: . wip ok 10/28/2002 1:50:06 PM
|
BLD-Framing/Rough-in | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 08:54:36. Contact: . sec a 1st floor ok 10/22/2002 2:31:48 PM
|
BLD-Conference | 9/11/2002 | 9/11/2002 | 9/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Darla Downs will use shaft wall for corr lid 9/11/2002 1:42:50 PM
|
BLD-Framing/Rough-in | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PART |
Russ Owen
|
|
|
JIM CELING; Phone #: ###-#### Internet Inspection Request from: Darla DownsOk at single story addition. 9/6/2002 11:38:00 AM
|
FIRE-Conference | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | NR |
Troy Cobbley
|
|
|
No approved plans on site and it doesn't appear the plans have even been submitted 8/30/2002 12:30:42 PM
|
BLD-Conference | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### jim need resub for corridor construction 8/26/2002 2:29:51 PM
|
BLD-Framing/Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 | P | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### wip 8/22/2002 11:11:41 AM
|
FIRE-Conference | 8/20/2002 | 8/21/2002 | 8/21/2002 | P | DONE |
Troy Cobbley
|
|
|
I spoke with the contractor about phasing of the project will need the approval of the fire dept 8/21/2002 3:09:12 PM
|
BLD-Framing/Rough-in | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### JIM wip ok 8/7/2002 10:55:01 AM
|
BLD-Framing/Rough-in | 7/31/2002 | 8/1/2002 | 8/1/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### JIM ok to cover ext walls of new southern addition 8/1/2002 9:41:46 AM
|
BLD-Framing/Rough-in | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover ext of new bld 7/25/2002 9:31:55 AM
|
BLD-Conference | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### 2 HR WALLS AT WINDOWS IN CORNER 6/25/2002 2:23:20 PM
|
BLD-Foundation | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Foundation | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | DONE |
Tom Arcoraci
|
|
|
###-#### jim
|
BLD-Foundation | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PART |
Tom Arcoraci
|
|
|
rebar jim ###-#### footing ok 6/14/2002 9:44:24 AM
|
BLD-Footing | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PART |
Tom Arcoraci
|
|
|
JIM ###-#### 6/12/2002 11:34:08 AM ft north south and int fts 6/12/2002 11:35:05 AM
|
BLD-Footing | 6/11/2002 | 6/12/2002 | 6/12/2002 | P | CANC |
Tom Arcoraci
|
|
|
JIM ###-####
|
BLD-Conference | 6/4/2002 | 6/6/2002 | 6/6/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 6/4/2002 10:55:29 AM 1 pm meeting with jason from hummel arch at site job shack waiting for resubmittal 6/6/2002 2:04:25 PM
|
BLD-Conference | 6/3/2002 | 6/5/2002 | 6/5/2002 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 6/3/2002 4:23:40 PM
|
BLD-Conference | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | FAIL |
Russ Owen
|
|
|
###-####. needs plumbing and , c/n for sink. 5/28/2002 2:23:41 PM
|