Permit Information
Permit NumberBLD02-00370
StatusFinaled
Name CIVIC PLAZA PA-2 APARTMENTS
Site Address 252 E FRONT ST
Project NameID WATER CENTER-PA2 BLDG A
Customer Number 
ePlanReviewNo
Description
Civic Plaza Apartments PA-2 * (Section 1 of 6) * To construct two four-hour area separation walls to divide this building into six separate buildings. This section is 5 stories and 25 units, @ 3,869 sq.ft. per floor, above a three-hour occupancy separation per UBC Section 311.2.2.1. NOTE: This building is fully fire sprinklered for story increase. All construction per the aproved plans, attached comment list and CABO/ANSI A117.9-1992. PC#112-02 DRH01-00186 CUP01-00120 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20045/11/20045/11/2004APASS
DetailsDave Hannah
Permanent Occupancy 5/11/20045/11/2004 DONE
Details
BLD-Final4/6/20044/7/20044/7/2004PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/6/2004 at 10:44:56 AM. Contact: ###-####.
BLD-Final2/24/20042/25/20042/25/2004APART
DetailsDave Hannah
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for temp occ 2/25/2004 12:36:25 PM
FIRE-Final Inspection2/24/20042/25/20042/25/2004APASS
DetailsRick Jackson
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Final2/23/20042/24/20042/24/2004PNR
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final2/20/20042/23/20042/23/2004AFAIL
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Code Occupancy Approval  2/23/2004 PASS
BLD-Final2/19/20042/20/20042/20/2004AFAIL
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Final2/17/20042/18/20042/18/2004ANR
DetailsDave Hannah
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIRE-Final Inspection2/17/20042/18/20042/18/2004AFAIL
DetailsRick Jackson
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore need signs on FACP and sprinkler room doors; signs in stairwells; extinguishers in lobby and fire pump room; lobby doors can't locked to trap people in lobby area; need extinguishers in penthouse rooms and on all floors; need smoke seals on all rated doors and they must latch; need to verify emergency lighting in corridors; stairwells and exit systems must be free of construction materials; update keys in knox box; complete elevator recall/shunt and sign-off 2/18/2004 3:42:45 PM 2/18/2004 3:45:21 PM
BLD-Final2/9/20042/9/20042/9/2004PNR
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in2/4/20042/4/20042/4/2004PPART
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in1/30/20041/30/20041/30/2004PDONE
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Conference1/28/20041/29/20041/29/2004ADONE
DetailsDave Hannah
PETE ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Conference1/28/20041/29/20041/29/2004ADONE
DetailsDave Hannah
PETE ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in1/27/20041/27/20041/27/2004PDONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/26/20041/26/20041/26/2004PDONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in1/22/20041/23/20041/23/2004ADONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/23/20041/23/20041/23/2004PDONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/16/20041/20/20041/20/2004APART
DetailsDave Hannah
PETE ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in1/7/20041/7/20041/7/2004PPART
DetailsDave Hannah
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in12/31/20031/5/20041/5/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/31/2003 at 3:53:45 PM.
BLD-Framing/Rough-in12/29/200312/31/200312/31/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/29/2003 at 3:08:18 PM.
BLD-Framing/Rough-in12/23/200312/24/200312/24/2003APART
DetailsDave Hannah
mcalvain construction; Phone #: ###-#### Internet Inspection Request from: Barbara Moore repares on shafts 12/24/2003 9:29:37 AM
BLD-Framing/Rough-in12/22/200312/22/200312/22/2003PDONE
DetailsDave Hannah
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in12/18/200312/19/200312/19/2003ACANC
DetailsDave Hannah
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughesout of time rescheduled for pm 12/19/2003 11:55:16 AM
BLD-Framing/Rough-in12/19/200312/19/200312/19/2003PPART
DetailsDave Hannah
Pete; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes main level evevator lobby ok to hang lids 12/19/2003 2:33:14 PM
BLD-Framing/Rough-in12/17/200312/18/200312/18/2003ACANC
DetailsDave Hannah
12/18/2003 11:08:12 AM
BLD-Framing/Rough-in12/18/200312/18/200312/18/2003PNR
DetailsDave Hannah
BLD-Framing/Rough-in12/15/200312/16/200312/16/2003ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/12/2003 at 9:43:04 AM.
BLD-Framing/Rough-in12/16/200312/16/200312/16/2003PDONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in12/12/200312/15/200312/15/2003PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/12/2003 at 9:43:04 AM.
BLD-Framing/Rough-in12/12/200312/12/200312/12/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/12/2003 at 9:42:23 AM. sec floor ok to cover 12/12/2003 4:52:15 PM
BLD-Framing/Rough-in12/8/200312/9/200312/9/2003PDONE
DetailsDave Hannah
Frank; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in12/5/200312/5/200312/5/2003PPART
DetailsDave Hannah
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in12/3/200312/3/200312/3/2003PDONE
DetailsDave Hannah
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in12/1/200312/1/200312/1/2003PFAIL
DetailsDave Hannah
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in11/20/200311/21/200311/21/2003APART
DetailsDave Hannah
Randy Internet Inspection Request from: Aimee Hughes 6th floor ok to cover 11/21/2003 11:47:33 AM
BLD-Framing/Rough-in11/20/200311/20/200311/20/2003PNR
DetailsDave Hannah
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in11/17/200311/18/200311/18/2003ACANC
DetailsDave Hannah
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/18/200311/18/200311/18/2003PPART
DetailsDave Hannah
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 6th floor ok to cover 11/18/2003 2:46:02 PM
BLD-Framing/Rough-in11/17/200311/17/200311/17/2003PPART
DetailsDave Hannah
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/10/200311/14/200311/14/2003PCANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in11/10/200311/13/200311/13/2003PCANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 11/13/2003 4:42:09 PM
BLD-Framing/Rough-in11/10/200311/12/200311/12/2003PPART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore 5th floor sheetrock shear first layer ok 11/12/2003 4:05:30 PM
BLD-Framing/Rough-in11/3/200311/7/200311/7/2003PPART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie sheetrock shear fail 5th floor also areas inside med cabint fail needs fire proofing 11/7/2003 2:38:33 PM
BLD-Framing/Rough-in11/3/200311/6/200311/6/2003PCANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/3/200311/5/200311/5/2003PPART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 6th floor 11/5/2003 2:16:20 PM
BLD-Framing/Rough-in11/3/200311/4/200311/4/2003PCANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/3/200311/3/200311/3/2003PPART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie sixth floor 11/3/2003 2:35:39 PM
BLD-Framing/Rough-in10/28/200310/31/200310/31/2003PCANC
DetailsDave Hannah
###-#### Pete
BLD-Framing/Rough-in10/28/200310/30/200310/30/2003PCANC
DetailsDave Hannah
###-#### Pete
BLD-Framing/Rough-in10/28/200310/29/200310/29/2003PNR
DetailsDave Hannah
###-####
BLD-Framing/Rough-in10/28/200310/28/200310/28/2003PDONE
DetailsDave Hannah
pete ###-####
BLD-Framing/Rough-in10/17/200310/23/200310/23/2003PPART
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore 5th floor 10/24/2003 8:10:27 AM
BLD-Framing/Rough-in10/17/200310/22/200310/22/2003PCANC
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in10/17/200310/21/200310/21/2003PPART
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore see petes notes 10/21/2003 4:26:18 PM
BLD-Framing/Rough-in10/17/200310/20/200310/20/2003PNR
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in10/14/200310/17/200310/17/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/14/2003 at 1:37:09 PM. see petes log 10/20/2003 8:32:36 AM
BLD-Framing/Rough-in10/14/200310/16/200310/16/2003PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/14/2003 at 1:36:26 PM.
BLD-Framing/Rough-in10/14/200310/15/200310/15/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/14/2003 at 1:35:46 PM.
BLD-Framing/Rough-in10/9/200310/15/200310/15/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time 10/15/2003 12:38:58 PM
BLD-Framing/Rough-in10/9/200310/14/200310/14/2003ADONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in10/9/200310/13/200310/13/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in10/13/200310/13/200310/13/2003PDONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in10/9/200310/10/200310/10/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time 10/10/2003 1:58:37 PM
BLD-Framing/Rough-in10/2/200310/9/200310/9/2003APART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore4th floor 10/9/2003 10:24:34 AM
BLD-Framing/Rough-in10/2/200310/8/200310/8/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 10/8/2003 4:33:22 PM
BLD-Framing/Rough-in10/7/200310/7/200310/7/2003PPART
DetailsDave Hannah
BLD-Framing/Rough-in10/2/200310/7/200310/7/2003ACANC
DetailsDave Hannah
out of time rescheduled for pm 10/7/2003 11:00:18 AM
BLD-Framing/Rough-in9/29/200310/1/200310/1/2003PPART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in9/29/20039/30/20039/30/2003ADONE
DetailsDave Hannah
BLD-Framing/Rough-in9/25/20039/30/20039/30/2003PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/25/2003 at 1:46:38 PM.
BLD-Framing/Rough-in9/25/20039/29/20039/29/2003PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/25/2003 at 1:45:54 PM. out of time 9/30/2003 11:24:17 AM
BLD-Framing/Rough-in9/25/20039/26/20039/26/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/25/2003 at 1:45:13 PM.
BLD-Framing/Rough-in9/18/20039/25/20039/25/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time 9/25/2003 1:38:59 PM
BLD-Framing/Rough-in9/25/20039/25/20039/25/2003PDONE
DetailsDave Hannah
BLD-Framing/Rough-in9/24/20039/24/20039/24/2003PPART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs third floor rooms 9/24/2003 3:36:43 PM
BLD-Framing/Rough-in9/18/20039/24/20039/24/2003ADONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/18/20039/23/20039/23/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/18/20039/22/20039/22/2003APART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/22/20039/22/20039/22/2003PCANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/18/20039/19/20039/19/2003PDONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/15/20039/19/20039/19/2003ADONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/15/20039/18/20039/18/2003ADONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/18/20039/18/20039/18/2003PDONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/17/20039/17/20039/17/2003PCANC
DetailsDave Hannah
out of time 9/17/2003 4:31:42 PM
BLD-Framing/Rough-in9/15/20039/17/20039/17/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time am rescheduled for pm 9/17/2003 11:27:05 AM
BLD-Framing/Rough-in9/15/20039/16/20039/16/2003APART
DetailsDave Hannah
PETE; Phone #: ###-#### Internet Inspection Request from: Marc Lileks floors 2,3&4 north face shear ext ok to cover 9/16/2003 2:50:26 PM
BLD-Framing/Rough-in9/11/20039/12/20039/12/2003PDONE
DetailsDave Hannah
DENNIS; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Framing/Rough-in9/10/20039/11/20039/11/2003PDONE
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in9/9/20039/10/20039/10/2003PDONE
DetailsDave Hannah
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/8/20039/9/20039/9/2003ACANC
DetailsDave Hannah
DENNIS; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Framing/Rough-in9/5/20039/8/20039/8/2003PPART
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Annette Moore 5th and 6th floor floor nailing 9/9/2003 8:02:14 AM
BLD-Framing/Rough-in9/5/20039/5/20039/5/2003PDONE
DetailsDave Hannah
BLD-Framing/Rough-in8/29/20039/5/20039/5/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in8/29/20039/4/20039/4/2003ADONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in8/29/20039/3/20039/3/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in8/29/20039/2/20039/2/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore out of time 9/2/2003 11:33:07 AM
BLD-Framing/Rough-in9/2/20039/2/20039/2/2003ACANC
DetailsDave Hannah
BLD-Framing/Rough-in9/2/20039/2/20039/2/2003PPART
DetailsDave Hannah
4th floor shear walls ok to cover 9/2/2003 3:39:20 PM
BLD-Framing/Rough-in8/29/20038/29/20038/29/2003PPART
DetailsDave Hannah
4th floor rooms 8/29/2003 7:12:28 PM
BLD-Framing/Rough-in8/29/20038/29/20038/29/2003PPART
DetailsDave Hannah
BLD-Framing/Rough-in8/27/20038/29/20038/29/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in8/27/20038/28/20038/28/2003APART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok third floor shear ok to cover 8/28/2003 12:29:32 PM
BLD-Framing/Rough-in8/22/20038/27/20038/27/2003APART
DetailsDave Hannah
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs level 2 shear walls ok to cover second sides 8/27/2003 11:12:10 AM
BLD-Framing/Rough-in8/22/20038/26/20038/26/2003ADONE
DetailsDave Hannah
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in8/22/20038/25/20038/25/2003APART
DetailsDave Hannah
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs walked rooms on second floor ok to cover some shear walls pete has list 8/25/2003 11:53:09 AM
BLD-Framing/Rough-in8/19/20038/22/20038/22/2003ACANC
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in8/22/20038/22/20038/22/2003PDONE
DetailsDave Hannah
BLD-Framing/Rough-in8/19/20038/21/20038/21/2003APART
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Conference8/19/20038/20/20038/20/2003ADONE
DetailsDave Hannah
walk project with carl
BLD-Framing/Rough-in8/19/20038/20/20038/20/2003ANR
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Annette Moore walk thru w/ Dave Hanna 8/20/2003 12:52:30 PM
BLD-Framing/Rough-in8/14/20038/19/20038/19/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/14/2003 at 12:43:30 PM. ...ok to cover 2nd fl corridor...shear wall & gyp. lid 8/19/2003 4:40:41 PM
BLD-Framing/Rough-in8/19/20038/19/20038/19/2003PPART
DetailsCarl Dependahl
2nd fl corridor...lid ok to cover, except at "chases" open to framing above 8/19/2003 5:28:36 PM
BLD-Framing/Rough-in8/14/20038/18/20038/18/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/14/2003 at 12:42:50 PM.
BLD-Framing/Rough-in8/14/20038/15/20038/15/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/14/2003 at 12:42:13 PM. ...awaiting detail for firestops at chases & voids. 8/18/2003 12:02:43 PM
BLD-Framing/Rough-in8/14/20038/14/20038/14/2003PPART
DetailsCarl Dependahl
2nd fl corridor lids ok to begin cover, need all sprinkler r/i's 8/15/2003 7:00:25 AM
BLD-Framing/Rough-in8/11/20038/14/20038/14/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/11/2003 at 2:00:09 PM. ...gypcrete, wip 4th fl. 8/14/2003 6:17:47 PM
BLD-Framing/Rough-in8/11/20038/13/20038/14/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/11/2003 at 1:59:29 PM. ....gypcrete in progress....WIP. 8/14/2003 4:04:10 PM
BLD-Conference8/13/20038/13/20038/13/2003PPASS
DetailsCarl Dependahl
need firestop assys for chases & pipes/wires, etc. 8/13/2003 5:19:15 PM
BLD-Framing/Rough-in8/13/20038/13/20038/13/2003PPART
DetailsCarl Dependahl
4th fl ok for gypcrete 8/13/2003 5:19:40 PM
BLD-Framing/Rough-in8/11/20038/12/20038/12/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/11/2003 at 1:58:51 PM. ...ok to sheath inside of ext wall at west & south, 2nd fl. 8/12/2003 9:50:48 PM
BLD-Framing/Rough-in8/12/20038/12/20038/12/2003PPART
DetailsCarl Dependahl
ok to install vapor barrier & sheathing, east & north walls, 2nd floor. 8/12/2003 9:51:56 PM
BLD-Framing/Rough-in8/6/20038/8/20038/8/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/6/2003 at 2:54:05 PM. ...HD rods ok at all of 2nd floor ( "stud packs" per plan), 3rd floor nailing appears ok, blocked diaphragm installed...eng's ok for plbg blockouts at that area pending; ok for gypcrete at 3rd fl. 8/11/2003 8:04:02 AM
BLD-Framing/Rough-in8/8/20038/8/20038/8/2003PPART
DetailsCarl Dependahl
2nd, 8/8/2003 4:51:15 PM
BLD-Conference8/6/20038/7/20038/7/2003PPASS
DetailsCarl Dependahl
BLD-Framing/Rough-in8/7/20038/7/20038/7/2003PPART
DetailsCarl Dependahl
verifying hd's...wip 8/7/2003 5:05:53 PM
BLD-Framing/Rough-in8/6/20038/7/20038/7/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/6/2003 at 2:53:22 PM.
BLD-Framing/Rough-in8/4/20038/6/20038/6/2003ACANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/4/2003 at 9:43:49 AM.
BLD-Framing/Rough-in8/6/20038/6/20038/6/2003PPART
DetailsCarl Dependahl
ext nailing, east , west side ok, 8/7/2003 11:59:03 AM
BLD-Framing/Rough-in8/4/20038/5/20038/5/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/4/2003 at 9:43:01 AM. ...ok to insul ext wall, west side 2nd fl...complete draft stops of rod penetrations 8/5/2003 5:03:20 PM
BLD-Framing/Rough-in8/5/20038/5/20038/5/2003PPART
DetailsCarl Dependahl
ext wall 2nd fl ok to insulate at south side...draft stop rods, fix shearwalls 8/5/2003 5:10:28 PM
BLD-Framing/Rough-in8/4/20038/4/20038/4/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/4/2003 at 9:42:16 AM. ...make corrections per c/n & eng's recommendation 8/4/2003 4:43:23 PM
BLD-Framing/Rough-in7/30/20038/1/20038/1/2003AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/30/2003 at 9:22:20 AM.
BLD-Framing/Rough-in7/30/20037/31/20037/31/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/30/2003 at 9:21:28 AM. ...keep cn, wip 8/1/2003 9:21:08 AM
BLD-Framing/Rough-in7/28/20037/30/20037/30/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/28/2003 at 8:50:00 AM. ...rec'd detail for resilient channel...ok at 24" oc, wall or lid w/ 5/8" x gypsum...1layer for 1hr. 7/30/2003 5:46:58 PM
BLD-Framing/Rough-in7/28/20037/29/20037/29/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/28/2003 at 8:49:12 AM.
BLD-Framing/Rough-in7/29/20037/29/20037/29/2003PPART
DetailsCarl Dependahl
BLD-Conference7/25/20037/28/20037/28/2003APART
DetailsCarl Dependahl
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows carl out of time fri. rolled this over for monday. 301..ok, awaiting eng's call for shear walls, !HR CONST IS REQ'D 7/28/2003 11:34:43 AM
BLD-Framing/Rough-in7/28/20037/28/20037/28/2003PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/28/2003 at 8:48:23 AM. ...reviewed proposal for p-traps: fill under tub w/ gyp-crete & firestop ABS pipe penetration at floor line from bottom per listing & T-7-C UBC. 7/29/2003 1:47:08 PM
BLD-Framing/Rough-in7/28/20037/28/20037/28/2003PCANC
DetailsCarl Dependahl
###-####
BLD-Framing/Rough-in7/21/20037/25/20037/25/2003ACANC
DetailsJim Storey
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows out of time 301 rolled over to monday. 7/25/2003 2:45:59 PM
BLD-Framing/Rough-in7/21/20037/24/20037/24/2003ANR
DetailsCarl Dependahl
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...NEED ENG'S "FIX" for shear walls cut. 7/28/2003 11:35:34 AM
BLD-Framing/Rough-in7/21/20037/23/20037/23/2003ANR
DetailsCarl Dependahl
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellowsneed resolve shear walls, gyp behind tubs. 7/23/2003 10:50:42 PM
BLD-Framing/Rough-in7/21/20037/22/20037/22/2003APART
DetailsCarl Dependahl
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...keep c/ns...need fix shear walls cut for plbg; met e/ arch & owner rep, discussed fire assys req'd at p-traps, voids, etc... 7/22/2003 3:20:13 PM
BLD-Framing/Rough-in7/21/20037/21/20037/21/2003PPART
DetailsCarl Dependahl
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...walls ...wip, ok. 7/22/2003 9:20:22 AM
BLD-Framing/Rough-in7/16/20037/18/20037/18/2003PCANC
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in7/16/20037/17/20037/17/2003PPART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, 4hr wall...ok. 7/18/2003 4:39:47 PM
BLD-Framing/Rough-in7/16/20037/16/20037/16/2003PPART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, complete eng's fixes for shear walls, told plbr to add straps & stud shoes as needed. 7/16/2003 4:55:15 PM
BLD-Conference7/10/20037/10/20037/10/2003PPASS
DetailsCarl Dependahl
w/ bldr...need resolve generator issues 7/10/2003 6:53:14 PM
BLD-Framing/Rough-in7/3/20037/10/20037/10/2003AFAIL
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...c/n re generator at retail level, make prior corrections 7/10/2003 6:36:21 PM
BLD-Framing/Rough-in7/9/20037/9/20037/9/2003PNR
DetailsCarl Dependahl
BLD-Framing/Rough-in7/3/20037/9/20037/9/2003ACANC
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in7/3/20037/8/20037/8/2003APART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...met eng'r & arch onsite...awaiting details for shear wall perforations 7/8/2003 12:16:05 PM
BLD-Framing/Rough-in7/3/20037/7/20037/7/2003APART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in6/27/20037/2/20037/2/2003ACANC
DetailsCarl Dependahl
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in6/27/20037/1/20037/1/2003AFAIL
DetailsCarl Dependahl
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need to complete bolting, firestops, 1hr assys at concealed spaces; eng'r to advise re shear wall penetrations. 7/1/2003 5:30:30 PM
BLD-Framing/Rough-in6/27/20036/30/20036/30/2003APART
DetailsCarl Dependahl
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downs....wip, need eng's fixes completed at studs/sills/ plates notched, etc. 6/30/2003 1:05:07 PM
BLD-Framing/Rough-in6/23/20036/27/20036/27/2003APART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr wall wip. 6/27/2003 6:36:26 PM
BLD-Framing/Rough-in6/23/20036/26/20036/26/2003APART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walk thru w/ arch...resolve plbg issues (holes notches, etc.) need eng's detail re shearwall penetrations. 6/26/2003 5:32:26 PM
BLD-Framing/Rough-in6/23/20036/25/20036/25/2003APART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore conf. only w/ arch 6/25/2003 10:49:20 AM
BLD-Framing/Rough-in6/23/20036/24/20036/24/2003APART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...need clarify r.c. furring spacing & elev shaft beam & floor line details... 6/24/2003 12:04:48 PM
BLD-Framing/Rough-in6/23/20036/23/20036/23/2003PCANC
DetailsJim Storey
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in6/16/20036/20/20036/20/2003PPART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr wall, wip...ok 6/20/2003 4:15:08 PM
BLD-Framing/Rough-in6/18/20036/19/20036/19/2003APART
DetailsCarl Dependahl
Bob, ISI...wip 4hr wall 6/19/2003 11:14:05 AM
BLD-Framing/Rough-in6/16/20036/19/20036/19/2003PPART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walk thru...c/n issued: firestops, straps, etc....make all eng's corrections 6/19/2003 3:50:46 PM
BLD-Framing/Rough-in6/16/20036/18/20036/18/2003PPART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall, wip, keep c/n 6/19/2003 11:19:04 AM
BLD-Framing/Rough-in6/16/20036/17/20036/17/2003PPART
DetailsCarl Dependahl
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; 4hr wall wip. continue wall thru 4th level at corridor. 6/17/2003 3:26:44 PM
BLD-Framing/Rough-in6/16/20036/16/20036/16/2003PDONE
DetailsDave Hannah
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in6/4/20036/6/20036/6/2003ADONE
DetailsDave Hannah
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in6/4/20036/5/20036/5/2003ACANC
DetailsCarl Dependahl
Randy
BLD-Framing/Rough-in6/5/20036/5/20036/5/2003PPART
DetailsCarl Dependahl
4hr wall wip ok...add therma fiber batts per detail...GA file wp2964, show photo at 4th fl. 6/5/2003 4:20:54 PM
BLD-Framing/Rough-in6/4/20036/5/20036/5/2003APART
DetailsCarl Dependahl
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in6/4/20036/4/20036/4/2003PPART
DetailsCarl Dependahl
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need shaft wall resubmittal clarification, 4hr wall ok to continue per GA WP2649 6/5/2003 5:01:23 PM
BLD-Framing/Rough-in5/30/20036/2/20036/2/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; walk through w/ eng'r & arch....need details for shear membrane penetrations...replace bolts at steel post/beam connection to A490; still need shaft alternate detail. 6/2/2003 1:16:56 PM
BLD-Framing/Rough-in5/27/20035/30/20035/30/2003ANR
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/30/20035/30/20035/30/2003PPART
DetailsCarl Dependahl
4hr wall wip; keep c/n re shaft resubmittal, etc. 6/2/2003 9:28:04 AM
BLD-Framing/Rough-in5/27/20035/29/20035/29/2003ANR
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...conf only w/ JP Caspers; eng'r to make site visit asap. 5/30/2003 7:26:19 AM
BLD-Framing/Rough-in5/27/20035/28/20035/28/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip, 4hr wall ok 5/28/2003 12:19:56 PM
BLD-Framing/Rough-in5/23/20035/27/20035/27/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/23/2003 at 1:16:30 PM. Contact: ###-####....4hr walls, wip; need shaft alt. detail 5/27/2003 12:12:48 PM
BLD-Framing/Rough-in5/27/20035/27/20035/27/2003ACANC
DetailsCarl Dependahl
BLD-Framing/Rough-in5/27/20035/27/20035/27/2003PPART
DetailsCarl Dependahl
4hr wall, wip....ok 5/27/2003 5:12:33 PM
BLD-Framing/Rough-in5/19/20035/23/20035/23/2003ACANC
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, 5/27/2003 5:11:57 PM
BLD-Framing/Rough-in5/19/20035/22/20035/22/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall, wip ok. 5/22/2003 12:18:47 PM to 3rd level 5/22/2003 12:19:00 PM
BLD-Framing/Rough-in5/19/20035/22/20035/22/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall, wip ok. 5/22/2003 12:18:47 PM to 3rd level 5/22/2003 12:19:00 PM
BLD-Framing/Rough-in5/19/20035/22/20035/22/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall, wip ok. 5/22/2003 12:18:47 PM to 3rd level 5/22/2003 12:19:00 PM
BLD-Framing/Rough-in5/19/20035/21/20035/21/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...east portion firewall thru 3rd fl...wip ok 5/21/2003 4:22:56 PM
BLD-Framing/Rough-in5/20/20035/20/20035/20/2003PPART
DetailsCarl Dependahl
Randy, prelim only... wip 5/20/2003 5:01:14 PM
BLD-Framing/Rough-in5/19/20035/20/20035/20/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...wip prelim only. C/n issued re shear wall openings. 5/20/2003 1:12:40 PM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/16/2003 at 1:31:56 PM. Contact: ###-####....4hr wall extension thru 2nd level corridor, WIp, ok. 5/20/2003 10:35:17 AM
BLD-Framing/Rough-in5/14/20035/16/20035/16/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...shaft wip, need alt detail for shafts...may be 1hr per T-6-A 5/16/2003 2:12:00 PM
BLD-Framing/Rough-in5/15/20035/16/20035/16/2003ACANC
DetailsCarl Dependahl
Randy
BLD-Framing/Rough-in5/16/20035/16/20035/16/2003PPART
DetailsCarl Dependahl
shafts...need struct sheathing at shear walls 1st...wip 5/16/2003 3:58:57 PM
BLD-Framing/Rough-in5/14/20035/15/20035/15/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...shaft wall, need shear panel installed 1st at ext walls...thru level 4. 5/16/2003 1:27:37 PM
BLD-Framing/Rough-in5/13/20035/14/20035/14/2003ACANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/13/2003 at 1:39:39 PM. Contact: ###-####.
BLD-Framing/Rough-in5/14/20035/14/20035/14/2003PPART
DetailsCarl Dependahl
need eng's review of SW penetrations...pipes, cols...WIP 5/14/2003 6:07:41 PM
BLD-Framing/Rough-in5/5/20035/9/20035/9/2003ACANC
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/9/20035/9/20035/9/2003PCANC
DetailsCarl Dependahl
BLD-Framing/Rough-in5/5/20035/8/20035/8/2003ACANC
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/5/20035/7/20035/7/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr walls, extend to/thru corridor 5/7/2003 4:07:49 PM
BLD-Framing/Rough-in5/5/20035/6/20035/6/2003APART
DetailsCarl Dependahl
4hr wall, 2nd layer 5/6/2003 3:49:29 PM
BLD-Framing/Rough-in5/5/20035/5/20035/5/2003ACANC
DetailsCarl Dependahl
BLD-Framing/Rough-in5/2/20035/2/20035/2/2003PPART
DetailsCarl Dependahl
prelim only, wip 5/5/2003 1:55:37 PM
BLD-Framing/Rough-in4/29/20035/2/20035/2/2003APART
DetailsCarl Dependahl
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs prelim only; wip.
5/2/2003 4:19:52 PM
BLD-Framing/Rough-in4/29/20035/1/20035/1/2003APART
DetailsCarl Dependahl
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs 4hr wall wip...need eng'r of records ok in writing for this framing 5/1/2003 2:55:18 PM
BLD-Framing/Rough-in4/29/20034/30/20034/30/2003APART
DetailsCarl Dependahl
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...framing 2nd level 4hr walls, wip ok 4/30/2003 5:44:29 PM
BLD-Framing/Rough-in4/30/20034/30/20034/30/2003PCANC
DetailsCarl Dependahl
BLD-Framing/Rough-in4/29/20034/29/20034/29/2003PPART
DetailsCarl Dependahl
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs..prelim only advised plbr, elec, framer, etc re 1hr firestop req's...need assy for firestops at chases 4/29/2003 5:29:32 PM
BLD-Framing/Rough-in4/21/20034/25/20034/25/2003ADONE
DetailsDave Hannah
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in4/21/20034/24/20034/24/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore 4hr wall, wip ok 4/24/2003 11:58:20 AM
BLD-Framing/Rough-in4/21/20034/23/20034/23/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore re 4hr wall, ok to use alternate 4hr GA manual system, framing ok if ok per eng'r of record. ok to continue at own risk..mineral wool (stud bay) installed at 3rd level east walls as per detail. 4/23/2003 5:03:57 PM
BLD-Framing/Rough-in4/21/20034/22/20034/22/2003ANR
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in4/22/20034/22/20034/22/2003PPART
DetailsCarl Dependahl
gyp, wip 4/22/2003 6:17:43 PM
BLD-Framing/Rough-in4/18/20034/21/20034/21/2003PPART
DetailsCarl Dependahl
rec'd revised engg'd framing for 4hr wall from ISI eng'r...req's stamp and arch's ok...WIP as eng'd 4/21/2003 11:04:56 AM
BLD-Framing/Rough-in4/21/20034/21/20034/21/2003PPART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore...4hr walls, wip; need 4/21/2003 4:26:35 PM
BLD-Conference4/17/20034/18/20034/18/2003PPASS
DetailsCarl Dependahl
awaiting arch's ok for eng'd 4hr wall... 4/18/2003 4:29:11 PM
BLD-Framing/Rough-in4/15/20034/15/20034/15/2003ACANC
DetailsCarl Dependahl
recall, can't access jobsite,pouring concrete. 4/15/2003 1:14:06 PM
BLD-Conference4/14/20034/14/20034/14/2003APART
DetailsCarl Dependahl
4hr wall... clarify framing detail ...keep c/n. 4/14/2003 11:42:24 AM
BLD-Conference3/25/20033/25/20033/25/2003PPASS
DetailsCarl Dependahl
met arch onsite 3/25/2003 5:42:41 PM