BLD-Final | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | PASS |
Dave Hannah
|
|
|
c.c # 17617 issued 7/31/2002 2:18:26 PM
|
BLD-Final | 7/29/2002 | 7/30/2002 | 7/30/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### cn posted on handrails and guardrails 7/30/2002 2:56:14 PM
|
BLD-Final | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | CANC |
Dave Hannah
|
|
|
RANDY TROY ###-#### CODE # 7550; Phone #: ###-####
|
BLD-Energy code compliance | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Steven Webb
|
|
|
TROY ###-#### OR ###-####
|
BLD-Framing/Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Steven Webb
|
|
|
TROY ###-#### OR ###-####
|
BLD-Framing/Rough-in | 6/6/2002 | 6/7/2002 | 6/7/2002 | P | FAIL |
Dave Hannah
|
|
|
randy ###-#### or troy- ###-#### c/n on site ok to insulate 6/7/2002 1:41:03 PM
|
BLD-Framing/Rough-in | 5/21/2002 | 5/23/2002 | 5/23/2002 | P | PART |
Steven Webb
|
|
|
shear wall \\###-#### C/N posted --Ext. shear ok--cripple walls need to be 2" X 6" to comply with 97 UBC 2320.11.5 (at least the same size as the stud above) and cripple walls exceeds 14" in height--wall bracing required--Check at framing. 5/23/2002 2:47:51 PM
|
BLD-Foundation | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PART |
Dave Hannah
|
|
|
###-#### MANA work in progress rebar and wall lines marked checked setbacks all look ok 5/2/2002 9:47:33 AM
|
BLD-Footing | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Steven Webb
|
|
|
ft mana- ###-#### wip-75% ready at time of inspection. 5/1/2002 3:16:13 PM
|