BLD-Final | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### PETE
|
BLD-Final | 12/20/2002 | 12/23/2002 | 12/23/2002 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### pete handrails inside house do noy comply and needs egress window in basement per plan 12/23/2002 3:59:50 PM
|
BLD-Conference | 10/24/2002 | 10/25/2002 | 10/25/2002 | A | PASS |
|
|
|
###-#### pete please call 1st(handrails) Talked... Stairs Etc.
10/25/2002 10:42:14 AM 10/25/2002 10:42:59 AM
|
BLD-Energy code compliance | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PASS |
Jim Storey
|
|
|
c/n on trusses repaired and insulation ok for cover.
|
BLD-Final | 8/7/2002 | 8/8/2002 | 8/8/2002 | P | CANC |
Jim Storey
|
|
|
PETE ###-####
|
BLD-Framing/Rough-in | 8/6/2002 | 8/6/2002 | 8/6/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### pete air seal ok check framing corrections at ec insp 8/6/2002 4:00:48 PM
|
BLD-Framing/Rough-in | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### pete ###-#### pete bearing points for trusses east/ south end need engineering to justify/continous studs to bearing/ boise city engery code selants. 8/5/2002 4:49:57 PM
|
BLD-Foundation | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | PART |
Russ Owen
|
|
|
###-#### PETE. Work in progress. vertical epoxied, horz rebar under hds, note told them to adjust hds as nessasary for shear walls. Note: This is a foundation left from burned house, The project should have been required to have a structural engineer to reveiw, and detail design. IE: concrete strength and connections at caped areas, connection to existing etc. But this was not required and work is being done as directed by our plan review division. 4/25/2002 3:35:00 PM
|
BLD-Foundation | 4/24/2002 | 4/24/2002 | 4/24/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### Need to epoxy the rebar that is shown on the plans for existing to new concrete, also around the tall walls the plans show only 2 horiz bars and they have not been spaced appart the top bar is far from the top of wall,Due to the inadequate unscaled foundation plan designed by our office. Contractor and builder advised to correct these items. No c/n posted. 4/24/2002 3:59:38 PM
|
BLD-Foundation | 4/10/2002 | 4/12/2002 | 4/12/2002 | P | NR |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 4/10/2002 | 4/11/2002 | 4/11/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### pete wip 4/11/2002 2:11:05 PM
|