Permit Information
Permit NumberBLD02-00798
StatusFinaled
Name SPACEMATES LIMITED PARTNERSHIP
Site Address 704 N 17TH ST
Project NameCHRISMAN DENTAL
Customer Number 
ePlanReviewNo
Description
ANDREW CHRISMAN DENTAL OFFICE REMODEL AND ADDITION - Remodel & addition to existing dental office with a new basement addition which inlcudes a 402 sq. ft. mechancial room and a 752 sq. ft. single family dwelling, with a 1619 sq. ft. one story office addition to the existing building. All work is per approved plans and attachments and DRH01-00087 CUP01-00074 CAR01-00023.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/25/20033/26/20033/26/2003APASS
DetailsCarl Dependahl
rick; Phone #: ###-#### Internet Inspection Request from: Annette Moore...ok for c/o, card to contractor. 3/26/2003 10:34:21 AM
Permanent Occupancy 3/26/20033/26/2003 DONE
Details
BLD-Final1/16/20031/16/20031/16/2003PPART
DetailsCarl Dependahl
temp occ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...ok for t/o... 1/16/2003 4:19:39 PM
FIRE-Final Inspection1/3/20031/6/20031/6/2003APASS
DetailsRick Jackson
rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in12/5/200212/6/200212/6/2002APART
DetailsCarl Dependahl
ceiling insp -rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...grid extensions at existing office area...add spreader bars 12/6/2002 10:53:48 AM
BLD-Framing/Rough-in12/5/200212/6/200212/6/2002PPART
DetailsCarl Dependahl
ceiling insp -rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...ok, chk for spreaders at final ...existing office area. 12/6/2002 2:54:17 PM
BLD-Framing/Rough-in11/14/200211/15/200211/15/2002APART
DetailsTony Young
rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
west main floor framing ok pending trades, and fire blocking ceiling line 11/15/2002 11:11:29 AM
BLD-Framing/Rough-in10/24/200210/24/200210/24/2002PPART
DetailsCarl Dependahl
ceiling; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...bsmt ok, add firestops at pipes... 10/24/02 6:19:50 PM
BLD-Framing/Rough-in10/21/200210/22/200210/22/2002APART
DetailsCarl Dependahl
###-####...ok to insulate & place hat channel at bsmt mech rm for 1hr lid....will chk screws for oc spacing when gyp installed. 10/22/02 9:29:00 AM
BLD-Framing/Rough-in10/16/200210/17/200210/17/2002PPART
DetailsCarl Dependahl
ceiling; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung... grid ok 10/17/02 3:45:32 PM
BLD-Conference10/8/200210/8/200210/8/2002APASS
DetailsCarl Dependahl
re add'l soffit frame, need hvac insp for ducts inside.
BLD-Framing/Rough-in10/8/200210/8/200210/8/2002PPART
DetailsCarl Dependahl
###-#### soffit ok...below 1hr lid, need hvac ok for ducts 10/9/02 10:04:54 AM
BLD-Framing/Rough-in9/27/20029/27/20029/27/2002PPART
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung... soffit ok pending truss eng's ok; complete fireblocks, chk at grid insp. 9/29/2002 3:40:49 PM
BLD-Energy code compliance9/19/20029/20/20029/20/2002PPASS
DetailsTom Arcoraci
rick ###-#### cell
BLD-Framing/Rough-in9/19/20029/20/20029/20/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/19/2002 at 11:32:03. Contact: ###-####. ok to cover still needs insp at mech room 9/20/2002 12:46:21 PM
BLD-Framing/Rough-in9/17/20029/18/20029/18/2002AFAIL
DetailsCarl Dependahl
rick cell ###-####
BLD-Framing/Rough-in9/18/20029/18/20029/18/2002PFAIL
DetailsCarl Dependahl
c/n, need truss calcs & for soffit..ok to insul 9/18/2002 6:42:27 PM
BLD-Framing/Rough-in9/16/20029/17/20029/17/2002ACANC
DetailsDave Hannah
rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--cancel per rick
BLD-Framing/Rough-in9/16/20029/17/20029/17/2002ACANC
DetailsDave Hannah
rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Conference9/5/20029/6/20029/6/2002APART
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung, re r-3 in bsmt, need emer egress, 1hr lid... 9/6/2002 9:33:32 AM
BLD-Framing/Rough-in9/6/20029/6/20029/6/2002PFAIL
DetailsCarl Dependahl
For Carl, see history, C/N issued: provide & firestop 1HR LID/ OCC. SEPARATION 9/6/2002 5:58:24 PM
BLD-Footing8/21/20028/21/20028/21/2002PPART
DetailsDave Hannah
Phone #: ###-#### front colm pads ok to pour 8/21/2002 3:02:40 PM
BLD-Conference8/19/20028/19/20028/19/2002PPASS
DetailsCarl Dependahl
w/ bldr & HVAC re occ. sep, framing, etc.
BLD-Footing8/19/20028/19/20028/19/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/19/2002 at 07:42:58. Contact: ###-####. Pop out section (south of building)rebar exceeds plans). Footing and foundation formed together. 8/19/2002 3:36:46 PM
BLD-Footing8/19/20028/19/20028/19/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/19/2002 at 07:42:58. Contact: ###-####. ext pop-out at front ok. 8/19/2002 4:27:13 PM
BLD-Conference7/31/20027/31/20027/31/2002PPASS
DetailsTony Young
w/ contractor,,, rick, about s. i. requirements,, will have from here on out
BLD-Foundation7/30/20027/31/20027/31/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 07/30/2002 at 08:54:40. Contact: ###-####.pending s. i. report 7/31/2002 2:27:30 PM
BLD-Footing7/24/20027/25/20027/25/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/24/2002 at 12:52:50. Contact: ###-####.
BLD-Foundation7/10/20027/11/20027/11/2002APART
DetailsTony Young
RICK ###-####
BLD-Footing7/9/20027/10/20027/10/2002APART
DetailsCarl Dependahl
RICK ###-####
BLD-Foundation7/9/20027/10/20027/10/2002APART
DetailsCarl Dependahl
RICK ###-####
BLD-Foundation7/2/20027/3/20027/3/2002APART
DetailsTony Young
found- rick ###-####
wip on forming only, rebar looked at by 301 7/3/2002 12:18:26 PM
BLD-Footing7/1/20027/2/20027/2/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/01/2002 at 13:19:52. Contact: ###-####.ft and wall for first support locations ok to place rebar ok splice is hammered into the soil to be checked on next set up for progrection. 7/2/2002 2:02:54 PM