Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-00431
StatusFinaled
Name NOEL FLINT
Site Address 6176 N EAGLE RD
Project NameTARGET COMMERCIAL
Customer Number 
ePlanReviewNo
Description
ZIONS BANK BUILDING - TO CONSTRUCT A NEW 6675 SQUARE FOOT, ONE STORY, WOOD FRAMED BANK BUILDING WITH A 1415 SQUARE FOOT BASEMENT AND RELATED SITE IMPROVEMENTS (MAIN BANK BUILDING 5590 SQUARE FEET, DRIVE-THRU CANOPY 1085 SQUARE FEET). ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH02-00007/CUP01-00156/PC#127-02/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval11/7/200211/6/200211/6/2002APASS
DetailsCarol Montgomery
Signed final
BLD-Final10/16/200210/17/200210/17/2002PPASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung OK for Perm. Occ. 10/17/2002 3:47:59 PM
FIRE-Final Inspection10/16/200210/17/200210/17/2002APASS
DetailsTroy Cobbley
the requirement for the knox box is no longer a requirement. Life/safety finaled 10/17/2002 10:48:16 AM
Permanent Occupancy 10/17/200210/17/2002 DONE
Details
BLD-Final10/11/200210/11/200210/11/2002APART
DetailsJim Sly
OK for Temp Occ.
BLD-Framing/Rough-in10/11/200210/11/200210/11/2002PPASS
DetailsJim Sly
CALL DAVID FIRST ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung should be final....Temp OK. 10/11/2002 11:52:59 AM
BLD-Final10/10/200210/10/200210/10/2002PFAIL
DetailsJim Sly
###-#### C/N...Firecaulk and damper at 1hr ceiling Bsmnt Mech rm. 10/10/2002 3:48:53 PM
BLD-Final10/8/200210/9/200210/9/2002ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/08/2002 at 12:38:47. Contact: ###-####. needs code enf to sign 10/9/2002 8:44:53 AM
BLD-Final10/3/200210/4/200210/4/2002PNR
DetailsJim Sly
###-#### tim
FIRE-Final Inspection10/3/200210/4/200210/4/2002PPART
DetailsTroy Cobbley
temporary occupancy given with dave millers permission until the knox box gets installed and the extinguishers get tagged 10/4/2002 2:03:05 PM
BLD-Framing/Rough-in9/27/20029/30/20029/30/2002APART
DetailsJim Sly
TIM ###-#### 9/30/2002 10:24:07 AM
BLD-Framing/Rough-in9/23/20029/23/20029/23/2002PPART
DetailsJim Sly
###-#### Conf on 1hr ceiling Bsmnt. 9/23/2002 2:51:03 PM
BLD-Framing/Rough-in9/19/20029/20/20029/20/2002APART
DetailsJim Sly
###-#### Ceiling grid main room OK. 9/20/2002 10:52:06 AM
BLD-Other9/12/20029/13/20029/13/2002APART
DetailsJim Sly
partial ceiling --tim ###-#### Perimeter offices OK for ceiling tile. 9/13/2002 12:02:06 PM
BLD-Framing/Rough-in8/16/20028/19/20028/19/2002APASS
DetailsJim Storey
TIM ###-#### TIM ###-####framing ok. 8/19/2002 11:11:16 AM
BLD-Framing/Rough-in8/13/20028/13/20028/13/2002PPART
DetailsJim Sly
tim ###-#### shear Roof nailing....OK. 8/13/2002 1:57:19 PM
BLD-Framing/Rough-in8/12/20028/12/20028/12/2002PCANC
DetailsJim Sly
early pm ###-#### Canc by contr. 8/12/2002 1:54:45 PM
BLD-Framing/Rough-in8/6/20028/7/20028/7/2002APART
DetailsRuss Owen
TIM ###-#### PARTIAL R/I AND A SHEAR NAIL roof area went over corrections with tim will recall. 8/7/2002 11:27:50 AM
BLD-Framing/Rough-in7/26/20027/26/20027/26/2002PPART
DetailsJim Sly
fn insp tim- ###-#### -roof nailing Roof diaphram nailing and straps. OK 7/26/2002 2:42:32 PM
BLD-Framing/Rough-in7/23/20027/24/20027/24/2002ANR
DetailsJim Sly
###-####\\partial
BLD-Framing/Rough-in7/23/20027/23/20027/23/2002PPART
DetailsDave Hannah
nailing \\###-#### shear nailing everything ok but for the back of the vault wall and two hold downs on the sw corners 7/23/2002 1:36:41 PM
BLD-Foundation6/17/20026/18/20026/18/2002APART
DetailsJim Sly
stem wall ###-#### kim East 1/2 of Bldg ( 2' stem wall).....Pending MTI insp, reports, and approvals. 6/18/2002 11:16:21 AM
BLD-Foundation6/12/20026/13/20026/13/2002APART
DetailsJim Sly
found wall -tim-###-#### 6/13/2002 10:42:51 AM Bsmnt walls ....Pending MTI insp and approvals. 6/13/2002 11:33:38 AM
BLD-Footing6/10/20026/11/20026/11/2002APART
DetailsJim Sly
kim ###-#### ft Footing for E wall E 1/2 of S wall and E 1/2 of N wall ....Pending MTI insp and approvals. 6/11/2002 12:11:09 PM 6/11/2002 12:19:46 PM
BLD-Footing6/4/20026/5/20026/5/2002PPART
DetailsJim Sly
###-#### Bsmnt Footing Pending special insp. and approval. Special insp Gary (MTI) appears to be qualified to do the job. 6/5/2002 3:36:54 PM