BLD-Final | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm occ 10/11/2002 12:07:21 PM
|
Permanent Occupancy | | 10/11/2002 | 10/11/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | 9/17/2002 | 9/16/2002 | 9/16/2002 | A | DONE |
Carol Montgomery
|
|
|
Meets approval with CU.
|
BLD-Final | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 16:13:32. Contact: ###-####. ok for temp cn issued for some handrails and missing door 8/29/2002 10:05:28 AM
|
FIRE-Final Inspection | 8/29/2002 | 8/29/2002 | 8/29/2002 | A | PASS |
Troy Cobbley
|
|
|
Life/safety items OK but exterior door hardware needs to be changed to approved type and verified by structural inspector
|
BLD-Framing/Rough-in | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 19:23:18. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 08:43:38. Contact: ###-####. CN POSTED 7/17/2002 11:08:33 AM
|
BLD-Framing/Rough-in | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 08:39:25. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/16/2002 at 08:42:09.
|
BLD-Framing/Rough-in | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 11:43:40. Contact: ###-####.went over framing beams and old hand stack all looks ok 7/9/2002 11:20:14 AM
|
BLD-Foundation | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 06:29:18. Contact: ###-####.
|
BLD-Footing | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### chuck
|