BLD-Final | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | NR |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Final | 1/17/2003 | 1/17/2003 | 1/17/2003 | P | FAIL |
Jim Sly
|
|
|
elliot--for 3245 wildwood; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie nr 1/17/2003 2:56:25 PM
|
BLD-Framing/Rough-in | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | PASS |
Dave Hannah
|
|
|
ELLIOT; Phone #: ###-#### Internet Inspection Request from: Annette Moore insulation ok framing c/n done ok to cover 9/19/2002 11:40:28 AM
|
BLD-Framing/Rough-in | 9/17/2002 | 9/18/2002 | 9/18/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### NR 9/18/2002 11:45:52 AM
|
BLD-Framing/Rough-in | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | FAIL |
Dave Hannah
|
|
|
c/n on site ok to insulate
|
BLD-Framing/Rough-in | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | PART |
Dave Hannah
|
|
|
###-#### shear walls ok to cover ext walls all but 8/19/2002 11:53:55 AM for back wall ok to cover after engin ok 8/19/2002 11:54:18 AM
|
BLD-Framing/Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### need eng to evaluate shear panels and staple per plan c/n on site same as 3221 and 3261 8/15/2002 5:17:56 PM
|
BLD-Framing/Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PART |
Dave Hannah
|
|
|
clint; Phone #: ###-#### 1hr fire wall second floor ok 7/30/2002 9:10:17 AM
|
BLD-Framing/Rough-in | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | PART |
Jim Sly
|
|
|
###-#### (2) 1hr walls (1st floor) OK. 7/24/2002 2:17:59 AM
|
BLD-Foundation | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 08:11:12. Contact: ###-####.everything but holddowns are complete 7/9/2002 1:00:51 PM
|
BLD-Footing | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | PART |
Dave Hannah
|
|
|
ft bill ###-#### work in progress setbacs ok 7/8/2002 11:33:24 AM
|