BLD-Aging Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/11/2003 | 8/11/2003 | 8/11/2003 | | PASS |
Carl Dependahl
|
|
|
WIP... 8/11/2003 12:33:21 PM
|
BLD-Aging Inspection | 8/11/2003 | 8/11/2003 | 8/11/2003 | | PASS |
Carl Dependahl
|
|
|
WIP 8/11/2003 8:00:32 AM
|
BLD-Framing/Rough-in | 4/3/2003 | 4/4/2003 | 4/4/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 4:08:09 PM. ...complete air seal ok to insulate 4/4/2003 1:47:46 PM
|
BLD-Framing/Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 | P | PART |
Carl Dependahl
|
|
|
ok to cover at rear stair...show 2 layer drywall install at lid; complete fire blocks throughout, WIP 4/4/2003 4:51:30 PM
|
BLD-Foundation | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | PART |
Carl Dependahl
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs, stairwell wall at rear ok 1/30/2003 3:17:56 PM
|
BLD-Footing | 1/28/2003 | 1/28/2003 | 1/28/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/28/2003 at 06:53:30. Contact: ###-####...rear stairwell ftgs ok. 1/28/2003 11:38:15 AM
|
BLD-Conference | 1/23/2003 | 1/24/2003 | 1/24/2003 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/23/2003 at 16:46:51. Contact: .
|
BLD-Conference | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | PASS |
Carl Dependahl
|
|
|
consult hvac insp re ladder to roof req's 1/24/2003 3:19:16 PM
|
BLD-Framing/Rough-in | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | PART |
Carl Dependahl
|
|
|
need spec insp reports for welded frame, complete fireblocking & other insps 1/24/2003 3:21:56 PM
|
BLD-Conference | 9/30/2002 | 10/1/2002 | 10/1/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/30/2002 at 12:40:42. Contact: .
|
BLD-Concrete | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PART |
Carl Dependahl
|
|
|
moment frame ftg ok
|
BLD-Conference | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 10:54:22. Contact: .need verify roof diaphragm 9/27/2002 3:52:13 PM
|
BLD-Conference | 9/23/2002 | 9/24/2002 | 9/24/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 11:02:09. Contact: .w/ bldr re spec insp reqs....int ftgs for beam ok, need moment frame. 9/24/2002 4:28:39 PM
|