BLD-Final | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 16:38:56. Contact: ###-####. C. of C. #23313 issued. 8/28/2002 12:03:48 PM
|
BLD-Framing/Rough-in | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 10:14:29. Contact: 08660768.Back porch modification--ok to finish--re-submitted to plan review--ok by Dan Overy. 7/10/2002 4:42:14 PM
|
BLD-Energy code compliance | 6/27/2002 | 6/28/2002 | 6/28/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 10:22:51. Contact: ###-####. Energy ok to cover house--framer was building covered structural patio at rear of house--not on plans--wrote C/N which stated no cover or pouring of concrete prior to securing permit and getting inspection. 6/28/2002 2:58:02 PM
|
BLD-Framing/Rough-in | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 16:24:46. Contact: ###-####. C/N--Ok to insulate PENDING mechanical r.i. 6/26/2002 3:43:16 PM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/19/2002 at 08:47:13. Contact: ###-####. Shear-C/N--Missing holdowns--Retrofit prior to framing inspection. Ok to cover exterior. 6/19/2002 3:36:55 PM
|
BLD-Framing/Rough-in | 6/17/2002 | 6/18/2002 | 6/18/2002 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 11:34:21. Contact: ###-####.C/N posted--No approved plans on site. 6/18/2002 3:28:32 PM
|
BLD-Foundation | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PART |
Steven Webb
|
|
|
###-#### jerry found wip 5/23/2002 3:30:39 PM
|
BLD-Footing | 5/21/2002 | 5/22/2002 | 5/22/2002 | A | PASS |
Steven Webb
|
|
|
JERRY ###-####
|