(ADA COUNTY COURTHOUSE - 2ND FLR SHOWER/TOILET/LOCKER ROOMS) This building is fire sprinklered because it has an occupied floor more than 55 feet above Fire Department vehicular access. To construct two 308 square foot shower/toilet/locker rooms on the 2nd floor of the Ada County courthouse building. Each shower/toilet/locker room shall have an accessible shower, toilet, locker, and basin. In addition, the Men's room shall have an accessible urinal. The existing 1-hr corridor is being modified. Work is to include a 20-minute corridor door, 1-hr corridor wall, and finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/10/20036/10/20036/16/2003 DONE
DetailsCarl Dependahl
BLD-Aging Inspection4/9/20034/9/20034/9/2003 DONE
DetailsCarl Dependahl
previously finalled..."ok for l/c". 4/9/2003 9:11:33 AM struct ok; hvac is grouped to wrong struct permit. 4/9/2003 9:17:30 AM
BLD-Conference4/9/20034/9/20034/9/2003PPASS
DetailsCarl Dependahl
w Linda H...mec shouldn't be grouped 4/9/2003 5:25:56 PM
BLD-Final11/4/200211/5/200211/5/2002APASS
DetailsCarl Dependahl
Lee; ok for c/o (l/c) 11/5/02 11:19:58 AM
BLD-Final11/4/200211/4/200211/4/2002PNR
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Final10/7/200210/8/200210/8/2002APASS
DetailsRick Jackson
###-#### robin
BLD-Framing/Rough-in8/28/20028/29/20028/29/2002PPART
DetailsCarl Dependahl
corridor wall ok,chk firestops at final 8/29/2002 6:08:55 PM
BLD-Framing/Rough-in8/28/20028/28/20028/28/2002PPART
DetailsCarl Dependahl
###-#### screen walls at entry(s) ok; finishes at 48" opening. 8/28/2002 2:18:18 PM
BLD-Framing/Rough-in8/26/20028/27/20028/27/2002PPART
DetailsCarl Dependahl
###-#### NEW SECTION CORRIDOR WALL OK. 8/27/2002 4:01:12 PM
BLD-Conference8/19/20028/20/20028/20/2002APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/19/2002 at 15:52:51. Contact: ###-####. w/ bldr, provide width req'd at ADA shower & per fig 403.5 at "pathway"; referred dead-end issue to IBC 1004.3.2.3 (50' if serves B occ.) 8/20/2002 12:27:22 PM
BLD-Conference8/20/20028/20/20028/20/2002APASS
DetailsCarl Dependahl
provide width per fig 403.5 at shower and as needed at doors... 8/20/2002 2:25:21 PM
BLD-Conference8/16/20028/19/20028/19/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/16/2002 at 14:38:35. Contact: ###-####...need plan, unable to verify site as doors security locked. recall. 8/20/2002 7:45:11 AM
FIRE-Conference8/13/20028/13/20028/13/2002PDONE
DetailsTroy Cobbley
discussed fire alarm and fire sprinkler requirements for the addition of one door outside of the mens and womens lockers and the relocation of one door to the judges chambers 8/13/2002 1:56:02 PM
BLD-Conference8/9/20028/12/20028/12/2002APASS
DetailsJim Sly
Met with Robin....Need Min. 36" clear (Mens showers to wall) as per appr plan..... Remove part of existing walls to obtain. 8/12/2002 10:23:02 AM 8/12/2002 10:23:45 AM
BLD-Conference8/8/20028/9/20028/9/2002ANR
DetailsCarl Dependahl
recall for 8-12 8/9/2002 9:08:01 AM
BLD-Conference8/8/20028/8/20028/8/2002PPASS
DetailsCarl Dependahl
ROBIN ; Phone #: ###-####