Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-01001
StatusExpired
Name GART SPORTS
Site Address 1301 N MILWAUKEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**Gart Sports / Roof Repair)** TO REPAIR A 2,003 SQ FT PORTION OF A COLAPSED ROOF IN THE SOUTH EAST CORNER OF BUILDING PER PLANS AND ATTACED ENGINEERING. WORK WILL INCLUDE CONSTRUCTION OF AN EIGHT FOOT HIGH PLYWOOD BARRIER AROUND THE PERIMETER OF THE DAMAGED AREA TO PROTECT THE PUBLIC WHILE WORK IS IN PROGRESS. TO REMOVE DEBRIES AND PROTECT THE AREA FROM THE WEATHER, PROVISIONS MUST BE MADE TO DRAIN ANY WATER THAT MAY ACCUMALATE ON THE ROOF WHILE WORK IS IN PROGRESS. REPAIRS WILL CONSIST OF REPLACING 12 ROOF JOISTS AND ROOF SHEATHING, A SEPARATE PERMIT WILL BE REQUIRED TO FIX THE DAMAGE SPRINKLER SYSTEM, ROOFING PERMIT IS UNDER A SEPARATE PERMIT. (RMH)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired  8/2/2006 DONE
BLD-Aging Inspection7/26/20067/26/20067/26/2006 CANC
DetailsMike Jordan
BLD-Aging Inspection5/23/20065/23/20065/23/2006 DONE
DetailsMike Jordan
BLD-Aging Inspection3/23/20063/23/20063/23/2006 CANC
DetailsMike Jordan
DOC - Permit Expired3/23/20063/23/20063/23/2006ADONE
DetailsMike Jordan
Was expired perviously.
BLD-Framing/Rough-in5/6/20025/6/20025/6/2002APASS
DetailsRuss Owen
Scheduled by Inspector: 407 On 5/6/2002 7:54:21 AM Ok to cover wall to roof deck/joist straps. Called Brian ###-#### and informed ok.5/6/2002 12:07:54 PM 5/6/2002 12:10:40 PM
BLD-Framing/Rough-in5/2/20025/3/20025/3/2002APART
DetailsRuss Owen
Scheduled by Inspector: 407 On 5/2/2002 4:37:18 PM . went over job with plan reveiw. 5/3/2002 3:20:19 PM
BLD-Framing/Rough-in5/3/20025/3/20025/3/2002PFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 5/3/2002 6:39:40 PM Talked with engineer he has done a field reveiw, the hols hove been drilled and bolts have not been placed, Now I have driven from a job site to verify the placement of these bolts, they are in, but the nut can not be tightened untill the epoxy has dried, I have left a c/n to not cover untillI have re-inspected. The roofer had informed me he was planning on covering these. I called contractor back , and told him this , and when I was leaving rapid resonce was at site i informeed them of the correction I had placed. NOTE: THIS WAS NOT A CALLED IN INSPECTION. 5/3/2002 6:52:35 PM
BLD-Framing/Rough-in5/3/20025/3/20025/3/2002AFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 5/3/2002 6:41:13 PM The roof straps do not have the correct bolt, needs hilti epoy, also the existing straps need blocking under, called engineer, contractor on site, also talked with framer, The engineer will address a fix. C/n given to contractor.Note prior entry this am was a mistake, should be cancelled this is correct..3/2002 6:45:21 PM 5/3/2002 6:45:52 PM 5/3/2002 6:46:47 PM
BLD-Framing/Rough-in4/26/20025/2/20025/2/2002PPART
DetailsRuss Owen
late pm Kenny ###-#### New roof trusses are in place, The cmu wall to top cord of truss straps are not in place, also roof nailing not yet complete, will recall for am. 5/2/2002 4:35:41 PM 5/2/2002 4:36:52 PM