BLD-Final | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | FAIL |
Steven Webb
|
|
|
jay ; Phone #: ###-#### C/N--Need to seal garage penetration; verify rim insulation; full coverage on visqueen in crawl; an additional ballister on deck guardrail and handrail needed on deck stairs. 8/13/2002 10:51:33 AM
|
BLD-Final | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | PASS |
Steven Webb
|
|
|
jay may need to use back door as jay is putting in hard wood at front door; Phone #: ###-#### C. of C. #23304 issued. 8/13/2002 2:02:26 PM
|
BLD-Framing/Rough-in | 6/14/2002 | 6/17/2002 | 6/17/2002 | A | PASS |
Steven Webb
|
|
|
MIKE ###-#### Ok to cover 6/17/2002 11:44:46 AM
|
BLD-Framing/Rough-in | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | PART |
Steven Webb
|
|
|
###-#### mike fr C/N--Ok to insulate 6/13/2002 4:02:12 PM
|
BLD-Framing/Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 | P | PART |
Steven Webb
|
|
|
MIKE ###-#### SHEER WALL Ok to side. 6/4/2002 3:08:44 PM
|
BLD-Framing/Rough-in | 5/31/2002 | 6/3/2002 | 6/3/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### C/N--Install holdowns, missing shear panels, nail per plans and excessive penetration on nails in panels. 6/3/2002 8:57:04 AM
|
BLD-Energy code compliance | 5/30/2002 | 5/31/2002 | 5/31/2002 | P | NR |
Steven Webb
|
|
|
SHEER WALL ###-#### JAY--Shear not energy--not ready for inspection. 5/31/2002 3:01:24 PM
|
BLD-Foundation | 4/30/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Steven Webb
|
|
|
###-#### JAY 75% ready at time of inspection. 5/1/2002 4:10:03 PM
|
BLD-Footing | 4/29/2002 | 4/30/2002 | 4/30/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### JAY
|