BLD-Final | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...struct. ok for c/o 7/12/2002 3:08:11 PM
|
Permanent Occupancy | | 7/12/2002 | 7/12/2002 | | DONE |
|
|
|
|
BLD-Final | 6/25/2002 | 6/27/2002 | 6/27/2002 | A | NR |
Carl Dependahl
|
|
|
###-#### ADRIAN verify htg final 6/27/2002 3:37:12 PM
|
BLD-Final | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PART |
Carl Dependahl
|
|
|
ok, pend perm plbg & cdhd 6/27/2002 4:10:30 PM
|
FIRE-Final Inspection | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 6/26/2002 2:26:11 PM
|
FIRE-Final Inspection | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | NR |
Rick Jackson
|
|
|
###-#### ADRIAN couldn't test duct detectors 6/26/2002 2:27:06 PM
|
FIRE-Final Inspection | 6/21/2002 | 6/21/2002 | 6/21/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 6/21/2002 8:45:54 AM occupant load sign; south exit door not installed; sprinkler heads painted; couldn't complete alarm test - no power to AHU's 6/21/2002 8:49:07 AM
|
BLD-Final | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | CANC |
Dave Hannah
|
|
|
###-#### adrian
|
FIRE-Hydro test above ground | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | NR |
Rick Jackson
|
|
|
###-#### adrian
|
BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/15/2002 | 5/15/2002 | 5/15/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### adrian walls ok 5/15/2002 5:20:32 PM
|
BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 15:52:50. Contact: ###-####....need elec r/i for int walls 5/13/2002 2:27:31 PM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### ADRIAN ok to cover ext wall at window areas pending other trades. no plbg or elec noted 5/3/2002 3:46:14 PM
|