DOC - Permit Finaled | | | 8/18/2003 | | DONE |
|
|
|
|
BLD-Final | 4/22/2002 | 4/22/2002 | 4/22/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 06:51:00. Contact: ###-####.Ok done issued letter of compliance. 4/22/2002 12:14:00 PM
|
BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/16/2002 at 17:13:44. Contact: ###-####. 4/17/2002 4:59:26 PM. Need to see the approve plans, to check wall and cabinet support. Called contractor. 4/17/2002 5:01:38 PM
|
BLD-Other | 4/3/2002 | 4/4/2002 | 4/4/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 15:41:05. Contact: ###-####.added top of wall wire supports to new framed walls. 4/5/2002 1:13:58 PM 4/5/2002 1:14:14 PM
|
BLD-Framing/Rough-in | 3/26/2002 | 3/27/2002 | 3/27/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 17:51:44. Contact: ###-####. Top of walls will need the support wires , talked with cont, said will be done soon and re-inspection called for. 3/27/2002 11:30:28 AM
|