BLD-Final | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 07:34:02. Contact: ###-####.
|
BLD-Energy code compliance | 6/4/2002 | 6/4/2002 | 6/4/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 10:20:00. Contact: ###-####.insulation ok. 6/4/2002 3:13:16 PM
|
BLD-Framing/Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 08:50:19. Contact: ###-####. ok to insulate 6/3/2002 4:57:29 PM
|
BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | A | FAIL |
Jim Storey
|
|
|
1. table 23 nailling schedule nail bottom wall plate to mud sill plate with 16p nails at 16 inches oc.
2. north side of garage door header not supported at king stud and trimer to foundation.
|
BLD-Wall cover | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Jim Storey
|
|
|
sheer ok
|
BLD-Foundation | 5/3/2002 | 5/7/2002 | 5/7/2002 | A | DONE |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 12:30:51. Contact: ###-####. Scheduled by a walls placed with out insp / back fill in place.contractor via Hello! on 05/03/2002 at 12:30:51. Contact: ###-####. 5/7/2002 8:43:12 AM
|
BLD-Footing | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 12:30:08. Contact: ###-####. wip rebar on truck 5/6/2002 11:08:55 AM
|