BLD-Aging Inspection | 2/26/2004 | 2/26/2004 | 2/26/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/12/2003 | 8/12/2003 | 8/12/2003 | | FAIL |
Carl Dependahl
|
|
|
contractor not at site... 8/12/2003 1:19:39 PM
|
BLD-Conference | 9/10/2002 | 9/10/2002 | 9/10/2002 | P | PASS |
Carl Dependahl
|
|
|
w/GS...memorial need handrails, spec insp reports , etc. 9/10/2002 4:33:54 PM
|
BLD-Footing | 7/23/2002 | 7/24/2002 | 7/24/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/23/2002 at 17:12:43. Contact: . forming in prgess ok to cover 7/24/2002 10:01:45 AM
|
BLD-Foundation | 7/2/2002 | 7/3/2002 | 7/3/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 20:10:53. Contact: ###-####.
|
BLD-Footing | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 10:03:44. Contact: ###-####. WIP STRATA DOING INSPS 6/25/2002 2:51:39 PM
|
BLD-Footing | 6/20/2002 | 6/20/2002 | 6/20/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/20/2002 at 07:25:20. Contact: ###-####. 6/20/2002 2:34:26 PM ending stratas report 6/20/2002 2:34:52 PM
|
BLD-Footing | 6/13/2002 | 6/14/2002 | 6/13/2002 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 11:40:14. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/13/2002 at 13:44:11.
|
BLD-Foundation | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 07:04:01. Contact: ###-####.
|
BLD-Concrete | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PART |
Jim Storey
|
|
|
wip 6/7/2002 11:09:01 AM
|
BLD-Footing | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 17:21:16. Contact: ###-####. wip 6/7/2002 11:09:10 AM
|
BLD-Concrete | 6/5/2002 | 6/6/2002 | 6/6/2002 | A | PART |
Carl Dependahl
|
|
|
strata onsite...pend report. 6/6/2002 9:50:39 AM
|
BLD-Footing | 6/5/2002 | 6/6/2002 | 6/6/2002 | A | PART |
Carl Dependahl
|
|
|
darren ###-#### masonry ok pend report. 6/6/2002 3:04:22 PM
|
BLD-Concrete | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | PART |
Carl Dependahl
|
|
|
strata onsite 6/5/2002 5:40:12 PM
|
BLD-Framing/Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | PART |
Carl Dependahl
|
|
|
block wall- darrin ###-#### ...pend spec insp report 6/5/2002 2:28:24 PM
|
BLD-Concrete | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | PART |
Carl Dependahl
|
|
|
DARREN ###-####...masonry, pending spec insp report. 6/4/2002 9:12:36 AM
|
BLD-Concrete | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | PART |
Carl Dependahl
|
|
|
masonry, 1st lift, east side...visual insp ok...has spec. insp.
|
BLD-Conference | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | PASS |
Carl Dependahl
|
|
|
darren...re spec insp req's; need scope -of- work statement...Strata has been onsite, left initial written report, no apparent discrepancies for 1st lift, east side of bridge 6/3/2002 3:36:15 PM
|
BLD-Conference | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | CANC |
Carl Dependahl
|
|
|
"pre-con" resub for masonry is approved by Marlene; need spec insp for masonry( & concrete all ready placed??? approved by 425) will advise who will do insps; met w/ Mickelson Masony foreman, advised not to grout prior to insp.
|
BLD-Footing | 5/28/2002 | 5/29/2002 | 5/29/2002 | P | NR |
Carl Dependahl
|
|
|
FT INSP DARREN ###-#### FTGS ONLY...OK TO USE # 6 bar in lieu of # 4 5/29/2002 5:02:15 PM
|
BLD-Footing | 5/24/2002 | 5/28/2002 | 5/28/2002 | P | NR |
Carl Dependahl
|
|
|
ft insp -- darin- ###-####...need verts installed. 5/28/2002 4:01:37 PM
|
BLD-Footing | 5/24/2002 | 5/28/2002 | 5/28/2002 | P | CANC |
Carl Dependahl
|
|
|
DARREN ###-####
|
BLD-Footing | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | PART |
Dave Hannah
|
|
|
###-#### ftg for area south of 9th st ok to pour 5/24/2002 9:55:56 AM
|
BLD-Conference | 5/15/2002 | 5/15/2002 | 5/15/2002 | P | PASS |
Carl Dependahl
|
|
|
met w/ Les Bock & contractor....requests change to masonry ret. wall; supply calcs & soils report...& written letter with reasoning and requesting change. If all else ok, I'd allow change
|