BLD-Final | 8/17/2002 | 8/19/2002 | 8/19/2002 | A | NH |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/17/2002 at 16:05:44. Contact: ###-####. C/N--No access 8/19/2002 10:53:21 AM
|
BLD-Final | 8/19/2002 | 8/19/2002 | 8/19/2002 | P | PASS |
Jim Storey
|
|
|
###-#### larry garage code 2200
|
BLD-Final | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | FAIL |
Jim Storey
|
|
|
LARRY ###-#### saftey glazing within 24 of door/ fire stop garage/ handrails must return to wall. 8/16/2002 2:59:15 PM
|
BLD-Final | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | CANC |
Jim Storey
|
|
|
###-#### nr mech failed and called to say do not go. 8/15/2002 2:22:50 PM
|
BLD-Energy code compliance | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 6/7/2002 | 6/7/2002 | 6/7/2002 | P | PASS |
Jim Storey
|
|
|
###-#### LARRY c/n made ok ok to insulate. 6/7/2002 4:15:16 PM
|
BLD-Framing/Rough-in | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | FAIL |
Jim Storey
|
|
|
1. need all sealants applied to top plates and sole plates be for framing insp.
2. holddowns for interior wall at back of kitchen for engineered sheer pannel need info.
3. need hanger at garage water heater header.
|
BLD-Framing/Rough-in | 5/29/2002 | 5/31/2002 | 5/31/2002 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 09:47:17. Contact: ###-####.
|
BLD-Footing | 4/4/2002 | 4/5/2002 | 4/5/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 17:29:04. Contact: ###-####.
|