Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-00500
StatusFinaled
Name HEWLETT-PACKARD CO
Site Address 11311 W CHINDEN BLVD
Project NameHP #5-1ST FLR
Customer Number 
ePlanReviewNo
Description
(HP BLDG #5-1ST FLOOR)(TONER TESTING FACILITY) To remodel a 5,887 sq.ft. area for new 'Toner Testing Facility' per approved plans on file and CZC02-00019. Work to include selective demolition within HP Building #6, existing Toner Lab in basement to relocate Thermatron Chamber to HP#5; To relocate existing Cartridge Test Lab from 1-3 Lower Link to HP#5; to construct interior non-bearing, non-combustible walls with sheetrock cover; relocate or install new access doors; re-assemble premanufactured testing equipment rooms & work cubicles; to add structural roof support for new mechanical; and to modify electrical, mechanical, plumbing, fire sprinkler & alarm systems per tenant needs and to comply with adopted codes. All per approved plans, red-line notes & attached plan review comments from reviewing agencies as part of the approved plans. PC#-02-143/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/29/20063/29/20063/29/2006APASS
DetailsJim Sly
DOC - Permit Finaled3/29/20063/29/20063/29/2006PPASS
DetailsJim Sly
Passed by T Acoraci, T Cobbley and C/C by Cathy W.
BLD-Final8/7/20028/9/20028/9/2002APASS
DetailsTom Arcoraci
###-#### DAN ok for perm 8/9/2002 8:46:34 AM
FIRE-Final Inspection8/7/20028/8/20028/8/2002APASS
DetailsTroy Cobbley
fire life/safety finaled 8/8/2002 2:51:07 PM
FIRE-Final Inspection8/2/20028/2/20028/2/2002AFAIL
DetailsTroy Cobbley
provide sign on fire riser door. Fire sprinkler permit finaled
BLD-Final7/17/20027/18/20027/18/2002PNR
DetailsTom Arcoraci
DAN ; Phone #: ###-####
FIRE-Final Inspection7/18/20027/18/20027/18/2002APASS
DetailsTroy Cobbley
Fire life/safety finaled. Fire alarm finaled. Fire sprinklers given temporary
BLD-Framing/Rough-in6/21/20026/24/20026/24/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/21/2002 at 11:41:32. Contact: ###-####. grid ok 6/24/2002 9:09:32 AM
BLD-Framing/Rough-in5/9/20025/10/20025/10/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/09/2002 at 09:40:52. Contact: ###-####. needs spec insp on welding walls ok to cover 5/10/2002 8:56:41 AM