BLD-Final | 3/29/2004 | 3/30/2004 | 3/30/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/29/2004 at 6:01:24 PM. Contact: ###-####. ok for perm 3/30/2004 10:51:07 AM
|
FIRE-Final Inspection | 3/30/2004 | 3/30/2004 | 3/30/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
Permanent Occupancy | | 3/29/2004 | 3/29/2004 | | DONE |
|
|
|
|
BLD-Final | 3/25/2004 | 3/26/2004 | 3/26/2004 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/25/2004 at 7:45:28 AM. Contact: ###-####.
|
BLD-Final | 3/26/2004 | 3/26/2004 | 3/26/2004 | P | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 3/1/2004 | 3/2/2004 | 3/2/2004 | A | PART |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp 3/2/2004 10:55:47 AM
|
FIRE-Final Inspection | 3/1/2004 | 3/2/2004 | 3/2/2004 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers permission until the monitoring of the hose system tie in has been approved. All other life safety items are ok to be signed off when the fire alarm is complete 3/2/2004 10:56:17 AM
|
BLD-Final | 2/18/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Alarm Testing | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Troy Cobbley
|
|
|
|
FIRE-Final Inspection | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | CANC |
Troy Cobbley
|
|
|
ron ###-####
|
BLD-Final | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | NR |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Code Occupancy Approval Temp | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | DONE |
Scott M.Brown
|
|
|
BOND IN PLACE TEMP SIGNED OFF 2/9/2004 1:33:05 PM
|
BLD-Wall cover | 1/26/2004 | 1/27/2004 | 1/27/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 2:03:46 PM. Contact: ###-####.
|
Code Occupancy Approval Temp | | | 1/22/2004 | | PART |
|
|
|
NEEDS TO BOND FOR LANDSCAPE PER DRH01-000222 IN AMOUNT OF $23,555 THEN CAN SIGN TEMP. OCCUPANCY
|
FIRE-Final Inspection | 1/14/2004 | 1/14/2004 | 1/14/2004 | P | PART |
Troy Cobbley
|
|
|
Ceiling in room that shares the restrooms east wall is ok to cover 1/14/2004 2:08:38 PM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Tom Arcoraci
|
|
|
ok to cover pending ok on fire sprinklers 12/23/2003 8:50:47 AM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Tom Arcoraci
|
|
|
ok to cover pending ok on fire sprinklers 12/23/2003 8:50:47 AM
|
BLD-Framing/Rough-in | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Tom Arcoraci
|
|
|
ok to cover pending ok on fire sprinklers 12/23/2003 8:50:47 AM
|
BLD-Wall cover | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/22/2003 at 11:22:02 AM. Contact: ###-####. Out of time recalled. 12/22/2003 4:27:58 PM 12/22/2003 4:28:02 PM
|
BLD-Conference | 12/9/2003 | 12/9/2003 | 12/9/2003 | A | PASS |
Tom Arcoraci
|
|
|
wip ok 12/9/2003 9:56:29 AM
|
BLD-Conference | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | DONE |
Troy Cobbley
|
|
|
I spoke to the contractor about the hollow columns at the entry way. After speaking to Bill sprinkler protection will not be required in them as long as the fire stopping is installed and the noncombustible insulation is installed against the combustible surfaces
|
FIRE-Conference | 12/4/2003 | 12/4/2003 | 12/4/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 9:07:36 AM. Contact: ###-####. the GC will sheetrock the electrical room, janitors closet and willsprinkler above the ceiling in the breakroom; told GC to let sprinkler contractor know 12/4/2003 5:14:19 PM
|
FIRE-Conference | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | DONE |
Troy Cobbley
|
|
|
Advised contractor that outside canopy needs to be sheeted with noncombustible material or sprinkler protection will need to be provided. He agreed to provide sheet rock 11/21/2003 9:24:18 AM
|
BLD-Other | 11/19/2003 | 11/19/2003 | 11/19/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/19/2003 at 7:16:12 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 12:32:02 PM. Contact: ###-####. front ofice ok 11/18/2003 10:53:27 AM
|
BLD-Other | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 12:32:41 PM. Contact: ###-####. ok for grout pour 11/18/2003 10:53:00 AM
|
BLD-Foundation | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/29/2003 at 7:59:28 AM. Contact: ###-####.
|
BLD-Footing | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | PASS |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Darla Downs wip ok 10/24/2003 9:12:18 AM
|
BLD-Footing | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ron
|
BLD-Footing | 10/20/2003 | 10/21/2003 | 10/21/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/20/2003 at 1:26:00 PM. Contact: ###-####.
|
BLD-Footing | 10/15/2003 | 10/16/2003 | 10/16/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/15/2003 at 11:57:39 AM. Contact: ###-####. north side wall 10/16/2003 10:30:10 AM
|
BLD-Footing | 10/9/2003 | 10/13/2003 | 10/13/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/9/2003 at 1:09:12 PM. Contact: ###-####. rebar and ft ok. 10/13/2003 9:19:11 AM
|
BLD-Aging Inspection | 8/19/2003 | 8/19/2003 | 8/19/2003 | | PASS |
Tom Arcoraci
|
|
|
slow progress extended permit on 6-03 8/19/2003 9:34:28 AM
|
BLD-Conference | 6/11/2003 | 6/16/2003 | 6/16/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-#### wip slow extend permit 6/16/2003 10:43:52 AM
|
BLD-Aging Inspection | 3/28/2003 | 3/28/2003 | 3/28/2003 | | PASS |
Tom Arcoraci
|
|
|
|