BLD-Final | 9/19/2002 | 9/23/2002 | 9/23/2002 | A | PASS |
Jim Sly
|
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/C issued. 9/23/2002 11:54:39 AM
|
BLD-Energy code compliance | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 09:49:15. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 10:27:19. Contact: ###-####. ok to insulate 6/25/2002 2:22:40 PM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/19/2002 at 08:10:34. Contact: ###-####.needs foam seal package and fire blocking at fireplace chase 6/19/2002 2:25:25 PM
|
BLD-Wall cover | 5/29/2002 | 5/29/2002 | 5/29/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 06:50:02. Contact: ###-####. shear ok to cover ext need to check reto hold downs at framing 5/29/2002 11:30:39 AM
|
BLD-Wall cover | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 08:39:44. Contact: ###-####. hold downs in wrong locations nailing on panels needs tobe added 5/28/2002 2:43:06 PM
|
BLD-Foundation | 5/10/2002 | 5/10/2002 | 5/10/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 06:39:06. Contact: ###-####. WIP, also informed contractor that the plans show hold downs. Drawn in by our office, not shown on plan submittals, as required by the uniform building code, note also plans not to scale as required. 5/10/2002 11:14:07 AM
|
BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PART |
Dave Hannah
|
|
|
|
BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PART |
Dave Hannah
|
|
|
###-#### chris
|